Zakon o potvrđivanju Okvirnog sporazuma o zajmu LD 2009 ADD 1 (2025) između Banke za razvoj Saveta Evrope i Republike Srbije za projektni zajam - Univerzitetska dečja klinika, Tiršova 2

Status propisa

Na snazi

Prikazana Verzija

Nema dostupnih verzija

Opšte Informacije

DonosilacNarodna skupština Republike Srbije

Zakon o potvrđivanju Okvirnog sporazuma o zajmu LD 2009 ADD 1 (2025) između Banke za razvoj Saveta Evrope i Republike Srbije za projektni zajam - Univerzitetska dečja klinika, Tiršova 2

Član1.
Potvrđuje se Okvirni sporazum o zajmu LD 2009 ADD 1 (2025) između Banke za razvoj Saveta Evrope i Republike Srbije za projektni zajam - Univerzitetska dečja klinika, Tiršova 2, koji je potpisan u Parizu 24. oktobra 2025. godine i u Beogradu 29. oktobra 2025. godine, u originalu na engleskom jeziku.
Član2.
Tekst Okvirnog sporazuma o zajmu LD 2009 ADD 1 (2025) između Banke za razvoj Saveta Evrope i Republike Srbije za projektni zajam - Univerzitetska dečja klinika, Tiršova 2, u originalu na engleskom jeziku i u prevodu na srpski jezik glasi:
Ugovor — engleski tekstČl. 1.1–7.4

UvodUvod
LD 2009 ADD 1 (2025)
FRAMEWORK LOAN AGREEMENT
between
COUNCIL OF EUROPE DEVELOPMENT BANK
and
REPUBLIC OF SERBIA
TIRŠOVA 2 UNIVERSITY CHILDREN'S HOSPITAL
– Project Loan –
TABLE OF CONTENTS
1. INTERPRETATION ......................................................................................................... 5
1.1 DEFINITIONS .............................................................................................................. 5 1.2 CONSTRUCTION ......................................................................................................... 8 1.3 HEADINGS ................................................................................................................. 8 1.4 ROUNDING ................................................................................................................ 8
2. CONDITIONS ................................................................................................................. 9
3. PURPOSE ...................................................................................................................... 9
4. FINANCIAL CONDITIONS.............................................................................................. 9
4.1 LOAN AMOUNT ........................................................................................................... 9 4.2 DISBURSEMENT AMOUNT ........................................................................................... 9 4.3 DISBURSEMENT PROCEDURE...................................................................................... 9 4.4 DISBURSEMENT PERIOD ........................................................................................... 10 4.5 DISBURSEMENT CONDITIONS .................................................................................... 10 4.6 REPAYMENT ............................................................................................................ 11 4.7 PREPAYMENT .......................................................................................................... 11 4.8 INTEREST DETERMINATION ....................................................................................... 12 4.9 DEFAULT INTEREST RATE ......................................................................................... 12 4.10 MARKET DISRUPTION EVENT .................................................................................... 12 4.11 PAYMENTS .............................................................................................................. 14
5. PROJECT IMPLEMENTATION .................................................................................... 14
5.1 DUTY OF CARE ........................................................................................................ 14 5.2 ALLOCATION PERIOD ................................................................................................ 14 5.3 PROJECT COSTS ..................................................................................................... 15 5.4 PROJECT SPECIFIC UNDERTAKINGS .......................................................................... 15 5.5 PROCUREMENT........................................................................................................ 15 5.6 ENVIRONMENTAL AND SOCIAL SAFEGUARDS ............................................................. 15 5.7 HUMAN RIGHTS ....................................................................................................... 15 5.8 INTEGRITY ............................................................................................................... 15 5.9 VISIBILITY ................................................................................................................ 16
6. MONITORING ............................................................................................................... 17
6.1 REPORTING ............................................................................................................. 17 6.2 VISITS ..................................................................................................................... 17 6.3 AUDIT ..................................................................................................................... 17 6.4 PROJECT INFORMATION ........................................................................................... 17 6.5 BORROWER INFORMATION ........................................................................................ 18 6.6 FINANCIAL COVENANTS ............................................................................................ 18
7. PARI PASSU ................................................................................................................ 18
7.1 RANKING ................................................................................................................. 18 7.2 SECURITY ................................................................................................................ 19 7.3 CLAUSE BY INCLUSION ............................................................................................. 19 7.4 PREPAYMENT TO THIRD PARTIES .............................................................................. 19
8. REPRESENTATIONS AND WARRANTIES ................................................................. 20
9. THIRD PARTIES ........................................................................................................... 21
10. NON-WAIVER ........................................................................................................... 21
11. TRANSFER ............................................................................................................... 21
12. ILLEGALITY.............................................................................................................. 21
13. NO HARDSHIP ......................................................................................................... 21
14. GOVERNING LAW .................................................................................................... 21
15. DISPUTES ................................................................................................................ 22
16. DATA PROTECTION ................................................................................................ 22
17. NOTICES .................................................................................................................. 22
18. TAXES AND EXPENSES .......................................................................................... 23
19. DISCHARGE ............................................................................................................. 24
20. ENTRY INTO FORCE ............................................................................................... 24
APPENDIX 1 ........................................................................................................................ 26
APPENDIX 2 ........................................................................................................................ 29
APPENDIX 3 ........................................................................................................................ 31
APPENDIX 4 ........................................................................................................................ 33
APPENDIX 5 ........................................................................................................................ 34 COUNCIL OF EUROPE DEVELOPMENT BANK, international organisation with its headquarters at 55, avenue Kléber, 75116 Paris (France) (hereinafter, the “CEB” or the “Bank”), on the one hand,
and
The REPUBLIC OF SERBIA, (hereinafter, the “Borrower” and together with the CEB, the “Parties” and each a “Party”), on the other hand,
WHEREAS
(A) Having regard to the Framework Loan Agreement between the Parties dated 20 November 2019 with reference LD 2009 (2019) (the "Original Agreement") under which the CEB agreed to make available to the Borrower a loan in the amount of up to EUR 54,000,000 (the "Initial Loan"),
(B) Having regard to the loan application submitted by the Republic of Serbia through its Ministry of Finance on 7th August 2025, whereby the Borrower requested to increase the amount of the Initial Loan by fifty million Euros (EUR 50,000,000), for the partial financing of the Tiršova University Children's Hospital,
(C) Having regard to the CEB’s Administrative Council approval on 1 October 2025 of the said loan application, increasing the amount of Initial Loan by fifty million Euros (EUR 50,000,000) for the partial financing of the Tiršova University Children's Hospital with reference LD 2009 ADD 1 (2025),
(D) Having regard to the Third Protocol dated 6 March 1959 to the General Agreement on Privileges and Immunities of the Council of Europe dated 2 September 1949,
(E) Having regard to the CEB’s Loan Regulations, as adopted by the CEB’s Administrative Council Resolution 1587 (2016) (hereinafter, the “Loan
Regulations”),
(F) Having regard to the CEB’s Loan and Project Financing Policy, as adopted by the CEB’s Administrative Council Resolution 1646 (2022) (hereinafter, the
“Loan Policy”),
(G) Having regard to the CEB’s Environmental and Social Safeguards Policy, as adopted by the CEB’s Administrative Council Resolution 1588 (2016)
(hereinafter, the “Environmental and Social Safeguards Policy”),
(H) Having regard to the CEB’s Procurement Guidelines, as adopted by the CEB’s Administrative Council in September 2011 (hereinafter, the
“Procurement Guidelines”),
(I) Having regard to the CEB’s Data Protection Regulation, as adopted by the CEB’s Administrative Council Resolution 1639 (2022) (hereinafter, the “Data
Protection Regulation”),
(J) Having regard to the CEB’s Anti-Corruption Charter, as adopted by the CEB’s Administrative Council Resolution 1628 (2021), and (K) Having regard to the CEB’s Policy on Non-compliant/Uncooperative Jurisdictions, as adopted by the CEB’s Administrative Council Resolution 1630 (2021),
HEREBY AGREE AS FOLLOWS:
1.Čl. 1.1–1.4

INTERPRETATION

Clause1.1

Definitions

The following terms shall have the meaning indicated below, except as the context requires otherwise:
“Agreement” means this framework loan agreement, including its appendices.
“Allocation” means the commitment of a Tranche by the Borrower to the eligible component parts of the Project even if such Tranche has not yet been paid out under the Project.
“Allocation Period” has the meaning specified under Sub-
“Business Day” means, relation to payments in Euro, any day on which T2 (the real time gross settlement system operated by the Eurosystem) or any successor system is open for the settlement of payments in euro.
“Certificate” has the meaning specified under Sub- and the form stipulated under Appendix 4 hereto.
“Closing Date” means the date specified under Appendix 1 hereto from which no further disbursements under the Loan may take place. Such date may be modified upon prior written consent of both Parties, by means of an exchange of letters.
“Completion Report” has the meaning specified under Sub-.
“Cross-Default Event” has the meaning specified under Sub-
“Currency” means, for the purposes of the Agreement, Euro.
“Day Count Convention” means the convention for determining the number of days between two dates and the number of days in a year specified in the relevant Disbursement Notice.
“Debt Instrument” means (i) any loan or other form of financial indebtedness; (ii) an instrument, including any receipt or statement of account, evidencing or constituting an obligation to repay a loan, deposit, advance or similar extension of credit (including without limitation any extension of credit under a refinancing or rescheduling agreement), (iii) a bond, note, debt security, debenture or similar written evidence of financial indebtedness; or (iv) an instrument evidencing a guarantee of an obligation constituting financial indebtedness of another.
“Default Interest Rate” has the meaning specified under Sub-
“Disbursement Date” means the date on which a Tranche is scheduled to be disbursed pursuant to the applicable Disbursement Notice. “Disbursement Notice” has the meaning specified under Sub-.
“Disbursement Request” has the meaning specified under Sub-.
“EU” means the European Union.
“EURIBOR” means the percentage rate quoted by any financial news provider acceptable to the CEB at or about 11.00 a.m. Brussels time on the Interest Determination Date as the Euro wholesale funding rate administrated by the European Money Market Institute (or any other entity which takes over the administration of that rate) for the same period as the relevant Interest Period.
If the relevant Interest Period is not the same as a period quoted by the relevant financial news provider, the applicable EURIBOR shall be the percentage rate resulting from a linear interpolation by reference to two (2) EURIBOR rates, one of which is applicable for a period of whole months next shorter and the other for a period of whole months next longer than the length of the relevant Interest Period.
“Euro” and the sign “EUR” means the lawful currency of the Member States of the EU which from time to time adopt it as their currency in accordance with the relevant provisions of the Treaty of the EU and the Treaty on the Functioning of the EU or their succeeding treaties.
“European Convention on Human Rights” means the Convention for the Protection of Human Rights and Fundamental Freedoms dated 4 November 1950, CETS No. 5, as amended from time to time.
“European Social Charter” means the European Social Charter dated 3 May 1996, CETS No. 163, as amended from time to time.
“Final Beneficiaries” are specified under Appendix 1 hereto as the group benefitting from the social effects of the Project.
“Fixed Interest Rate” means the interest rate per annum specified in the applicable Disbursement Notice.
“Floating Interest Rate” means the interest rate per annum determined by adding or subtracting the Spread specified in the applicable Disbursement Notice to or from, as the case may be, the Reference Rate.
For the avoidance of doubt, when the determination of the Floating Interest Rate results in a negative interest rate (due to a quoted negative Reference Rate, to the operation of a Spread that is subtracted from the Reference Rate or to any other circumstances), the interest to be paid by the Borrower for the Interest Period shall be deemed to be zero.
“Forecasted Expenditure” means the eligible costs planned to be incurred under the Project over the period of one (1) year from the date of the latest Progress Report.
“Incurred Expenditure” means the eligible costs incurred under the Project.
"Initial Loan" has the meaning specified in the Preamble. “Interest Determination Date” means, for the purposes of determination of a Floating Interest Rate, the day falling two (2) Business Days prior to the first day of the Interest Period, unless otherwise specified in the relevant Disbursement Notice.
“Interest Payment Dates” means the dates for the payment of interest corresponding to the relevant Interest Period specified in the applicable Disbursement Notice.
“Interest Period” means the period commencing on an Interest Payment Date and ending on the day immediately prior to the following Interest Payment Date, provided that the first Interest Period applicable to each Tranche shall commence on the Disbursement Date and end on the day immediately prior to the next Interest Payment Date.
“Loan” means the loan granted to the Borrower by the CEB by means of the Agreement.
“Loan Amount” means the amount specified under Sub-
“Market Disruption Event” has the meaning specified under Sub-
“Material Adverse Change” means any event which, in CEB’s opinion, (i) materially impairs the Borrower’s ability to perform its financial obligations under the Agreement; (ii) adversely affects any Security provided by the Borrower or a third- party to secure the due performance of the Borrower’s financial obligations under the Agreement; or (iii) adversely affects any rights or remedies of the CEB under the Agreement.
“Maturity Date” means the last Principal Repayment Date for each Tranche specified in the applicable Disbursement Notice.
“Modified Following Business Day Convention” means a convention whereby if a specified date would fall on a day which is not a Business Day, such date would be the first following day that is a Business Day unless that day falls in the next calendar month, in which case that date would be the first preceding day that is a Business Day.
“Prepayment Confirmation” has the meaning specified under Sub-
“Prepayment Costs” has the meaning specified under Sub-
“Prepayment Date” has the meaning specified under Sub-
“Prepayment Notice” has the meaning specified under Sub-
“Principal Repayment Date(s)” means the date(s) for the repayment(s) of principal under each Tranche specified in the applicable Disbursement Notice.
“Principal Repayment Period” means with respect of each Tranche the period running from its Disbursement Date to its Maturity Date.
“Progress Report” has the meaning specified under Sub-.
“Prohibited Practices” has the meaning specified under Sub- “Project” means the eligible investment scheme(s) set forth under Appendix 1 to be partially financed with the Loan approved by the CEB’s Administrative Council with ref. LD 2009 ADD 1 (2025).
“Project Implementing Entity” (hereinafter, the “PIE”) means the legal entity that, by delegation of the Borrower, is in charge of the implementation of the Project.
“Project Implementing Unit” (hereinafter, the “PIU”) means the team appointed by the PIE in charge of the day-to-day management of the Project.
“Reference Rate” means EURIBOR for a Floating Interest Rate Tranche denominated in Euro.
“Sanction Lists” means (i) any economic, financial and trade restrictive measures and arms embargoes issued by the EU pursuant to chapter 2 of title V of the Treaty on European Union as well as article 215 of the Treaty on the Functioning of the European Union, as amended and supplemented from time to time; or (ii) any economic, financial and trade restrictive measures and arms embargoes issued by the United Nations Security Council pursuant to article 41 of the UN Charter, as amended and supplemented from time to time.
“Sanctioned Persons” means any individual or entity listed in and/or otherwise subject to one or more Sanction Lists.
“Security” means any agreement or arrangement creating a preferential rank, a preferential right of payment, a collateral or guarantee of any nature whatsoever which might confer enhanced rights upon third parties.
“Spread” means, in connection with Floating Interest Rate Tranches, the fixed- spread to the Reference Rate (being either plus or minus) specified in basis points in the applicable Disbursement Notice.
“Tranche” means an amount disbursed or to be disbursed under the Loan.
Clause1.2

Construction

Unless the context otherwise requires, references to:
i)
this Agreement shall be construed as references to this Agreement as supplemented, amended or restated from time to time;
ii)
a Party or any other person includes its successors in title or permitted transferee;
iii)
“Clauses”, “Sub-clauses” and “Recitals” shall be construed as references to clauses, sub-clauses and recitals respectively of this Agreement; and
iv)
words importing the singular shall include the plural and vice-versa.
Clause1.3

Headings

Headings in this Agreement have no legal significance and do not affect its interpretation.
Clause1.4

Rounding

For the purposes of any calculations referred to in this Agreement:
i)
all percentages resulting from such calculations other than those determined through the use of interpolation will be rounded, if necessary, to the nearest one hundred-thousandth of a percentage point (e.g., 9.876541% (or .09876541) being rounded down to 9.87654% (or .0987654) and 9.876545% (or .09876545) being rounded up to 9.87655% (or .0987655));
ii)
all percentages determined through the use of linear interpolation by reference to two (2) relevant Reference Rates will be rounded, if necessary, in accordance with the method set forth in subsection (i) above, but to the same degree of accuracy as the two (2) rates used to make the determination (except that such percentages will not be rounded to a lower degree of accuracy than the nearest one thousandth of a percentage point (0.001%)); and
iii)
all currency amounts used in or resulting from the above calculations will be rounded, unless otherwise specified in the relevant Currency definition, to the nearest two decimal places in the relevant currency (with .005 being rounded upwards (e.g., .674 being rounded down to .67 and .675 being rounded up to .68).
UvodUvod
The Loan is granted under the general conditions of the Loan Regulations and under the special conditions of the Agreement.
UvodUvod
The CEB grants the Loan to the Borrower, who accepts it, solely for the purpose of financing the Project as described under Appendix 1.
The proceeds of the Loan cannot be used for the financing of taxes, customs and other duties.
Any change to the way the Loan is applied that has not received the CEB’s prior written approval would constitute an event in the terms of Article 3.3 (h) of the Loan Regulations and may give rise to the early reimbursement, suspension or cancellation of the Loan under the terms of Articles 3.3 (Early reimbursement of disbursed loans), 3.5 (Suspension by the Bank of undisbursed loans) and 3.6 (Cancellation by the Bank of undisbursed loans) of the Loan Regulations.
4.Čl. 4.1–4.11

FINANCIAL CONDITIONS

Clause4.1

Loan Amount

The Loan Amount is:
FIFTY MILLION EUROS EUR 50 000 000
Clause4.2

Disbursement Amount

The Loan shall be disbursed in a minimum of two (2) Tranches. The amount of each Tranche shall be determined according to the Incurred Expenditure and/or Forecasted Expenditure. The amount of the first Tranche shall not exceed twenty-five per cent (25%) of the Loan Amount.
Clause4.3

Disbursement Procedure

The disbursement of each Tranche is determined through the following procedure:
a)
Disbursement Request
Prior to each disbursement, the Borrower shall submit to the CEB a disbursement request substantially in the form set out under Appendix 3 hereto (hereinafter, a
“Disbursement Request”).
A Disbursement Request shall specify the proposed:
i)
Currency(ies) and amount(s) for the Tranche;
ii)
Disbursement Date; such Disbursement Date shall be a Business Day falling at least five (5) Business Days after the date of the Disbursement Request;
iii)
Principal Repayment Date(s), including the Maturity Date, taking into account that the Principal Repayment Period for each Tranche shall not exceed twenty (20) years including a grace period of maximum five (5) years;
iv)
maximum Fixed Interest Rate or maximum Spread to the Reference Rate;
v)
Interest Period and Interest Payment Dates;
vi)
Day Count Convention and Business Days; and
vii)
Borrower’s account for payments.
Each Disbursement Request delivered to the CEB shall be irrevocable, unless otherwise agreed in writing by the CEB.
b)
Disbursement Notice
If the CEB receives a Disbursement Request that complies with the Disbursement Request requirements set out in Sub- above, and if all other relevant Disbursement Conditions as defined in Sub- (Disbursement Conditions) below have been fulfilled by the Borrower, the CEB shall deliver to the Borrower a disbursement notice substantially in the form set out under Appendix 3 hereto (hereinafter, a “Disbursement Notice”). Each Disbursement Notice shall be delivered at least two (2) Business Days before the proposed Disbursement Date.
A Disbursement Notice shall specify:
i)
the Currency(ies) and the amount(s) for the Tranche;
ii)
the Disbursement Date;
iii)
the Principal Repayment Period and Principal Repayment Date(s), including the Maturity Date;
iv)
the Fixed Interest Rate or the Spread to the Reference Rate;
v)
the Interest Period and the Interest Payment Dates;
vi)
the Day Count Convention and the Business Days; and
vii)
the Borrower’s and the CEB’s accounts for payments.
A Disbursement Notice matching the elements included in a Disbursement Request shall constitute an irrevocable and unconditional commitment on the part of the Borrower to borrow from the CEB and on the part of the CEB to disburse to the Borrower the Tranche under the terms and conditions specified in the Disbursement Notice.
Notwithstanding the above, if the CEB has not delivered a Disbursement Notice within twenty (20) Business Days following the receipt of a Disbursement Request, the relevant Disbursement Request shall be deemed as cancelled.
Clause4.4

Disbursement Period

Unless otherwise agreed in writing by the CEB, the Borrower shall not be entitled to:
i)
the issue of a Disbursement Request for the first Tranche beyond twelve
(12)
months after the execution of the Agreement by the Parties;
ii)
the issue of any further Disbursement Request beyond eighteen (18) months after the last disbursement; or
iii)
the issue of any further Disbursement Request beyond the day falling fifteen (15) Business Days before the Closing Date.
Clause4.5

Disbursement Conditions

a)
Conditions precedent to the Disbursement Request for the first Tranche:
(i)
Legal opinion in English issued by the Ministry of Justice of the Borrower confirming to the CEB’s satisfaction, substantially in the form set out under Appendix 2 hereto, that the Agreement has been duly executed by authorised representatives of the Borrower and that the Agreement is valid, binding and enforceable in accordance with its terms in the Borrower’s jurisdiction.
(ii)
Evidence in English (e.g., statute, governmental authorisation, power of attorney, etc.) to the CEB’s satisfaction of the person(s) authorised to execute the Agreement and the Disbursement Requests on behalf of the Borrower, together with the authenticated specimen of the signature(s) of such person(s).
(iii)
A Certificate from the Borrower in the form of Appendix 4 hereto, signed by the person(s) authorised to execute the Disbursement Requests on behalf of the Borrower and dated not earlier than a date falling five (5) Business Days before the Disbursement Request.
b)
Conditions precedent to any further Disbursement Request:
(i)
Evidence in English (e.g., Statute, governmental authorisation, Power of Attorney, etc.) to the CEB’s satisfaction of the person(s) authorised to execute the Disbursement Requests on behalf of the Borrower, together with the authenticated specimen of the signature(s) of such person(s).
(ii)
Progress Report confirming to the CEB’s satisfaction the Allocation of at least ninety percent (90%) of the previous Tranche.
(iii)
A Certificate from the Borrower in the form of Appendix 4, signed by the person(s) authorised to execute the Disbursement Requests on behalf of the Borrower and dated not earlier than a date falling five (5) Business Days before the Disbursement Request.
(iv)
Any other specific condition set forth under section “Specific Conditions” of Appendix 1.
Clause4.6

Repayment

On any Principal Repayment Date, the Borrower shall repay the principal of each Tranche due on that Principal Repayment Date in accordance with the terms set forth in the applicable Disbursement Notice.
Clause4.7

Prepayment

a)
Mechanics
If in any event specified in this Agreement referring to this Sub-clause the Borrower ought to prepay all or part of a Tranche or in the event of voluntary prepayment, the Borrower shall give at least a two (2) months prior written notice to the CEB (hereinafter, the “Prepayment Notice”) specifying the amounts to be prepaid, the date on which the prepayment will take place (hereinafter, the “Prepayment Date”) and, upon prior consultation with the CEB, the Prepayment Costs. The Prepayment Date shall fall on an Interest Payment Date, unless otherwise agreed in writing by the CEB.
Upon receipt of the Prepayment Notice, the CEB shall send a written notice to the Borrower (hereinafter, the “Prepayment Confirmation”), not later than five (5) Business Days prior to the Prepayment Date, indicating the accrued interest due thereon and the Prepayment Costs in accordance with Sub-.
A Prepayment Confirmation matching all the elements included in the Prepayment Notice shall constitute an irrevocable and unconditional commitment on the part of the Borrower to prepay the relevant amounts to the CEB under the terms and conditions specified in the Prepayment Confirmation.
If the Borrower partially prepays a Tranche, the prepaid amount shall be applied pro rata to each outstanding principal repayment. In such an event, the Prepayment Confirmation shall accordingly include an adjusted repayment schedule which shall be binding on the Borrower.
b)
Prepayment Costs
The costs resulting from prepayment in accordance with Sub- (hereinafter, the “Prepayment Costs”) shall be determined by the CEB on the basis of the costs to it of redeploying the amount to be prepaid from the Prepayment Date to the Maturity Date, including any related costs, such as unwinding any underlying hedging arrangements. The costs of redeployment will be established on the basis of the difference between the original rate and the redeployment rate, which shall be determined by the CEB on the basis of market conditions on the date of the Prepayment Notice.
Clause4.8

Interest Determination

The Borrower shall pay interest on the principal of each Tranche from time to time outstanding during each Interest Period at the Fixed Interest Rate/Floating Interest Rate specified in the applicable Disbursement Notice.
Interest shall (i) accrue from and including the first day of the Interest Period to but excluding the last day of such Interest Period; and (ii) be due and payable on the Interest Payment Dates specified in the applicable Disbursement Notice. Interest shall be calculated on the basis of the Day Count Convention specified in the relevant Disbursement Notice.
In the case of Floating Interest Rate Tranches, the CEB shall determine on each Interest Determination Date the interest rate applicable during the relevant Interest Period in accordance with the Agreement and promptly give notice thereof to the Borrower. Each determination by the CEB shall be final, conclusive and binding upon the Borrower unless shown by the Borrower to the satisfaction of the CEB that any such determination has involved manifest error.
Clause4.9

Default Interest Rate

In the event that the Borrower fails to pay, in full or in part, any amount under the Agreement, and notwithstanding any other recourse available to the CEB under the Agreement or otherwise, the Borrower shall pay interest on such unpaid amounts from the due date until the date of receipt of such payment by the CEB at the interest rate per annum equal to the one-month EURIBOR quoted on the due date plus two hundred basis points (200 bps) (hereinafter, the “Default Interest Rate”).
The applicable Default Interest Rate shall be updated every thirty (30) calendar days.
Clause4.10

Market Disruption Event

The CEB shall promptly, upon becoming aware of it, notify to the Borrower that a Market Disruption Event has occurred.
For the purposes of the Agreement, “Market Disruption Event” refers to the following circumstances:
a)
The relevant financial news provider referred to under the EURIBOR definition does not quote any percentage rate or its corresponding screen rate page is not accessible.
Under such a Market Disruption Event, the applicable EURIBOR shall be the percentage rate per annum determined by the CEB to be the arithmetic mean of the rates at which loans in Euro, in an amount identical or nearest comparable to the Loan amount in question and for a period identical or nearest comparable to the relative Interest Period, are offered on the Interest Determination Date by three (3) leading banks in the EU interbank market selected by the CEB. If at least two (2) quotations are provided, the applicable EURIBOR for that Interest Determination Date shall be the arithmetic mean of all quotations provided.
If only one (1) or no quotation is provided, the applicable EURIBOR shall be the percentage rate per annum determined by the CEB to be the arithmetic mean of the rates at which loans in Euro, in an amount identical or nearest comparable to the Loan amount in question and for a period identical or nearest comparable to the relative Interest Period, are offered on the second Business Day after the beginning of the relevant Interest Period by major banks in the EU interbank market selected by the CEB.
b)
The CEB determines that it is not possible to determine the applicable Reference Rate in accordance with paragraph (a) above.
Under such a Market Disruption Event, the applicable Floating Interest Rate shall be replaced by the rate that expresses as a percentage rate per annum the cost to the CEB of funding the Loan from whatever source the CEB may reasonably select.
c)
At any time between the delivery of a Disbursement Notice and the Disbursement Date the CEB reasonably determines that there are exceptional and unexpected circumstances of an economic, financial, political or other external nature adversely affecting the CEB’s access to its sources of funding.
Under such a Market Disruption Event, the CEB shall be entitled to cancel at no cost the scheduled disbursement.
In the case of the Market Disruption Events set forth under paragraphs (a) and (b) above:
i)
If the Borrower so requires, the Parties, acting in good faith, shall enter into negotiations for a period of not more than thirty (30) calendar days in order to agree on an alternative to the applicable EURIBOR. If no agreement is reached, the Borrower shall proceed with prepayment on the next Interest Payment Date in the terms provided under Sub-
ii)
The CEB shall have the right, acting in good faith and in consultation with the Borrower to the extent reasonably practicable, to change the duration of any subsequent Interest Period to thirty (30) calendar days or less by sending to the Borrower a notice thereof. Any such change to an Interest Period shall take effect on the date specified by the CEB in such notice.
iii)
For the avoidance of doubt, items (i) and (ii) above shall only apply in circumstances where the Borrower shall pay interest on the principal of a Tranche outstanding at a Floating Interest Rate.
If the CEB determines that the relevant Market Disruption Event no longer exists, then, subject to any further Market Disruption Event occurring or existing, the Floating Interest Rate and/or Interest Period applicable to any relevant Tranche shall revert, from the first day of the following Interest Period to being calculated in accordance with the Floating Interest Rate and Interest Period specified in the relevant Disbursement Notice.
Clause4.11

Payments

All the amounts due by the Borrower under this Agreement are payable in the Currency of each Tranche to the CEB’s account indicated in the applicable Disbursement Notice. Any payment under this Agreement shall be made on a Business Day subject to the Modified Following Business Day Convention. Any payment shall be deemed paid when the CEB has received the amount on its account. The Borrower or the bank instructed by the Borrower, as the case may be, shall send a written payment notice to the CEB at least five (5) Business Days before payment of any amounts due under this Agreement.
All payments to be made by the Borrower under this Agreement shall be calculated and be made without (and free and clear of any deduction for) set-off or counterclaim.
If the CEB receives a payment that is insufficient to discharge all the amounts then due and payable by the Borrower under this Agreement, the CEB shall apply that payment in or towards payment of:
i)
first, any fees, costs, charges or expenses due but unpaid under this Agreement;
ii)
secondly, any accrued interest due but unpaid under this Agreement,
iii)
thirdly, any principal due but unpaid under this Agreement; and
iv)
fourthly, any other sum due but unpaid under this Agreement.
5.Čl. 5.1–5.9

PROJECT IMPLEMENTATION

UvodUvod
The Borrower shall implement the Project in accordance with the Agreement.
The Borrower designates Ministry for Public Investment as the PIE. The Borrower shall ensure that the PIE appoints a PIU appropriately staffed and equipped throughout the Project implementation period.
In any event, the Borrower remains solely liable to comply with its obligations under the Agreement.
Failure to comply with the undertakings set forth under this would constitute, irrespective of any other applicable provision of the Loan Regulations, an event in the terms of Article 3.3 (h) of the Loan Regulations and may give rise to (i) the relevant contract expenditure declared ineligible for Allocation under the Project; and/or (ii) the early reimbursement, suspension or cancellation of the Loan, in whole or in part, under the terms of Articles 3.3 (Early reimbursement of disbursed loans), 3.5 (Suspension by the Bank of undisbursed loans) and 3.6 (Cancellation by the Bank of undisbursed loans) of the Loan Regulations.
Clause5.1

Duty of Care

The Borrower shall apply all care and diligence, and shall exercise all typically used means (including, but not limited to, legal, financial, managerial and technical) required for the proper implementation of the Project.
Clause5.2

Allocation Period

The Borrower shall allocate each Tranche to the Project within twelve (12) months after the relevant Disbursement Date (hereinafter, the “Allocation Period”), unless otherwise agreed in writing between the Borrower and the CEB. If a Tranche disbursed by the CEB is not allocated to the Project or is only partially allocated to it within the Allocation Period, the Borrower shall proceed with prepayment of the unallocated amounts on the next Interest Payment Date in the terms provided under Sub- unless otherwise agreed between the Borrower and the CEB.
Clause5.3

Project Costs

The Tranches disbursed under the Initial Loan and the Loan shall not exceed fifty-five per cent (55%) of the total eligible costs of the Project specified under Appendix 1 hereto. If the Tranches disbursed under the Initial Loan and the Loan exceed the above 55% (by reduction of the total eligible costs or otherwise), the Borrower shall proceed with prepayment of the surplus on the next Interest Payment Date in the terms provided under Sub-
Should the total eligible costs of the Project increase or be revised for whatever reason, the Borrower shall ensure that the additional financial resources for the completion of the Project are available without recourse to the CEB. The plans to finance the increased costs shall be communicated to the CEB without delay.
Clause5.4

Project Specific Undertakings

The Borrower shall ensure that:
i)
all the land, real property rights and permits required for the implementation of the Project are timely available;
ii)
all assets and plants under the Project are permanently insured, maintained and operated in accordance with international best practices; and
iii)
any other requirement specified in Appendix 1 (“Specific Conditions”) hereto is complied with.
Clause5.5

Procurement

Procurement of supplies, works and services to be financed under the Project shall comply with the Procurement Guidelines.
Clause5.6

Environmental and Social Safeguards

The Borrower, through the PIE, shall implement the Project in conformity with the requirements set forth in the Environmental and Social Safeguards Policy.
Clause5.7

Human Rights

The Borrower, through the PIE, shall ensure that the implementation of the Project does not give rise to a violation of (i) the European Convention on Human Rights; or
ii)
the European Social Charter.
Clause5.8

Integrity

The Borrower undertakes that:
a)
it will institute and thereafter comply with internal policies, procedures and controls, in line with applicable legislation and international best practices, for the purpose of preventing the Borrower to become, in connection with the implementation of the Project or otherwise, an instrument for money laundering or terrorism financing;
b)
it will not make any Loan proceeds available to or for the benefit of, directly or indirectly, any Sanctioned Person;
c)
it will not commit, and no person, with its consent or prior knowledge, will commit, in connection with the implementation of the Project or any Sub- project a Corrupt Practice, a Fraudulent Practice, a Coercive Practice, a Collusive Practice or an Obstructive Practice (hereinafter, together with money laundering, terrorism financing and making available any Loan proceeds to Sanctioned Persons referred to as the “Prohibited Practices”).
For the purposes of this Agreement:
i)
A “Corrupt Practice” means any act of offering, giving, receiving, or soliciting, directly or indirectly, anything of value to influence improperly the actions of another party.
ii)
A “Fraudulent Practice” means any act or omission, including a misrepresentation, that knowingly or recklessly misleads, or attempts to mislead, a party to obtain a financial or other benefit, or to avoid an obligation.
iii)
A “Coercive Practice” means any act of impairing or harming, or threatening to impair or harm, directly or indirectly, any party or the property of any party to influence improperly the actions of a party.
iv)
A “Collusive Practice” means any arrangement between two or more parties designed to achieve an improper purpose, including influencing improperly the actions of another party.
v)
An “Obstructive Practice” means, in relation to an investigation into a Coercive, Collusive, Corrupt or Fraudulent Practice, (a) any act of deliberately destroying, falsifying, altering or concealing of evidence material to the investigation; (b) any act of threatening, harassing or intimidating any party to prevent it from disclosing its knowledge of matters relevant to the investigation or from pursuing the investigation; and/or (c) any act intending to materially impede the exercise of the contractual rights of audit or access to information.
The Borrower undertakes to inform CEB if it should become aware of any fact or information suggestive of the commission of any such Prohibited Practice. For this purpose, the knowledge of any member of the PIU shall be deemed the knowledge of the Borrower.
The Borrower undertakes:
i)
to take timely such action as the CEB may reasonably request to investigate and/or terminate any alleged or actual Prohibited Practice;
ii)
to facilitate any investigation that the CEB may conduct concerning any alleged or actual Prohibited Practice; and
iii)
to inform the CEB of the measures taken to seek damages from the persons responsible for any loss resulting from any such Prohibited Practice.
The Head of the PIE shall be responsible for contacts with the CEB for the purposes of this Sub-clause.
Clause5.9

Visibility

The Borrower shall inform the Final Beneficiaries that the Project is partly financed by the CEB through appropriate means of communication such as dedicated notices in relevant websites, social media, press releases, brochures or the exhibit of billboards/plates on relevant Project sites/facilities. In any case, information to the Final Beneficiaries shall display in an appropriate way the CEB’s name and logo.
6.Čl. 6.1–6.6

MONITORING

Clause6.1

Reporting

a)
Progress Reports
The Borrower through the PIE, shall send to the CEB a progress report (hereinafter, a “Progress Report”) (i) once a year, until the completion of the Project; and
ii)
prior to every Disbursement Request, except for the Disbursement Request for the first Tranche.
Appendix 5 hereto provides a template specifying the minimum information required by the CEB. Alternative formats containing the same information may also be used.
b)
Completion Report
Upon completion of the Project, the Borrower, through the PIE, shall submit a completion report (hereinafter, a “Completion Report”) including an appraisal of the Project’s social impact.
Appendix 5 hereto provides a template specifying the minimum information required by the CEB. Alternative formats containing the same information may also be used.
The Parties hereby expressly agree that no final report has to be submitted by the Borrower under, and in accordance with, Sub- (Project completion report) of the Original Agreement.
Clause6.2

Visits

The Borrower undertakes to favourably receive any monitoring/technical/evaluation visits, including by facilitating access to relevant Project sites/contractors, carried out by the CEB’s staff members or designated third parties.
Clause6.3

Audit

Should the Borrower fail to comply with any of its undertakings under the Agreement, the Borrower undertakes to favourably receive any on-site audit, carried out by the CEB’s staff members or designated third parties, which shall be at the Borrower’s expense.
Clause6.4

Project Information

The Borrower shall keep accounting records concerning the Project, which shall be in conformity with international standards, showing, at any point in time, the Project’s state of progress, and which shall record all operations made and identify the assets and services partially financed with the Loan. The Borrower through the PIE shall deliver to the CEB in a timely manner any information or document concerning the financing or the implementation (including in particular environmental/social and procurement issues) of the Project as the CEB may reasonably require.
The Borrower, through the PIE, shall inform the CEB immediately of any event affecting the implementation of the Project, including but not limited to:
i)
any action or protest initiated or any objection raised by any third party or any complaint received by the Borrower or any litigation that is commenced or threatened against it with regard to procurement or environmental, social, occupational health and safety (e.g. loss of life, major accident) matters or other matters in connection with the Project; or
ii)
any enactment of or any amendment to any law, rule or regulation (or in the application or official interpretation of any law, rule or regulation) in connection with the Project.
Any event that may have a material adverse impact on the implementation of the Project would constitute an event in the terms of Article 3.3 (h) of the Loan Regulations and may give rise to the early reimbursement, suspension or cancellation of the Loan under the terms of Articles 3.3 (Early reimbursement of disbursed loans), 3.5 (Suspension by the Bank of undisbursed loans) and 3.6 (Cancellation by the Bank of undisbursed loans) of the Loan Regulations.
Clause6.5

Borrower Information

The Borrower, directly or through the PIE, shall inform the CEB of any Material Adverse Change immediately after becoming aware thereof. Any Material Adverse Change would constitute an event in the terms of Article 3.3 (h) of the Loan Regulations and may give rise to the early reimbursement, suspension or cancellation of the Loan under the terms of Articles 3.3 (Early reimbursement of disbursed loans), 3.5 (Suspension by the Bank of undisbursed loans) and 3.6 (Cancellation by the Bank of undisbursed loans) of the Loan Regulations.
Clause6.6

Financial Covenants

a)
Cross-Default
The Borrower shall inform the CEB if any Cross-Default Event occurs. Any Cross- Default Event would constitute an event in the terms of Article 3.3 (h) of the Loan Regulations and may give rise to the suspension, cancellation or early reimbursement of the Loan under the terms of Articles 3.3 (Early reimbursement of disbursed loans), 3.5 (Suspension by the Bank of undisbursed loans) and 3.6 (Cancellation by the Bank of undisbursed loans) of the Loan Regulations.
For the purpose of this Agreement, “Cross-Default Event” means a situation in which, following any default in relation thereto, the Borrower is required or is capable of being required or will, following expiry of any applicable contractual grace period, be required or be capable of being required to prepay, repay or terminate ahead of maturity any Debt Instrument or any commitment in connection with any Debt Instrument is cancelled or suspended.
7.Čl. 7.1–7.4

PARI PASSU

UvodUvod
Failure to comply with the provisions set forth below under would constitute an event in the terms of Article 3.3 (h) of the Loan Regulations and may give rise to the early reimbursement, suspension or cancellation of the Loan under the terms of Articles 3.3 (Early reimbursement of disbursed loans), 3.5 (Suspension by the Bank of undisbursed loans) and 3.6 (Cancellation by the Bank of undisbursed loans) of the Loan Regulations.
Clause7.1

Ranking

The Borrower shall ensure that its payment obligations under this Agreement rank, and will rank, not less than pari passu in right of payment with all other present and future unsecured and unsubordinated obligations under any of its Debt Instruments.
In particular, the Borrower shall not make (or authorise) any payment in respect of any other such Debt Instrument (whether regularly scheduled or otherwise) if:
i)
the CEB makes a demand of early reimbursement under Article 3.3 of the Loan Regulations; or
ii)
an event or potential event of default under any unsecured and unsubordinated Debt Instrument of the Borrower or any of its agencies or instrumentalities has occurred and is continuing.
However, payment in respect of such Debt Instrument is possible if the Borrower:
i)
simultaneously pays; or
ii)
sets aside in a designated account for payment on the next Interest Payment Date
a sum equal to the same proportion of the principal outstanding under this Agreement as the proportion that the payment under such Debt Instrument bears to the total debt outstanding under that instrument.
For this purpose, any payment of a Debt Instrument that is made out of the proceeds of the issue of another instrument, to which substantially the same persons as hold claims under the Debt Instrument have subscribed, shall be disregarded.
Clause7.2

Security

Should a Security be granted for the performance of any of the Borrower’s Debt Instruments, the Borrower shall timely inform the CEB of its intentions and shall, if so required by the CEB, provide to the CEB, within the deadline set forth in the CEB’s notice, identical or equivalent Security for the performance of its financial obligations under this Agreement.
This provision shall not apply to a Security:
a)
created on property at the time of purchase solely as security for the payment of the purchase price or for the payment of debt incurred for the purpose of financing the purchase of such property; or
b)
securing a Debt Instrument maturing not more than one (1) year after the date on which it was originally incurred.
Clause7.3

Clause by Inclusion

Should any of the Borrower’s Debt Instruments include a loss-of-rating covenant, a financial ratios covenant or pari passu provisions that are not included in the Agreement or that are stricter than any equivalent provision of this Agreement, the Borrower shall so inform the CEB and shall, at the request of the CEB by means of a written notice, execute within the deadline indicated in the CEB’s notice, an amendment to this Agreement to provide an equivalent provision in favour of the CEB.
Clause7.4

Prepayment to Third Parties

Should the Borrower voluntarily prepay (for the avoidance of doubt, prepayment shall include a repurchase where applicable) in whole or in part any Debt Instrument and such prepayment:
i)
is not made within a revolving credit facility which remains open for drawing on the same terms after such prepayment; or
ii)
is not made out of the proceeds of another Debt Instrument having a term at least equal to the unexpired term of the prepaid Debt Instrument,
the Borrower shall inform the CEB. .In such an event, and upon the CEB’s request, the Borrower shall prepay to the CEB within two (2) months from any such prepayment the amounts disbursed under the Loan in accordance with Sub- in such proportion as the prepaid amount bears to the corresponding Debt Instrument.
UvodUvod
The Borrower represents and warrants that:
(a)
it carries out its business according to the laws, decrees, regulations, articles of association and other texts applicable to it; in particular, it complies with the applicable laws on fraud, corruption, money laundering and financing of terrorism;
(b)
it is not and none of its officers, directors, agent or employees is a Sanctioned Person or is the subject of a final and irrevocable court ruling in connection with Prohibited Practices perpetrated in the exercise of its professional duties and none of them did or does enter into business relationships with Sanctioned Persons;
(c)
its competent bodies have authorised it to enter into the Agreement and have given the signatory(ies) the authorisation therefor, in accordance with the laws, decrees, regulations and other texts applicable to it;
(d)
the execution and delivery of, the performance of its obligations under and compliance with the provisions of this Agreement do not:
(i)
contravene or conflict with any applicable law, statute, rule or regulation, or any judgment, decree or permit to which it is subject;
(ii) contravene or conflict with any Debt Instrument or any other agreement binding upon it which might reasonably be expected to give rise to a Material Adverse Change;
(e)
no event or circumstance is outstanding that constitutes a default under any Debt Instrument or any other agreement, which is binding on it or to which its assets are subject, which might reasonably be expected to give rise to a Material Adverse Change;
(f)
no Security has been granted to a third party in breach of Sub-;
(g)
no litigation, arbitration or administrative proceedings of or before any court, arbitral tribunal or agency which might reasonably be expected to give rise to a Material Adverse Change have (to the best of its knowledge and belief) been started or threatened against it; and
(h)
it has received a copy of the Loan Regulations, the Loan Policy, the Environmental and Social Safeguards Policy, the Procurement Guidelines and the Data Protection Regulation and has taken note thereof.
The above representations and warranties are deemed repeated on the date of signature of each Disbursement Request and on the date of each Certificate. Any change in relation to the above representations and warranties must, for the entire Loan period, be notified and any supporting documents provided to the CEB immediately after the Borrower having become aware of the change.
If any of the above representations and warranties is or proves to have been incorrect or misleading in any respect, this would constitute an event in the terms of Article 3.3 (h) of the Loan Regulations and may give rise to the suspension, cancellation or early reimbursement of the Loan under the terms of Articles 3.3 (Early reimbursement of disbursed loans), 3.5 (Suspension by the Bank of undisbursed loans) and 3.6 (Cancellation by the Bank of undisbursed loans) of the Loan Regulations.
UvodUvod
The Borrower may not raise any fact relating, within the scope of the use of the Loan, to its relations with third parties in order to avoid fulfilling, either totally or partially, the obligations resulting from the Agreement.
The CEB may not be involved in disputes which might arise between the Borrower and third parties and the costs, whatever their nature, incurred by the CEB due to any claims, and in particular all legal or court costs, shall be at the expense of the Borrower.
UvodUvod
In no case, including delay or partial exercise, shall it be presumed that the CEB has tacitly waived any right granted to it by the Agreement.
UvodUvod
The Borrower may not transfer any of its rights and/or obligations under the Agreement without the prior written consent of the CEB.
The Borrower hereby gives its consent to any transfer by the CEB of all or part of its rights and/or obligations under the Agreement.
UvodUvod
If it is or becomes unlawful in any jurisdiction for the CEB to make, maintain or fund the Loan or perform any of its obligations under this Agreement, this would constitute an event in the terms of Article 3.3 (h) of the Loan Regulations and may give rise to the suspension, cancellation or early reimbursement of the Loan under the terms of Articles 3.3 (Early reimbursement of disbursed loans), 3.5 (Suspension by the Bank of undisbursed loans) and 3.6 (Cancellation by the Bank of undisbursed loans) of the Loan Regulations.
UvodUvod
Each Party hereby acknowledges that any applicable provision pursuant to which a Party may request the other Party to renegotiate the Agreement or may cease to perform its obligations hereunder, in case of a change of circumstances unforeseeable at the time of the conclusion of the Agreement which makes performance excessively onerous for a Party who had not agreed to assume such risk, shall not apply to it with respect to its obligations under the Agreement and that it shall not be entitled to any claim under such provision. For the avoidance of doubt, this clause does not exclude any other applicable legal or contractual rights under the Agreement for a Party to cease to perform its obligations hereunder with respect to the implementation of the Project or to terminate the Agreement.
UvodUvod
The Agreement shall be governed by the rules of the CEB as specified in the provisions of , paragraph 3, of the Third Protocol (dated 6 March 1959) to the General Agreement on Privileges and Immunities of the Council of Europe (dated 2 September 1949) and, secondarily, if necessary, by French law.
UvodUvod
Disputes between the Parties to the Agreement shall be subject to arbitration under the conditions laid down in chapter 4 of the Loan Regulations.
The Parties agree not to take advantage of any privilege, immunity or legislation before any jurisdictional or other authority, whether domestic or international, in order to object to the enforcement of an award handed down under the conditions laid down in chapter 4 of the Loan Regulations.
In any legal action arising from this Agreement, the CEB’s certificate as to any amount due or interest rate applicable under the Agreement shall, in the absence of manifest error, be prima facie evidence of such amount or interest rate.
UvodUvod
The processing of any personal data collected under the Agreement shall be carried out by the CEB in accordance with the Data Protection Regulation.
UvodUvod
Any notice (including any document or communication) to be given or made under or in connection with this Agreement to the CEB or the Borrower shall be in writing and unless otherwise stated, may be made by registered letter or electronic mail. Such notice shall be deemed to have been received by the other Party:
(i)
in the case of a hand-delivered or registered letter, on the date of delivery;
(ii) in the case of electronic mail, only when actually received in readable form and only if it is addressed in such a manner as the other Party shall specify for this purpose; and
(iii) in the case of electronic mail, which contains a Disbursement Notice, sent by the CEB to the Borrower, when the electronic mail is sent.
Any notice provided by the Borrower to the CEB by electronic mail shall:
(i)
mention the LD reference in the subject line; and
(ii) be in the form of a non-editable electronic image (pdf, tif or any other common non editable file format agreed between the Parties) of the notice signed by the person or persons duly authorised to sign such notice on behalf of the Borrower, attached to the electronic mail.
Without affecting the validity of notices by electronic mail made in accordance with this Clause, the following notices shall also be sent by registered letter to the other Party at the latest on the immediately following Business Day:
(i)
Disbursement Requests;
(ii) any communications in respect of the suspension, cancellation and/or early reimbursement of the Loan or in respect of a Prepayment Notice; and
(iii) any other communication required by the CEB.
The Parties agree that any above notice (including via electronic mail) is an accepted form of communication, shall constitute admissible evidence in court and shall have the same evidential value as an agreement under hand.
The postal address and electronic mail address (and the department or officer, if any, for whose attention the communication is to be made) of each Party for any communication to be given or made under or in connection with this Agreement is:
For the Borrower:
Ministry of Finance of the Republic of Serbia 20, Kneza Miloša Street 11000 Belgrade Serbia Attention: Minister of Finance E-mail: kabinet@mfin.gov.rs / uprava@javnidug.gov.rs For the CEB:
Council of Europe Development Bank 55 Avenue Kléber 75116 Paris France
Attention: Head of Projects Division E-mail: projects@coebank.org
The CEB and the Borrower shall promptly notify the other Party in writing of any change in their respective communication details.
All notices to be given or made under or in connection with the Agreement shall be in English or French or, if in another language, shall be accompanied by an English or French certified translation thereof, when so required by the CEB.
All notices to be given or made by the Borrower under or in connection with this Agreement shall, where required by the CEB, be delivered to the CEB together with satisfactory evidence of the authority of the person or persons authorised to sign such notice on behalf of the Borrower and the authenticated specimen signature of such person or persons.
UvodUvod
The Borrower shall pay, to the extent applicable, all taxes, duties, fees and other impositions of whatsoever nature, including stamp duty and registration fees, arising out of the execution, registration, implementation, termination or enforcement of the Agreement and/or any related document as well as of the creation, perfection, registration, enforcement or release of any Security required under the Agreement.
The Borrower shall bear all charges and expenses (including legal, professional, banking or exchange costs) incurred in connection with (i) the preparation, execution, perfection, implementation, termination and enforcement of this Agreement and/or any related document; (ii) any amendment, supplement or waiver in respect of this Agreement and/or any related document; and (iii) the preparation, execution, perfection, management, enforcement and release of any Security required under the Agreement.
Notwithstanding the above, (Cost of arbitration) of the Loan Regulations shall apply regarding the costs of the arbitration set forth under (Disputes).
UvodUvod
After repayment of all outstanding principal under the Loan as well as payment of all interests and other expenses resulting from the Agreement, including in particular those amounts under Sub- (Default Interest Rate) and (Taxes and Expenses), the Borrower shall be fully released from its obligations arising out of or in connection with this Agreement.
Without prejudice of the above, the Borrower shall nevertheless undertake, for a period not exceeding six (6) years following the receipt of a Completion Report confirming to the CEB’s satisfaction the full Allocation of all amounts disbursed under the Loan (i) to keep the Project-related documentation; and (ii) to favourably receive any evaluation visits, including by facilitating access to relevant Project sites carried out by the CEB’s staff members or designated third parties.
UvodUvod
The Agreement shall enter into force upon execution by the Parties and ratification by the Parliament of the Republic of Serbia with written confirmation to that effect received by the CEB from the Borrower.
[Remainder of page intentionally left blank]
PriloziPrilozi
IN WITNESS THEREOF the Parties have caused this Agreement to be executed in four (4) originals, each of which is equally valid. One (1) original is for the CEB and three (3) are for the Borrower.
For the Borrower
Belgrade, on October 29, 2025
______________________________
Name: Siniša Mali
Title: First Deputy Prime Minister and Minister of Finance
For the CEB
Paris, on 24 October 2025
______________________________ ______________________________
Name: Mr. Rainer LOVATO Name: Andrea BUCCOMINO
Title: L&D, Head of Projects Division Title: Deputy General Counsel
APPENDIX 1
Project Description
LD2009 ADD 1(2025)
BorrowerRepublic of Serbia
Loan TypeProject Loan
Total Loan AmountEUR 104 000 000 composed of:
Initial Loan in a total maximum amount of EUR 54
000 000
Loan in a total maximum amount of EUR 50 000 000
Approval by the
CEB’s Administrative

Council
1 October 2025
← Pomerite tabelu levo/desno za više detalja →
I.
Sector(s) of actionHealth and social care
Planned Works/Sub-
projects
Construction of a new building for the University
Children’s Hospital Tiršova (“Tiršova 2”) to:
- increase space in operating theatres and patient
rooms
- have better accommodation for patients and their
families
- have more efficient heating, ventilation and air-
conditioning including improved functionality of the
hospital
- improve accessibility, fire safety and evacuation
systems
LocationBelgrade
Final BeneficiariesMedical staff and patients
Project Total CostEUR 190 000 000
Financing Plan
Schedule of Works1 March 2020 – 31 December 2028
Closing Date31 December 2028
← Pomerite tabelu levo/desno za više detalja →
II.
Eligibility CriteriaThe CEB finances projects concerning health and
social care and related infrastructure in order to
foster healthy lives and well-being by ensuring
access to high-quality, affordable healthcare for all.
To be eligible to CEB financing, private
establishments and infrastructure must be approved
by the public health authorities and in compliance
with the criteria established for this type of
establishment.
The CEB can finance projects concerning health,
social care and related infrastructure or services
such as:
← Pomerite tabelu levo/desno za više detalja →
III.
1. Construction and/or rehabilitation of:
i. public hospitals;
ii. public medical service infrastructure;
iii. specialised centres dedicated to assisting
vulnerable and dependent populations;
iv. nursing homes for the elderly and welfare
centres, including housing for elderly people
who are still independent;
v. health-related research and development
facilities.
2. Adaptation of such premises to facilitate
access for persons with reduced mobility.
3. Training and support programmes in favour of
persons with disabilities.
4. Training of medical and sociomedical
specialised staff.
5. Within the framework of health projects,
financing can be also granted for basic
infrastructure such as water supply and
wastewater systems and facilities, solid waste
collection and treatment facilities, including
hazardous waste, as well as for electricity
and gas supply systems, IT infrastructure and
communication facilities (such as telephone,
internet, cable, etc.).
Eligible CostsThe investments cost eligible for CEB financing
include:
• The preparatory surveys or studies (technical,
economic or commercial, engineering,
environmental and social impact assessment
and management plans), the technical
supervision of the Project and other Project-
related professional services. These costs
should not exceed 5% of the total cost of the
Project, unless justified.
• The acquisition or preparation of land that the
Borrower can demonstrate is directly linked to
the Project’s implementation, at its purchase
price, unless it has been donated or granted.
• Construction/renovation/modernisation or
purchase of buildings directly linked to the
Project. Purchases of buildings shall
correspond to eligible sectors of activity
defined in the NACE nomenclature of the
European Union.
• The installation of basic infrastructure, such
as sewerage, water supply, gas supply,
← Pomerite tabelu levo/desno za više detalja →
electricity and telecommunications networks,
waste disposal and waste water treatment,
roads, etc.
• The purchase of materials, equipment and
machinery, including IT equipment and
software, as well as the related costs linked to
the training of staff.
• Technical assistance to support the
implementation of the Project.
• Contingencies for unanticipated costs
(technical and/or price increases) can be
financed by the CEB. These represent
financial coverage for unforeseen changes in
the quantity of works required, or of unit
prices, in the type and quantity of equipment
to be purchased or in the method of carrying
out the Project. These contingencies may
represent up to 10% of the total cost of the
Project. The percentage of contingencies may
be higher if justified during appraisal.
• Cost related to professional/vocational
training and public awareness-raising
campaigns may be eligible for CEB financing
taking into account their objectives within the
framework of the Project.
• The loan cannot cover staff costs (wages and
salaries and other related benefits, such as
pension payments), financial charges and
non-cash items, such as depreciation. Such
costs may however be considered eligible
when they relate to project management or
technical assistance required for project
preparation and implementation.
• Financial costs (payment and/or refinancing
of debts, interest charges, acquisition of
interest in the capital of an entreprise, etc.) or
financial investments cannot be included in
the estimated cost of the Project and cannot
be financed by the CEB.
• VAT and other tax-related costs can be
considered as eligible costs if they are non-
deductible and non-refundable for the
Borrower.
Specific ConditionsCondition prior to the last disbursement: the
Borrower shall inform the CEB that staffing
requirements for each hospital services have been
defined and the human resources strategy has been
put in place.
← Pomerite tabelu levo/desno za više detalja →
Social impactThe Project will contribute to improved conditions for
patients and medical staff as well as the quality of
services provided. Improved access to modern
equipment is expected to contribute to better
diagnosis and more effective treatment of patients,
resulting in a reduction of the number of patients
having to leave the country for treatment. Overall,
improved quality of accommodation, hygiene,
working and therapeutical conditions for the patients
and the caretakers should result in increased comfort
and dignity for patients during their treatment and
enhance recovery and resocialization rates in line
with the relevant EU and World Health Organization
(WHO) standards.
← Pomerite tabelu levo/desno za više detalja →
IV.
APPENDIX 2
Form of Legal Opinion (Framework Loan Agreement)
[INSERT LETTERHEAD]
Council of Europe Development Bank 55, avenue Kléber 75116 Paris (France)
Attn: Projects Department Cc: Office of the General Counsel
[INSERT DATE]
Re: Framework Loan Agreement between the Council of Europe
Development Bank and the Republic of Serbia (Ref: LD [•])
Dear Sir or Madam,
In my capacity as the Minister of Justice, I hereby submit this opinion in line with the provisions of Article 4.5(a)(i) of the Framework Loan Agreement LD 2009 ADD1
(2025) between Council of Europe Development Bank and Republic of Serbia, for an amount of 50,000,000 EUR, signed on _____ and effective as of _____ (hereinafter referred to as the "Loan Agreement"). All the terms that are used here, if not otherwise defined, have the same meaning as in the Loan Agreement.
I have reviewed the Loan Agreement and the provisions of the Constitution of the Republic of Serbia (”Official Gazette of the Republic of Serbia” No. 98/2006 and 115/2021), as well as legal documents and other regulations, and I have undertaken other activities that I deemed necessary in order to submit this opinion.
According to the aforementioned, my opinion is as follows:
(a)
Pursuant to the provision of Article 123, Item 1 of the Constitution of the Republic of Serbia, it is provided that the Government shall establish and pursue the policy, and pursuant to the provision of , Paragraph 1 and Article 43, Paragraph 3 of the Law on Government (”Official Gazette of the Republic of Serbia” No. 55/05, 71/05-corrigendum, 101/07, 65/08, 16/11, 68/12-Constitutional Court, 72/12, 7/14 – Constitutional Court, 44/14 and 30/18-other law) it is provided that the Government shall establish and pursue the policy of the Republic of Serbia, and when it does not pass other acts, the Government adopts conclusions. In line with the referred provisions, the Government at its session held on _______ adopted the Conclusion No: _______, whereby it adopted the Draft Loan Agreement and authorized ______________, to sign the Loan Agreement on behalf of the Government as the representative of the Republic of Serbia;
(b)
Pursuant to the provision of Article 99, Paragraph 1, Item 4 of the Constitution of the Republic of Serbia, it is provided that the National Assembly of the Republic of Serbia ratifies the international treaties when their ratification is provided by law, and subject to the provision under , Paragraph 1 of the Law on Conclusion and Execution of International Treaties (”Official Gazette of the Republic of Serbia” No. 32/13) which provides that an international treaty shall be a treaty which the Republic of Serbia concludes in written form with one or more countries or one or more international organizations, which is governed by international law. Pursuant to the provision of , Paragraph 2 of the Law on Public Debt (”Official Gazette of the Republic of Serbia” No. 61/05, 107/09, 78/11, 68/15, 95/18, 91/19 and 149/20) it is provided that the National Assembly of the Republic of Serbia decides on borrowing of the Republic of Serbia by taking long-term loans, borrowing for investment and program projects financing by taking long-term loans, issuing guarantees, and on direct taking over of the liabilities as a debtor under issued guarantee. In line with the stated provisions, the National Assembly of the Republic of Serbia rendered the Law on Ratification of Framework Loan Agreement LD 2009 ADD 1 (2025) between Council of Europe Development Bank and Republic of Serbia, Project Loan (”Official Gazette of the Republic of Serbia - International Treaties”, No. ______);
(c)
There are no other provisions according to which it would be necessary to submit, record or register the Loan Agreement with any court or state authority or organization in order to secure its legality, effectiveness and enforceability;
(d)
The choice of the law set forth in Article 14 of the Loan Agreement, is legally valid and binding on the Borrower under the laws of the Republic of Serbia;
(e)
Pursuant to Article 15 of the Loan Agreement, the arbitration provisions set forth in Chapter 4 of the CEB Loan Regulations shall apply for any claim or dispute between the Republic of Serbia and the Council of Europe Development Bank arising from the Loan Agreement, and any decision of the arbitration tribunal pertaining to the Loan Agreement can be executed in the Republic of Serbia without re- examination or re-litigation of the matters thereby adjudicated. In line with the aforementioned the waiver of immunity pursuant to Article 15 of the Loan Agreement is legally valid and binding;
(f)
No taxes, customs duties, fees or other impositions, including without limitation taxes, fees or other levies for registration or transfers that are applicable in the Republic of Serbia, or any other unit of territorial autonomy or local government, shall be payable in connection with the conclusion or execution of the Loan Agreement, or in connection with the payments that the Republic of Serbia is to make to the Council of Europe Development Bank under the Loan Agreement;
(g)
No exchange control restrictions are in place or consents are required in order to permit the receipt of all amounts to be disbursed under the Loan Agreement and to permit the repayment of the Loan and the payment of interest and all other amounts due under this Loan Agreement;
(h)
The execution of the Loan Agreement did not, and its performance will not violate any norms of the Republic of Serbia or cause any material breach of any agreement or undertaking to which the Republic of Serbia is bound.
In view of everything stated above, I am of the opinion that all conditions that are stipulated by the Constitution, laws and other acts of the Republic of Serbia which could be applied to the Loan Agreement are met, that the provisions of the Loan Agreement are in full force and effect and that the Loan Agreement is legally valid, binding and enforceable in the Republic of Serbia in accordance with its terms.
Yours faithfully,
MINISTER
[●]
[INSERT NAME(S)/TITLE(S)]
APPENDIX 3
DISBURSEMENT REQUEST (TEMPLATE)
LD [•] – [•] Tranche
With reference to the Framework Loan Agreement dated [●] (hereinafter, the “Agreement”) between the Council of Europe Development Bank (hereinafter, the “CEB”) and [BORROWER] (hereinafter, the “Borrower”), the Borrower hereby requests the CEB, in accordance with Sub-clause 4.3(a) of the Agreement, to proceed with the disbursement of a Tranche under the specific terms and conditions set out below.
Terms defined in the Agreement shall have the same meaning herein, unless otherwise specified.
Currency/Amount1[●]
Disbursement Date[●]
Principal Repayment
Period
[●] years [including a grace period of [●] years]
Principal Repayment
Date(s)
[●]
Maturity Date[●]
Interest RateFixedMaximum [●] per annum
FloatingReference Rate:[[●]-month
EURIBOR/INSERT ANY

OTHER REFERENCE

RATE] per annum
SpreadMaximum [●] basis points
Interest Period[Quarterly] [Semi-annually] in arrears
Interest Payment
Dates
The interest payment will take place on [●] every year and for
the first time on [●]
Day Count ConvetionModified Following Business Day Convention
Business Day[●]
Borrower’s AccountBeneficiary’s Name
Beneficiary’s Bank

Correspondent

Bank (if applicable)
[●]
Name [●]

City [●]

SWIFT [●]

IBAN [●]

Reference [●]

Name [●]

City [●]

SWIFT [●]

IBAN [●]
← Pomerite tabelu levo/desno za više detalja →
For the Borrower [INSERT NAME(S)/TITLE(S)] Date: __________
1 [In case of Sub-Tranches, a separate table shall indicate the Amount, Principal Repayment Period, Principal Repayment Date(s), Interest Rate, Interest Period, Interest Payment Dates for each Sub-Tranche.]
DISBURSEMENT NOTICE (TEMPLATE)
LD [•] – [•] Tranche
In response to your Disbursement Request dated [●] with reference to the Framework Loan Agreement dated [●] (hereinafter, the “Agreement”) between the Council of Europe Development Bank (hereinafter, the “CEB”) and [BORROWER] (hereinafter, the “Borrower”), the CEB hereby notifies to the Borrower, in accordance with Sub-clause 4.3(b) of the Agreement, the terms and conditions of the disbursement of the relevant Tranche.
Terms defined in the Agreement shall have the same meaning herein, unless otherwise specified.
Currency/Amount2[●]
Disbursement Date[●]
Principal Repayment
Period
[●] years [including a grace period of [●] years]
Principal Repayment
Date(s)
[●]
Maturity Date[●]
Interest RateFixed[●] per annum
FloatingReference Rate:[[●]-month EURIBOR/INSERT
ANY OTHER REFERENCE

RATE] per annum
Spread[●] basis points
Interest Period[Quarterly] [Semi-annually] in arrears
Interest Payment DatesThe interest payment will take place on [●] every year and for the first
time on [●]
Day Count ConventionModified Following Business Day Convention
Business Day[●]
Borrower’s AccountBeneficiary’s Name[●]
Beneficiary’s BankName[●]
City[●]
SWIFT[●]
IBAN[●]
Reference[●]
Correspondent
Bank (if applicable)
Name[●]
City[●]
SWIFT[●]
IBAN[●]
CEB’s accountBeneficiary’s NameCouncil of Europe Development Bank
CEFPFRPP

Name Deutsche Bank

City Frankfurt (Germany)

SWIFT DEUTDEFF

IBAN DE44 5007 0010 0928 7384 00
Beneficiary’s SWIFT
Beneficiary’s Bank
← Pomerite tabelu levo/desno za više detalja →
For the CEB [INSERT NAME(S)/TITLE(S)] Date: __________
2 [In case of Sub-Tranches, a separate table shall indicate the Amount, Principal Repayment Period, Principal Repayment Date(s), Interest Rate, Interest Period, Interest Payment Dates for each Sub-Tranche.]
APPENDIX 4
Form of Certificate
[INSERT LETTERHEAD]
To: Council of Europe Development Bank
From: [BORROWER]
Date: [NOT EARLIER THAN FIVE (5) BUSINESS DAYS BEFORE THE DISBURSEMENT REQUEST]
Subject: Framework Loan Agreement between Council of Europe Development Bank and [BORROWER] dated [●] (the “Agreement”).
Dear Sir or Madam,
Terms defined in the Agreement have the same meaning when used in this Certificate. For the purposes of Sub-clause 4.5 of the Agreement, we hereby certify to you as follows:
(a)
No Material Adverse Change has occurred, as compared with the situation at the date of signature of the Agreement;
(b)
No Cross-Default Event has occurred;
(c)
None of the Borrower’s Debt Instruments includes loss-of-rating, financial ratios or pari passu provisions that are stricter than any equivalent provision of the Agreement;
(d)
The representations and warranties to be made or repeated by us under Clause 8 of the Agreement are true in all respects; in particular, no Security has been granted to a third party in breach of Sub-clause 7.2 of the Agreement; and
(e)
No event or circumstance which could give rise to the early reimbursement, suspension or cancellation of the Loan under the terms of Articles 3.3 (Early reimbursement of disbursed loans), 3.5 (Suspension by the Bank of undisbursed loans) and 3.6 (Cancellation by the Bank of undisbursed loans) of the Loan Regulations has occurred or may reasonably be expected to/is likely to occur.
For the [BORROWER]
[INSERT NAME(S)/TITLE(S)]
APPENDIX 5
Progress /Completion Report
1. Narrative part
Construction of a new building for the University Children’s Hospital Tiršova
(Tiršova 2)
(Reporting period ________ – _________)
I. INTRODUCTION
II. ACTIVITIES RELATED TO PROCUREMENT
III. WORK PROGRESS
Preparatory works
Ongoing Works
IV. FINANCIAL ACTIVITIES
V. UPCOMING ACTIVITIES
VI. COMMUNICATION AND VISIBILITY ACTIVITIES
VII. DEVIATIONS FROM THE PLAN AND DIFFICULTIES ENCOUNTERED 2.
Monitoring
Table 1 - IMPLEMENTATION PLAN
Country: Serbia, University Children's Hospital in Belgrade
Project: LD 2009 (2025)
Project title: UCH Tirsova Reporting cut-off date: 25/01/2025 Tables
Activities 2019 2020 2021 2022 2023 2024 2025 2026 2027
% of completion (indicative list, subject to revision) Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Feasibility Study and Schematic Design Baseline* 1.
(development and approval) Actual ** 100% Tender for Design for construction Baseline* Performed with UNDP. Completion: 100% permit "PGD" (development of tender 2.
dossier, tendering, evaluation and Actual ** contract signature)
3. Development of Design for construction Baseline permit "PGD", its approval and Inception phase has been extended in order to obtaining construction permit Actual accommodate extensive discussion with future user. Completion: 100%
4. Baseline Relocation of tenants Actual 100%
5. Tender for Design for construction "PZI" Baseline and Construction (development of tender dossier, tendering, evaluation Actual and contract signature) 100%
6. Baseline Development of Design for construction "PZI" (development and approval) Actual 100%
7. Baseline 0% Construction of the hospital Actual 0%
8. Installation of medical equipment and Baseline 0% training of staff Actual 0%
9. Commissioning of the hospital Baseline 0% Actual 0%
10. Employment of hospital staff Baseline 0% Actual 0%
11. Accreditation and opening of the Baseline 0% hospital Actual 0%
*Baseline implementation plan = plan presented in the FLA
Indicators of achievement
TABLE 2 - INDICATIVE OUTPUT/OUTCOME INDICATORS
Country: Serbia, University Children's Hospital in Belgrade
Project: LD 2009 Add1_______(2025)
Project title:_______________ Reporting cut-off date: ______________
IndicatorsUnitsBaseline*Project targetAchieved at the
completion
Project Investment Cost (Total)Million €75110
Project timescale control Start / End of WorksMonth / Year03/2020 -
06/2023
Jun-24
Inpatient bed numbers as plannednr218
Improving ALOS (-)/ABO (+) performanceDays & %
Medical equipment purchased to reduce
bottlenecks and waiting lists and waiting times
MEUR and nr.34 MEUR
Continuing planned increases in ambulatory,
day and short stay productivity achieved
nr
Waiting list and waiting times for non-urgent
surgical interventions reduced
nr
weeks
Waiting list and waiting times for ambulatory
and diagnostic tests reduced
nr
weeks
Reductions in avoidable morbidity and
mortality in particular the rate of HAI
%
Total
inpatients
Construction gross floor aream²33,297
Full Time Equivalent (FTE) health care
professionals
nr900
Full Time Equivalent (FTE) total staffnr1050
Proportion of male/female staff employed by
medical, nursing and non-medical categories
%
Number of beds per room%1-Feb
Share of patients covered by national insurance%
Unit costs per case treated reducedEUR/case
Share of annual operating costs spent on PPM
adequate to maintain quality of infrastructure
%
Reductions in greenhouse gases emissions or
consumption, if available
%, t CO2 eq or
kWh/m²/year
Energy certificate level (A,B,C) targeted, if
available
Level
← Pomerite tabelu levo/desno za više detalja →
Financial
Report
TABLE 3 a: OVERALL PROJECT COSTS and FINANCING SOURCES in EUR (net of VAT)
Country: Serbia, University Children's Hospital in Belgrade
Project: LD 2009 Add 1_______(2025)
Project title: University Children's Hospital: Tirsova 2_______________ Reporting date 25/01/2025
GAF budget componentsTotal project
costs (GAF Plan)
Total project costs
(Eligible - GAF

Plan)
Revised costDifference (increaseRevised costDifferenceIncurred costs%
Incurred
Forecasted costs
Cost items included under each GAF headingSources of financingestimate,
date 05/2022
/ decrease)
date 05/2022
Justification for changes
date 05/2022
estimate,
date 05/2024
(increase /
decrease)

date 05/2024
Justification for changes
date 05/2024
year __2019year_2020year_2021year __2022year __2023year 2024 (Q1,
Q3, Q4)
year 2025 (Q1)Total incurred(out of
revised

costs)
Up to the
Completion
of which in the next 12
months
(A)(B)in RSDin EURin RSDin EURin RSDin EURin RSDin EURin RSDin EURin RSDin EURin RSDin EURin RSDin EUR
(B)
%A - B
1Planning/design fees2,000,00001.1Design for building permit and
technical control
CEB loan / State
budget
Geotechical and other studies
of the location were performed
1.2Design for demolition of the existing
buildings
CEB loanas the part of Design for building
permit.
1.3Preparation of Health and Safety
Reports
CEB loan4,200,0002,200,0002,985,410985,410Value after all contracts were
executed
1.4Urban project developmentCEB loan
1.5Main designCEB loan
2Land purchase10,000,00002Landin-kind, value to be
assessed
10,000,000010,000,0000
3TA for project preparation1,500,0001,500,0003.1Prefeasibility StudyCEB managed trust
funds
450,000-1,050,000Geotechical and other studies of
the location were performed as

the part of Design for building

permit.
391,213-1,108,787Value after all contracts were
executed
3.2Tender dossier for the Feasibility StudyCEB managed trust
funds
3.3Feasibility study, schematic design and
tender dossier
CEB managed trust
funds
3.4Technical StudiesState budget
4TA for project
implementation
2,000,0002,000,0004.1Construction supervision, Designers
supervision with BIM monitoring,

Preparation of health and safety plans

for construction works on Hospital

"Tiršova 2" in Belgrade
CEB loan3,000,0001,000,000Increase due to the marketprice
of construction increase
5,500,0002,500,000Designers supervision, with
BIM management through out

the construction has been

added 2.5 mill EUR plus

Preparation of health and

safety plans for construction

works on Hospital "Tiršova 2" in

Belgrade - 36.541,00 EUR
4.2TA for project implementationState budget
5Works61,500,00061,500,0005.1Demolition and cleaning of the siteState budget1,200,000
7,000,000
1,200,000
9,127,318
Contract completed
Contract completed
5.2Preparatory works on the constructionsCitEeB loan
5.3Supervision of preparatory worksCEB loanIncrease due to the current and257,052
5.4ConstructionWBIF grant; CEB loan;
State budget
95,000,000-60,300,000anticipated market price
increase
118,000,00072,084,370The contracted value, price
established after the tender.

Acces roads construced

through phase
5.5Parking/access roadsState budget; CEB
loan
6Supply36,453,00036,453,0006.1Main medical equipmentCEB loan; State budget39,000,0002,547,000Increase due to the marketprice
of construction increase
39,000,0002,547,000The budget for the equipment
is provisional, the list of

equipment is still to be

determined.
6.2Mobile medical and non-medical
equipment
CEB loan; State budget
7Communication and
visibility
50,00050,0007Communication and visibilityWBIF grant50,000050,0000
8Evaluation and Audit50,00008Evaluation and auditState budget50,000050,0000
9Contingency3,000,0003,000,0009ContingencyState budget3,000,00003,000,0000
TOTAL116,553,000104,503,000TOTAL162,950,00046,397,000189,560,99377,007,993
← Pomerite tabelu levo/desno za više detalja →
Sources of financingIndicate the sources offinancing of incurred costsIndicate the sources offinancing of forecasted costs -
WBIF grant
CEB loan
CEB managed trust funds
State budget
← Pomerite tabelu levo/desno za više detalja →
Sources of
financing
ComponentAmount
WBIF grant5.4, 735,000,000
CEB loan1.1, 1.2, 1.3, 1.4, 1.5,
5.2, 5.3, 5.4, 6.1, 6.2
104,000,000
CEB managed
trust funds
3.1, 3.2, 3.3317,330
State budget2, 3.4, 4.1, 4.2, 5.1,
,5.4, 5.5, 6.1,6.2, 8, 9
50,243,663
189,560,993
← Pomerite tabelu levo/desno za više detalja →
TABLE 3 b: COSTS under WORKS and COMMUNICATION AND VISIBILITY CONTRACTS, co-financed by WBIF (net of VAT)
COSTS INCURREDPAYMENT MODALITIESSOURCE OF FUNDINGTOTAL
Cost itemPlanned
budget
Contract
signed in LC

(if applicable)
Contract signedInvoice type
(advance or

interim)
Invoice no.Date of
invoice
Interim invoice
amount

(in LC)

if applicable
Interim invoice
Amount

(in EUR)
Advance
Invoice

amount

(in EUR)
Advance set-
off against cost

invoice (in

EUR)
Amount of
interim invoice

paid
Date of
payment
WBIF grantCEB loanNational
contributio

n
(in RSD)(in EUR)1(in RSD)(in EUR)2(in EUR)2(in EUR)2(in EUR)3
Works Contract
Subtotal works
Communication
and Visibility

(C&V)
Subtotal C&V
TOTAL0.00
← Pomerite tabelu levo/desno za više detalja →
(1) Please apply the exchange rate at the date of contract signature
(2) Please apply the exchange rate at the date of invoice
(3) Please apply the exchange rate at the date of payment
TABLE 4 -PROCUREMENT PLAN (net of VAT)
Date of procurement plan
Date of procurement plan revision
← Pomerite tabelu levo/desno za više detalja →
COUNTRY : SERBIA
PROJECT: LD 2009 (2025) Add1 New University Children Hospital Tirsova 2
BORROWER:
Ref. No.Contract DescriptionContracted Value EUROEstimated Cost EUROFinanced byNumber of
Lots
Procurement
Method
Domestic
Preference
Review by
the Bank

(PRIOR /

POST)
Expected
Date of Bid

Launching

for Short-

listing
Expected Date of
Bid

Opening
Expected
Date of Bid

Evaluation
Date of
Contract

Signature
Completion
Date
Estimated
Completion

Date
Type (Works,
Services,

Goods)
Filter
← Pomerite tabelu levo/desno za više detalja →
TABLE 5 - LIST OF AWARDED CONTRACTS
Country: Serbia, University Children's Hospital Tirsova 2 in Belgrade
Project: LD 2009 Add1 (2025)
Project title: Tirsova 2 University Children's Hospital Reporting cut-off date: ______________
Ref number Contract Description Title N S a u m p e p lier / Contractor Country in RSD Contract amoun in t [ E 1 U ] R C c a o te n g [ t 2 r o ] a r c y t s of P s e i c g D r o i n a o n a t d t e t r u a o o r c f e f t i / m plem En en d t d a a ti t o e n Contract in a m RS o D unt paid Contr i a n p c [ a t E 3 i U a ] d m R ount Ta e k q e ( u w o ip o v m r e k r e s d / n a t) te Modification (Comments)
Start date
Acronyms to be used: W for Works, G for Goods and S for services.
Ugovor — srpski tekstČl. 1.1–7.4

UvodUvod
LD 2009 ADD 1 (2025)
OKVIRNI SPORAZUM O ZAJMU
između
BANKE ZA RAZVOJ SAVETA EVROPE
i
REPUBLIKE SRBIJE
Univerzitetska dečja klinika, Tiršova 2
- Projektni zajam -
SADRŽAJ
1. TUMAČENJE ....................................................................................................................
1.1 DEFINICIJE ................................................................................................................... 1.2 STRUKTURA ................................................................................................................. 1.3 NASLOVI ...................................................................................................................... 1.4 ZAOKRUŽIVANJE ...........................................................................................................
2. USLOVI.............................................................................................................................
3. SVRHA .............................................................................................................................
4. FINANSIJSKI USLOVI ......................................................................................................
4.1 IZNOS ZAJMA ............................................................................................................... 4.2 IZNOS A ISPLATU .......................................................................................................... 4.3 POSTUPAK ISPLATE ...................................................................................................... 4.4 PEROD ISPLATE ............................................................................................................ 4.5 USLOVI ZA ISPLATU ....................................................................................................... 4.6 OTPLATA ..................................................................................................................... 4.7 PREVREMENA OTPLATA ................................................................................................ 4.8 ODREĐIVANJE KAMATE ................................................................................................. 4.9 STOPA ZATEZNE KAMATE .............................................................................................. 4.10 DOGAĐAJ POREMEĆAJA NA TRŽIŠTU .............................................................................. 4.11 ISPLATE .......................................................................................................................
5. SPROVOĐENJE PROJEKTA ...........................................................................................
5.1 OBAVEZNA BRIGA ........................................................................................................ 5.2 PERIOD ALOKACIJE ....................................................................................................... 5.3 TROŠKOVI PROJEKTA .................................................................................................... 5.4 POSEBNE OBAVEZE PO PROJEKTU ................................................................................. 5.5 NABAVKA ..................................................................................................................... 5.6 MERE ZAŠTITE U OBLASTI ŽIVOTNE SREDINE I SOCIJALNE MERE ZAŠTITE........................... 5.7 LJUDSKA PRAVA ........................................................................................................... 5.8 INTEGRITET ................................................................................................................. 5.9 TRANSPARENTNOST .....................................................................................................
6. PRAĆENJE ......................................................................................................................
6.1 IZVEŠTAVANJE ......................................................................................................... … 6.2 POSETE ....................................................................................................................... 6.3 REVIZIJA ...................................................................................................................... 6.4 INFORMACIJE O PROJEKTU ............................................................................................ 6.5 PODACI O ZAJMOPRIMCU .............................................................................................. 6.6 FINANSIJSKE ODREDBE .................................................................................................
7. PARI PASSU ....................................................................................................................
7.1 RANGIRANJE ................................................................................................................ 7.2 SREDSTVO OBEZBEĐENJA ............................................................................................. 7.3 KLUZULA KOJA SE NAKNADNO UNOSI ............................................................................. 7.4 PREVREMENA OTPLATA TREĆIM LICIMA ..........................................................................
8. IZJAVE I GARANCIJE ......................................................................................................
9. TREĆA LICA ....................................................................................................................
10. NEODRICANJE ................................................................................................................
11. PRENOS ...........................................................................................................................
12. NEZAKONITOST ..............................................................................................................
13. BEZ PRIMENE ODREDBE ZBOG PROMENE OKOLNOSTI ...........................................
14. MERODAVNO PRAVO .....................................................................................................
15. SPOROVI ..........................................................................................................................
16. ZAŠTITA PODATAKA ......................................................................................................
17. OBAVEŠTENJA ...............................................................................................................
18. POREZI I RASHODI .........................................................................................................
19. ISPLAĆIVANJE ................................................................................................................
20. STUPANJE NA SNAGU ..................................................................................................
PRILOG 1 ................................................................................................................................
PRILOG 2 ................................................................................................................................
PRILOG 3 ................................................................................................................................
PRILOG 4 …………………………………………………………………………………..............…
PRILOG 5 …………………………………………………………………………………….............. BANKA ZA RAZVOJ SAVETA EVROPE, međunarodna organizacija sa sedištem u 55, avenue Kléber, 75116 Pariz (Francuska) (u daljem tekstu, “BRSE” ili “Banka”), s jedne strane,
i
REPUBLIKA SRBIJA, (u daljem tekstu, “Zajmoprimac” i zajedno sa BRSE, “Strane”, a svaka pojedinačno “Strana”), s druge strane,
S OBZIROM NA TO DA
(A) Imajući u vidu Okvirni sporazum o zajmu između Strana zaključenog 20. novembra 2019. godine sa brojem LD 2009 (2019) (u daljem tekstu, “Prvobitni sporazum“) kojim je BRSE pristao da Zajmoprimcu stavi na raspolaganje zajam u iznosu od 54.000.000 evra (u daljem tekstu, “Inicijalni
zajam“),
(B) Imajući u vidu zahtev za zajam podnet od strane Republike Srbije kroz njeno Ministarstvo finansija 7. avgusta 2025. godine, kojim je Zajmoprimac tražio povećanje iznosa Inicijalnog zajma od pedeset miliona evra (EUR 50.000.000), za delimično finansiranje Univerzitetske dečje klinike, Tiršova,
(C) Imajući u vidu da je Administrativni savet BRSE-a 1. oktobra 2025. godine odobrio pomenuti zahtev za zajam, kojim je povećan iznos Inicijalnog zajma za pedeset miliona evra (EUR 50.000.000), za delimično finansiranje Univerzitetske dečje klinike, Tiršova, sa pozivanjem na LD 2009 ADD 1 (2025),
(D) Imajući u vidu Treći protokol od 6. marta 1959. godine Opšteg sporazuma o povlasticama i imunitetu Saveta Evrope od 2. septembra 1949. godine,
(E) Imajući u vidu Propise o zajmu BRSE, koji su usvojeni Rezolucijom Administrativnog saveta BRSE 1587 (2016) (u daljem tekstu “Propisi o
zajmu”),
(F) Imajući u vidu politiku BRSE o zajmovima i finansiranju projekata, koja je usvojena Rezolucijom Administrativnog Saveta BRSE 1646 (2022) (u daljem
tekstu, “Kreditna politika”),
(G) Imajući u vidu Politiku o zaštiti životne sredine i merama socijalne zaštite BRSE, koja je usvojena Rezolucijom Administrativnog Saveta BRSE 1588
(2016) (u daljem tekstu „Politika o zaštiti životne sredine i merama
socijalne zaštite”),
(H) Imajući u vidu Smernice o nabavkama BRSE, koje je usvojio Administrativni savet BRSE u septembru 2011. godine (u daljem tekstu, “Smernice o
nabavkama”),
(I) Imajući u vidu Uredbu o zaštiti podataka BRSE, kako je usvojena Rezolucijom 1639 (2022) Administrativnog saveta BRSE (u daljem tekstu „Uredba o
zaštiti podataka“),
(J) Imajući u vidu Povelju o antikorupciji BRSE, koja je usvojena Rezolucijom Administrativnog saveta BRSE 1628 (2021), i
(K) Imajući u vidu Politiku BRSE o neusaglašenim/nekooperativnim jurisdikcijama, usvojenu Rezolucijom Administrativnog saveta BRSE 1630 (2021),
OVIM SE DOGOVARAJU O SLEDEĆEM:
1.Čl. 1.1–1.4

TUMAČENjE

Odredba1.1

Definicije

Sledeći termini će imati značenje koje je naznačeno u tekstu ispod, osim kada kontekst zahteva drugačije:
“Sporazum” označava okvirni sporazum o zajmu, uključujući priloge.
“Alokacija” označava raspoređivanje Tranše od strane Zajmoprimca na kvalifikovane delove Projekta čak i ako navedena tranša još nije isplaćena u skladu sa Projektom.
“Period alokacije” ima značenje definisano u potklauzuli 5.2.
“Radni dan” označava u vezi sa plaćanjima u evrima, dan kada funkcioniše T2 (the real time gross settlement system operated by the Eurosystem - sistem za bruto poravnanja u realnom vremenu kojim upravlja Eurosistem) ili bilo koji njegov sledbenik otvoren za poravnanje plaćanja u evrima.
“Potvrda“ ima značenje određeno u potklauzuli 4.5 i forma je data u Prilogu 4 ovog sporazuma.
“Datum zaključenja zajma” označava datum koji je određen u Prilogu 1 ovog sporazuma posle koga Zajmoprimac ne može tražiti dalje isplate. Taj datum može biti promenjen nakon pisane saglasnosti obe Strane, putem razmene pisama.
“Završni izveštaj” ima značenje definisano u potklauzuli 6.1(b).
“Događaj neispunjenja obaveza“ ima značenje navedeno u potklauzuli 6.6.
“Valuta” označava, u svrhe ovog sporazuma, evro.
“Konvencija za utvrđivanje broja dana” označava konvenciju za utvrđivanje broja dana između dva datuma i broja dana u godini koji su naznačeni u relevantnom Obaveštenju o isplati.
“Instrument zaduživanja” označava (i) svaki zajam ili drugi oblik finansijske zaduženosti; (ii) instrument, koji uključuje priznanicu ili izvod stanja na računu, kojim se dokazuje ili predstavlja obaveza da se vrati zajam, depozit, avans ili drugo produženje kredita (uključujući bez ograničavanja produženje kredita u skladu sa sporazumom o refinansiranju ili reprogramu), (iii) obveznicu, notu, dužničke vrednosne hartije, obligacije ili slične pisane dokaze o finansijskoj zaduženosti; ili (iv) instrument kojim se dokazuje garancija o obavezi koja predstavlja finansijsku zaduženost prema drugom.
“Stopa zatezne kamate” ima značenje određeno u skladu sa potklauzulom 4.9.
“Datum isplate” označava datum na koji Tranša treba da bude isplaćena u skladu sa primenljivim Obaveštenjem o isplati.
“Obaveštenje o isplati” ima značenje definisano u potklauzuli 4.3(b).
“Zahtev za isplatu” ima značenje definisano u potklauzuli 4.3(a).
“EU” označava Evropsku uniju.
“EURIBOR” označava procentualnu stopu koju navodi bilo koji dobavljač finansijskih vesti prihvatljiv za BRSE na ili oko 11:00 sati po vremenu u Briselu na Datum utvrđivanja kamate kao evro-finansijske stope finansiranja kojom upravlja Evropski institut za tržište novca (ili bilo koje drugo lice koje preuzima upravljanje nad tom stopom) za isti period kao relevantni Kamatni period.
Ako relevantni Kamatni period nije isti kao period koji je naveo relevantni dobavljač finansijskih vesti, primenljivi EURIBOR će biti procentualna stopa koja je rezultat linearne interpolacije upućivanjem na dve (2) EURIBOR stope, od kojih je jedna primenljiva za period celih meseci pri čemu je sledeći kraći i druga za period celih meseci pri čemu je sledeći duži nego što je dužina relevantnog Kamatnog perioda.
“Evro” i simbol “EUR” označava zakonsku valutu država članica EU koje je s vremena na vreme usvajaju kao svoju valutu u skladu sa relevantnim odredbama Ugovora o EU i Ugovora o funkcionisanju EU ili njihovim ugovorima naslednicima.
“Evropska konvencija o ljudskim pravima” označava Konvenciju o zaštiti ljudskih prava i osnovnih sloboda od 4. novembra 1950. godine, CETS br. 5, koja se povremeno menja i dopunjava.
“Evropska socijalna povelja” označava Evropsku socijalnu povelju od 3. maja
1996. godine, CETS br. 163, koja se povremeno menja i dopunjava.
“Krajnji korisnici” su definisani Prilogom 1 ovog sporazuma kao grupa koja ima koristi od socijalnih rezultata projekta.
“Fiksna kamatna stopa” označava godišnju kamatnu stopu određenu u primenljivom Obaveštenju o isplati.
“Varijabilna kamatna stopa” označava godišnju kamatnu stopu koja ja utvrđena dodavanjem ili oduzimanjem Raspona određenog u primenljivom Obaveštenju o isplati, na ili od, zavisno od slučaja, Referentne kamatne stope.
Da bi se izbegla bilo kakva sumnja, kada utvrđivanje Varijabilne kamatne stope ima za rezultat negativnu kamatnu stopu (usled navedene negativne Referentne kamatne stope, na funkcionisanje Raspona koji je oduzet od Referentne kamatne stope ili zbog bilo kakvih drugih okolnosti), smatraće se da kamata koju treba da plati Zajmoprimac za Kamatni period iznosi nula.
“Prognozirani troškovi” označavaju planirane prihvatljive troškove koji će nastati u okviru Projekta u periodu od jedne (1) godine od datuma poslednjeg Izveštaja o napretku.
“Nastali troškovi” označavaju prihvatljive troškove nastale u okviru Projekta.
“Inicijalni zajam“ ima značenje koje mu je dato u Preambuli.
“Datum utvrđivanja kamate” označava, u svrhe utvrđivanja varijabilne kamatne stope, dan koji pada dva (2) Radna dana pre prvog dana Kamatnog perioda, osim ako nije drugačije naznačeno u relevantnom Obaveštenju o isplati.
“Datumi za plaćanje kamate” označavaju datume za plaćanje kamate koji odgovaraju relevantnom Kamatnom periodu određenom u primenljivom Obaveštenju o isplati.
“Kamatni period” označava period koji započinje na Datum plaćanja kamate i završava se na dan koji je dan pre sledećeg Datuma plaćanja kamate, pod uslovom da prvi Kamatni period primenljiv na svaku Tranšu započinje na Datum isplate i završava se na dan pre sledećeg Datuma za plaćanje kamate.
“Zajam” označava zajam koji je odobren Zajmoprimcu od strane BRSE u skladu sa ovim Sporazumom.
“Iznos zajma” označava iznos definisan u skladu sa potklauzulom 4.1.
“Događaj poremećaja na tržištu” ima značenje definisano u potklauzuli 4.10. “Materijalna negativna promena” označava svaki događaj koji, po mišljenju BRSE,
i)
materijalno ugrožava sposobnost Zajmoprimca da izvršava svoje finansijske obaveze u skladu sa Sporazumom; (ii) na negativan način utiče na Sredstvo obezbeđenja koje je dostavio Zajmoprimac ili treće lice da bi se osiguralo blagovremeno izvršenje finansijskih obaveza Zajmoprimca u skladu sa Sporazumom; ili (iii) negativno utiče na bilo koja prava ili pravne lekove BRSE-a prema Sporazumu.
“Datum dospeća” označava poslednji Datum za otplatu glavnice za svaku Tranšu koja je određena u primenljivom Obaveštenju o isplati.
jeste konvencija po kojoj
ukoliko određeni datum pada na dan koji nije Radni dan, taj dan će biti prvi sledeći
dan koji je Radni dan, osim ako taj dan pada u narednom kalendarskom mesecu, u
tom slučaju taj dan će biti prvi Radni dan koji prethodi određenom datumu.
← Pomerite tabelu levo/desno za više detalja →
“Konvencija o modifikovanom narednom radnom danu”
“Potvrda o prevremenoj otplati” ima značenje definisano u potklauzuli 4.7.
“Troškovi prevremene otplate” ima značenje definisano u potklauzuli 4.7.
“Datum prevremene otplate” ima značenje definisano u potklauzuli 4.7.
“Obaveštenje o prevremenoj otplati” ima značenje definisano u potklauzuli 4.7.
“Datum(i) otplate glavnice” označava datum(e) za otplatu(e) glavnice u skladu sa svakom Tranšom utvrđenom primenljivim Obaveštenjem o isplati.
“Period za otplatu glavnice” označava u odnosu na svaku Tranšu period koji protiče od Datuma njene isplate do Datuma dospeća.
“Izveštaj o napretku” ima značenje definisano u potklauzuli 6.1(a).
“Zabranjeno delovanje” ima značenje definisano u potklauzuli 5.8.
“Projekat” označava kvalifikovane programe ulaganja utvrđenih u skladu sa Prilogom 1 kako bi se delimično finansirali pomoću Zajma koji je odobrio Administrativni savet BRSE sa ref. LD 2009 ADD 1 (2025).
“Telo za sprovođenje projekta” (u daljem tekstu “TSP”) označava pravno lice koje je, po osnovu ovlašćenja Zajmoprimca, zaduženo za sprovođenje Projekta.
“Jedinica za sprovođenje projekta” (u daljem tekstu „JSP“) označava tim određen od strane TSP koji je zadužen za svakodnevno upravljanje Projektom.
“Referentna kamatna stopa označava EURIBOR za Tranšu po varijabilnoj kamatnoj stopi koja je denomonirana u evrima.
“Lista sankcija” označavaju (i) bilo koje ekonomske, finansijske i trgovinske restriktivne mere i embargoe na oružje, izmenjene i dopunjene s vremena na vreme, koje je izdala EU u skladu sa poglavljem 2 odeljka V Ugovora o Evropskoj uniji, kao i članom 215 Ugovora o funkcionisanju Evropske unije; ili (ii) bilo koje ekonomske, finansijske i trgovinske restriktivne mere i embargoe na oružje, izmenjene i dopunjene s vremena na vreme, koje je izdao Savet bezbednosti Ujedinjenih nacija u skladu sa članom 41. Povelje UN-a.
“Sankcionisana lica” označava bilo koje fizičko ili pravno lice koje je navedeno i/ili na neki drugi način se nalazi na jednoj ili više Lista sankcija.
povlašćeni
položaj, pravo prečeg plaćanja, sredstvo obezbeđenja ili garanciju bilo koje vrste koje
bi mogle preneti povećana prava na treća lica
← Pomerite tabelu levo/desno za više detalja →
“Sredstvo obezbeđenja” označava sporazum ili dogovor koji stvara
.
“Raspon” označava, u skladu sa Tranšama po varijabilnoj kamatnoj stopi, fiksni raspon u odnosu na Referentnu kamatnu stopu (koja je negativna ili pozitivna) određen u baznim poenima u primenljivom Obaveštenju o isplati. “Tranša” predstavlja iznos koji je isplaćen ili iznos koji treba da bude isplaćen iz Zajma.
Odredba1.2

Struktura

Osim ukoliko kontekst ne zahteva drugačije, upućivanja na:
i)
ovaj sporazum tumačiće se kao upućivanja na ovaj sporazum koji može biti dopunjen, izmenjen ili prepravljen s vremena na vreme;
ii)
Strana ili bilo koje drugo lice uključuje svoje naslednike u nazivu ili one dozvoljene putem prenosa;
iii)
“Klauzule”, “Potklauzule” i “Uvodne izjave” tumačiće se kao upućivanja na klauzule, potklauzule i uvodne izjave pojedinačno u ovom sporazumu; i
iv)
reči koje su u jednini uključivaće i množinu i obrnuto.
Odredba1.3

Naslovi

Naslovi u ovom sporazumu nemaju pravni značaj i ne utiču na njegovo tumačenje.
Odredba1.4

Zaokruživanje

U svrhe obračuna iz ovog sporazuma:
i)
svi procenti koji predstavljaju rezultat navedenih obračuna sem onih koji su utvrđeni kroz upotrebu interpolacije biće zaokruženi, po potrebi, na najbliži stohiljaditi deo procentnog poena (na primer 9,876541% (ili ,09876541) se zaokružuju na 9,87654% (ili ,0987654) i 9,876545% (ili ,09876545) se zaokružuju na 9,87655% (ili ,0987655));
ii)
svi procenti utvrđeni kroz upotrebu linearne interpolacije upućivanjem na
(2)
relevantne Referentne kamatne stope biće zaokruženi, po potrebi, u skladu sa metodom utvrđenom u pododeljku (i) iznad, ali u istom stepenu tačnosti kao i dve (2) stope koje se koriste za određivanje (osim kada navedeni procenti neće biti zaokruženi na niži nivo tačnosti nego što je najbliži hiljaditi deo procentnog poena (0,001%)); i
iii)
svi iznosi valuta koji se koriste ili predstavljaju rezultat gorenavedenih kalkulacija biće zaokruženi, osim ako je drugačije naznačeno u relevantnoj definiciji valute, na najbliža dva decimalna mesta relevantne valute (sa ,005 koje se zaokružuje prema gore (na primer, ,674 se zaokružuje na ,67, dok se ,675 zaokružuje na ,68).
UvodUvod
Zajam se odobrava u skladu sa opštim uslovima Propisa o zajmu i pod posebnim uslovima Sporazuma.
UvodUvod
BRSE odobrava Zajam Zajmoprimcu, koji ga prihvata, jedino u svrhu finansiranja Projekta kako je opisano u Prilogu 1.
Sredstva Zajma ne mogu se koristiti za plaćanje poreza, carina ili drugih taksi.
Svaka promena načina na koji se Zajam koristi koja nema prethodno pisano odobrenje BRSE predstavljala bi događaj u smislu člana 3.3 (h) Propisa o zajmu i može dovesti do prevremene otplate, obustave ili otkaza Zajma u skladu sa uslovima članova 3.3 (Prevremena otplata isplaćenih zajmova), 3.5 (Obustava neisplaćenih zajmova od strane banke) i 3.6 (Otkazivanje od strane banke isplate neisplaćenih zajmova) Propisa o zajmu.
4.Čl. 4.1–4.11

FINANSIJSKI USLOVI

Odredba4.1

Iznos Zajma

Iznos Zajma je:
PEDEST MILIONA EVRA
EUR 50.000.000
Odredba4.2

Iznos za isplatu

Zajam će biti isplaćen minimalno u dve (2) Tranše. Iznos svake Tranše, biće utvrđen u skladu sa Prognoziranim troškovima i/ili Nastalim troškovima. Iznos prve Tranše neće prekoračiti dvadeset pet (25%) iznosa Zajma.
Odredba4.3

Postupak isplate

Isplata svake tranše utvrđuje se putem sledeće procedure:
a)
Zahtev za isplatu
Pre svake isplate, Zajmoprimac će podneti BRSE zahtev za isplatu koji je suštinski u obliku koji je utvrđen u skladu sa Prilogom 3 ovog sporazuma (u daljem tekstu
“Zahtev za isplatu”).
Zahtev za isplatu će utvrditi sledeće:
i)
Valutu(e) i iznos(e) Tranše;
ii)
Datum isplate; navedeni datum isplate biće Radni dan koji pada barem pet (5) Radnih dana, nakon datuma podnošenja Zahteva za isplatu;
iii)
Datum(e) za otplatu glavnice, uključujući Datum dospeća, uzimajući u obzir da Period za otplatu glavnice za svaku Tranšu neće prekoračiti dvadeset (20) godina uključujući period počeka od najviše pet (5) godina;
iv)
Maksimalnu fiksnu kamatnu stopu ili maksimalan raspon u odnosu na Referentnu kamatnu stopu;
v)
Kamatni period i Datume za plaćanje kamate;
vi)
Konvenciju za utvrđivanje dana i Radne dane; i
vii)
Račun Zajmoprimca za plaćanja.
Svaki Zahtev za isplatu koji je isporučen BRSE biće neopoziv, osim ako je drugačije dogovoreno u pisanom obliku od strane BRSE.
b)
Obaveštenje o isplati
Ako BRSE primi Zahtev za isplatu koji je u skladu sa uslovima Zahteva za isplatu utvrđenim u potklauzuli 4.3(a) u tekstu iznad, i ako su svi drugi relevantni Uslovi za isplatu definisani potklauzulom 4.5 (Uslovi za isplatu) u tekstu ispod ispunjeni od strane Zajmoprimca, BRSE će isporučiti Zajmoprimcu obaveštenje o isplati u obliku koji je definisan Prilogom 3 ovog sporazuma (u daljem tekstu, “Obaveštenje o isplati”). Svako Obaveštenje o isplati biće isporučeno barem dva (2) Radna dana pre predloženog Datuma isplate.
Obaveštenje o isplati će navoditi sledeće:
i)
Valutu(e) i iznos(e) Tranše;
ii)
Datum isplate;
iii)
Period za otplatu glavnice i Datum(e) za otplatu glavnice, uključujući Datum dospeća;
iv)
Fiksnu kamatnu stopu ili Raspon u odnosu na Referentnu kamatnu stopu;
v)
Kamatni period i Datume za plaćanje kamate;
vi)
Konvenciju za utvrđivanje dana i Radne dane; i
vii)
Račune Zajmoprimca i BRSE za plaćanja.
Obaveštenje o isplati koje se podudara sa elementima Zahteva za isplatu predstavljaće neopozivu i bezuslovnu rešenost Zajmoprimca da uzme pozajmicu od BRSE i sa strane BRSE da isplati Tranšu Zajmoprimcu u skladu sa uslovima određenim u Obaveštenju o isplati.
Bez obzira na gore navedeno, ako BRSE nije isporučila Obaveštenje o isplati u roku od dvadeset (20) Radnih dana nakon prijema Zahteva za isplatu, smatraće se da je relevantni Zahtev za isplatu otkazan.
Odredba4.4

Period isplate

Osim ako je BRSE drugačije dogovorio u pisanom obliku, Zajmoprimac neće imati pravo na:
i)
Podnošenje Zahteva za isplatu prve Tranše nakon (12) meseci posle datuma od potpisivanja Sporazuma od strane Strana;
ii)
Podnošenje bilo kakvog dodatnog Zahteva za isplatu nakon osamnaest
(18)
meseci od poslednje isplate; ili
iii)
Podnošenje bilo kakvog dodatnog Zahteva za isplatu nakon datuma koji pada petnaest (15) Radnih dana pre Datuma zaključenja zajma.
Odredba4.5

Uslovi za isplatu

a)
Uslovi koji prethode Zahtevu za isplatu prve Tranše:
(i)
Pravno mišljenje na engleskom jeziku koje izdaje Ministarstvo pravde Zajmoprimca koje potvrđuje na zadovoljavajući način za BRSE, suštinski u obliku koji je utvrđen u Prilogu 2 ovog sporazuma, da je Sporazum uredno potpisan od strane ovlašćenih predstavnika Zajmoprimca i da je Sporazum važeći, obavezujući i izvršiv u skladu sa njegovim uslovima u jurisdikciji koja je važeća za Zajmoprimca.
(ii)
Dokaz na engleskom jeziku (na primer, statut, vladino ovlašćenje, punomoćje, itd.) na zadovoljavajući način za BRSE o licu (licima) koja su ovlašćena da potpišu Sporazum i Zahteve za isplatu u ime Zajmoprimca, zajedno sa overenim kartonom deponovanih potpisa takvog (takvih) lica;
(iii)
Potvrda od Zajmoprimca u formi datoj u Prilogu 4 ovog sporazuma, potpisanoj od strane lica ovlašćenih da potpisuju Zahteve za isplatu u ime Zajmoprimca i datirana na datum koji pada ne ranije od pet (5) Radnih dana pre Zahteva za isplatu.
b)
Uslovi koji prethode svakom sledećem Zahtevu za isplatu:
(i)
Dokaz na engleskom jeziku (na primer, statut, vladino ovlašćenje, punomoćje, itd.) na zadovoljavajući način za BRSE o licu (licima) koja su ovlašćena da potpišu Zahteve za isplatu u ime Zajmoprimca, zajedno sa overenim kartonom deponovanih potpisa takvog (takvih) lica;
(ii)
Izveštaj o napretku kojim se potvrđuje, na zadovoljavujući način za BRSE, da je 90% prethodne Tranše alocirano;
(iii)
Potvrda od Zajmoprimca u formi datoj u Prilogu 4 ovog sporazuma, potpisanoj od strane lica ovlašćenih da potpisuju Zahteve za isplatu u ime Zajmoprimca i datirana na datum koji pada ne ranije od pet (5) Radnih dana pre Zahteva za isplatu;
(iv)
Bilo koji drugi posebni uslov definisan u odeljku „Posebni uslovi“ u Prilogu 1.
Odredba4.6

Otplata

Na svaki Datum otplate glavnice, Zajmoprimac će otplatiti glavnicu svake Tranše koja je dospela za plaćanje na taj Datum otplate glavnice u skladu sa uslovima utvrđenim u primenljivom Obaveštenju o isplati.
Odredba4.7

Prevremena otplata

a)
Mehanizam
Ako u bilo kom slučaju navedenom u ovom sporazumu, a odnosi se na ovu potklauzulu, Zajmoprimac treba da izvrši prevremenu otplatu cele ili dela Tranše ili u slučaju dobrovoljne prevremene otplate, Zajmoprimac će uputiti pisano obaveštenje BRSE-u barem dva (2) meseca pre (u daljem tekstu “Obaveštenje o prevremenoj otplati”), navodeći iznose koji treba da se prevremeno otplate, datum na koji će prevremena otplata biti izvršena (u daljem tekstu “Datum prevremene otplate”) i, po prethodnoj konsultaciji sa BRSE, Troškove prevremene otplate. Datum prevremene otplate pašće na Datum plaćanja kamate, osim ako je BRSE drugačije dogovorio pisanim putem.
Nakon prijema Obaveštenja o prevremenoj otplati, BRSE će poslati pisano obaveštenje Zajmoprimcu (u daljem tekstu, “Potvrda o prevremenoj otplati”), najkasnije pet (5) Radnih dana pre Datuma prevremene otplate, ukazujući na obračunatu kamatu i na Troškove prevremene otplate u skladu sa potklauzulom 4.7 (b).
Potvrda o prevremenoj otplati koja se podudara sa svim elementima Obaveštenja o prevremenoj otplati predstavljaće neopozivu i bezuslovnu rešenost Zajmoprimca da prevremeno otplati BRSE-u relevantne iznose u skladu sa uslovima određenim u Potvrdi o prevremenoj otplati.
Ako Zajmoprimac delimično prevremeno otplati Tranšu, iznos prevremene otplate će se primenjivati proporcionalno na svaku neizmirenu otplatu glavnice. U tom slučaju, Potvrda o prevremenoj otplati će u skladu sa tim da uključi i prilagođeni otplatni plan koji će biti obavezujući po Zajmoprimca.
b)
Troškovi prevremene otplate
Troškove koji su rezultat prevremene otplate u skladu sa potklauzulom 4.7 (a) (u daljem tekstu: “Troškovi prevremene otplate”) utvrdiće BRSE na osnovu troškova koje je snosila preraspoređivanjem iznosa koji treba da se prevremeno otplati od Datuma prevremene otplate do Datuma dospeća, uključujući sve srodne troškove, kao što su i troškovi po osnovu hedžing aranžmana. Troškovi preraspoređivanja će biti ustanovljeni na osnovu razlike između prvobitne stope i stope preraspoređivanja, što će utvrditi BRSE na osnovu uslova na tržištu na datum izdavanja Obaveštenja o prevremenoj otplati.
Odredba4.8

Određivanje kamate

Zajmoprimac će platiti kamatu na glavnicu svake Tranše povremeno neizmirenoj tokom svakog Kamatnog perioda po Fiksnoj kamatnoj stopi/Varijabilnoj kamatnoj stopi utvrđenoj u primenljivom Obaveštenju o isplati.
Kamata će se (i) obračunavati od i uključujući prvi dan Kamatnog perioda do, ali isključujući poslednji dan navedenog kamatnog perioda; i (ii) dospeće za naplatu i biće naplativa na Datume plaćanja kamate određene u primenljivom Obaveštenju o isplati. Kamata će se obračunavati na osnovu Konvencije za utvrđivanje broja dana utvrđene u relevantnom Obaveštenju o isplati.
U slučaju Tranši sa Varijabilnom kamatnom stopom, BRSE će utvrđivati na svaki Datum utvrđivanja kamate, kamatnu stopu koja je primenljiva tokom relevantnog Kamatnog perioda u skladu sa Sporazumom i odmah će o tome obavestiti Zajmoprimca. Svako utvrđivanje od strane BRSE biće konačno, zaključno i obavezujuće po Zajmoprimca osim ako Zajmoprimac dokaže na zadovoljavajući način BRSE da to utvrđivanje sadrži očiglednu grešku.
Odredba4.9

Stopa zatezne kamate

U slučaju da Zajmoprimac ne uspe da plati u potpunosti ili delimično, bilo koji iznos u skladu sa Sporazumom, i uprkos bilo kojoj drugoj naknadi raspoloživoj za BRSE u skladu sa Sporazumom ili inače, Zajmoprimac će platiti kamatu na navedene neplaćene iznose od datuma dospeća do datuma prijema navedene uplate od strane BRSE po godišnjoj kamatnoj stopi jednakoj jednomesečnom EURIBOR-u kotiranom na datum dospeća plus dvesta baznih poena (200 baznih poena) (u daljem tekstu
“Stopa zatezne kamate”).
Primenljiva Stopa zatezne kamate se ažurira svakih trideset (30) kalendarskih dana.
Odredba4.10

Događaj poremećaja na tržištu

BRSE će odmah po saznanju obavestiti Zajmoprimca da je došlo do Događaja poremećaja na tržištu.
U svrhe Sporazuma, “Događaj poremećaja na tržištu” odnosi se na sledeće okolnosti:
a)
Relevantni dobavljač finansijskih vesti pod definicijom EURIBOR nije naveo bilo koju procentualnu stopu ili njegova odgovarajuća strana sa objavljenom stopom nije dostupna.
U takvom Događaju poremećaja na tržištu, primenljivi EURIBOR predstavljaće godišnju kamatnu stopu koju je utvrdila BRSE kao aritmetičku sredinu stopa pri kojima se zajmovi u evrima, u iznosu koji je identičan ili najbliže uporediv sa iznosom predmetnog zajma i za period koji je identičan ili najbliže uporediv sa relativnim Kamatnim periodom, nude na Datum utvrđivanja kamate tri (3) vodeće banke na međubankarskom tržištu EU koje je odabrala BRSE. Ako postoje barem dva (2) kotiranja, primenljivi EURIBOR za taj Datum utvrđivanja kamate predstavljaće aritmetičku sredinu datih kotiranja.
Ako je ponuđeno samo jedno (1) kotiranje ili nijedno, primenljivi EURIBOR će biti procentualna godišnja kamatna stopa koju je utvrdila BRSE kao aritmetičku sredinu stopa pri kojima se zajmovi u evrima, u iznosu koji je identičan ili najbliže uporediv sa iznosom predmetnog zajma i za period koji je identičan ili najbliže uporediv sa relativnim Kamatnim periodom, daju na drugi Radni dan nakon početka relevantnog Kamatnog perioda od strane vodećih banaka na međubankarskom tržištu EU koje je odabrala BRSE.
b)
BRSE odlučuje da nije moguće da se utvrdi primenljiva Referentna kamatna stopa u skladu sa stavom (a) u tekstu iznad.
Tokom takvog Događaja poremećaja na tržištu, primenljiva Varijabilna kamatna stopa će biti zamenjena stopom koja izražava kao procentualnu godišnju kamatnu stopu trošak BRSE za finansiranje Zajma bez obzira na to koji izvor BRSE može opravdano odabrati.
c)
U svakom trenutku između isporuke Obaveštenja o isplati i Datuma isplate, BRSE opravdano utvrđuje da li postoje izuzetne i neočekivane okolnosti ekonomske, finansijske, političke ili druge spoljne prirode koje na negativan način utiču na pristup BRSE svojim izvorima finansiranja.
Tokom takvog Događaja poremećaja na tržištu, BRSE će imati pravo da otkaže bez naplate bilo kakvih troškova predviđenu isplatu.
U slučaju Događaja poremećaja na tržištu utvrđenih u stavovima (a) i (b) u tekstu iznad:
i)
Ako Zajmoprimac to zahteva, Strane, delujući u dobroj veri, stupaju u pregovore u periodu ne dužem od 30 (trideset) kalendarskih dana da bi se dogovorile o alternativi za primenljivi EURIBOR. Ako ne dođe do dogovora, Zajmoprimac će da nastavi sa prevremenom otplatom na sledeći Datum isplate kamate pod uslovima definisanim u potklauzuli 4.7.
ii)
BRSE ima pravo, delujući u dobroj veri i konsultujući se sa Zajmoprimcem u meri koja je razumno izvodljiva, da promeni trajanje sledećeg Kamatnog perioda na trideset (30) kalendarskih dana ili manje tako što će Zajmoprimcu da pošalje obaveštenje o tome. Svaka takva promena Kamatnog perioda će postati važeća na datum koji je definisala BRSE u navedenom obaveštenju.
iii)
Da bi se izbegla bilo kakva sumnja, stavke (i) i (ii) iznad će se odnositi samo na okolnosti kada Zajmoprimac plaća kamatu na glavnicu neotplaćene Tranše po Varijabilnoj kamatnoj stopi.
Ako BRSE utvrdi da relevantni Događaj poremećaja na tržištu više ne postoji, onda, zavisno od bilo kog sledećeg Događaja poremećaja na tržištu do koga dođe ili koji postoji, Varijabilna kamatna stopa i/ili Kamatni period koji su primenljivi na relevatnu Tranšu će se vratiti na staro, od prvog dana sledećeg Kamatnog perioda do obračuna u skladu sa Varijabilnom kamatnom stopom i Kamatnog perioda utvrđenog u relevantnom Obaveštenju o isplati.
Odredba4.11

Isplate

Svi iznosi koje Zajmoprimac treba da isplati u skladu sa ovim sporazumom su naplativi u Valuti pojedinačne Tranše na račun BRSE koji je naznačen u primenljivom Obaveštenju o isplati. Svako plaćanje u skladu sa ovim sporazumom vršiće se na Radni dan koji podleže Konvenciji o modifikovanom narednom radnom danu. Smatraće se da su isplate izvršene kada se relevatni iznos nađe na računu BRSE.
Zajmoprimac ili Banka po instrukciji Zajmoprimca, zavisno od slučaja, šalje pisano obaveštenje o plaćanju BRSE barem pet (5) Radnih dana pre plaćanja bilo kog iznosa koji dospeva na naplatu u skladu sa ovim sporazumom.
Sve isplate koje će Zajmoprimac izvršiti prema ovom sporazumu će se izračunavati i izvršiti bez (i oslobođene od bilo kakvog odbitka za) poravnanja ili protivtužbe. Ako BRSE primi uplatu koja je nedovoljna za isplatu svih dospelih i naplativih iznosa od strane Zajmoprimca prema ovom sporazumu, BRSE će primeniti tu uplatu na ili prema plaćanju:
i)
prvo, bilo kojih naknada, troškova, taksi ili izdataka dospelih, ali neplaćenih po ovom sporazumu;
ii)
drugo, bilo koja obračunata kamata, dospela, ali neplaćena po ovom sporazumu;
iii)
treće, bilo koja glavnica dospela, ali neplaćena po ovom sporazumu; i
iv)
četvrto, bilo koji drugi iznos dospeo, ali neplaćen po ovom sporazumu.
5.Čl. 5.1–5.9

SPROVOĐENjE PROJEKTA

UvodUvod
Zajmoprimac će sprovesti Projekat u skladu sa Sporazumom.
Zajmoprimac imenuje Ministarstvo za javna ulaganja za TSP. Zajmoprimac će omogućiti da TSP imenuje Jedinicu za implementaciju projekta (JIP) sa odgovarajućim osobljem i opremom tokom celokupnog sprovođenja Projekta.
U svakom slučaju, Zajmoprimac ostaje jedini odgovoran za usklađivanje sa obavezama u skladu sa Sporazumom.
Neuspeh da se ispoštuju obaveze utvrđene ovim sporazumom u skladu sa ovom predstavljao bi, bez obzira na bilo koju drugu primenljivu odredbu Propisa o zajmu, događaj u smislu člana 3.3 (h) Propisa o zajmu i može dovesti do (i) relevantnog troška ugovora proglašenog neprihvatljivim za Alokaciju prema Projektu; i/ili (ii) do prevremene otplate, obustave ili otkaza Zajma, u celosti ili delimično, u skladu sa uslovima članova 3.3 (Prevremena otplata isplaćenih zajmova), 3.5 (Obustava neisplaćenih zajmova od strane Banke) i 3.6 (Otkazivanje od strane Banke isplate neisplaćenih zajmova) Propisa o zajmu.
Odredba5.1

Obavezna briga

Zajmoprimac će pokazati maksimalnu brigu i pažnju, i primeniće sva uobičajeno korišćena sredstva (uključujući, ali se ne ograničavajući na pravna, finansijska, menadžerska i tehnička) potrebna za valjanu implementaciju Projekta.
Odredba5.2

Period alokacije

Zajmoprimac će alocirati svaku Tranšu na Projekat u okviru dvanaest (12) meseci od relevantnog Datuma isplate (u daljem tekstu “Period alokacije”), osim ukoliko se drugačije ne dogovore Zajmoprimac i BRSE pismenim putem. Ako Tranša koju je isplatila BRSE nije dodeljena Projektu ili mu je dodeljena delimično tokom Perioda alokacije, Zajmoprimac će izvršiti prevremenu otplatu nealociranih iznosa na sledeći Datum plaćanja kamate u skladu uslovima u potklauzuli 4.7, osim ukoliko se drugačije ne dogovore Zajmoprimac i BRSE.
Odredba5.3

Troškovi projekta

Tranše isplaćene u vezi sa Inicijalnim zajmom i Zajmom neće prekoračiti pedeset pet procenata (55%) ukupnih kvalifikovanih troškova Projekta određenih u Prilogu 1 ovog sporazuma. Ako Tranše isplaćene u vezi sa Inicijalnim zajmom i Zajmom prekorače gore pomenutih 55% (umanjenjem ukupnih kvalifikovanih troškova ili na drugi način), Zajmoprimac će izvršiti prevremenu otplatu viška na sledeći Datum plaćanja kamate u skladu sa uslovima u potklauzuli 4.7. Ukoliko se ukupni kvalifikovani troškovi Projekta povećaju ili se revidiraju iz bilo kog razloga, Zajmoprimac će omogućiti da dodatna finansijska sredstva za okončanje Projekta budu raspoloživa bez obraćanja BRSE. Planovi da se povećani troškovi finansiraju biće saopšteni BRSE bez odlaganja.
Odredba5.4

Posebne obaveze po Projektu

Zajmoprimac će se postarati da:
i)
celokupno zemljište, imovinska prava, kao i sve dozvole potrebne za sprovođenje Projekta budu blagovremeno obezbeđene;
ii)
sva imovina i postrojenja koja predstavljaju deo ovog Projekta moraju biti trajno osigurani, održavani i operativni u skladu sa najboljom međunarodnom praksom; i
iii)
bude ispunjen bilo koji drugi zahtev naveden u Dodatku 1 (“Posebni uslovi“) ovog sporazuma.
Odredba5.5

Nabavka

Nabavka radova, roba i usluga koji treba da se finansiraju u skladu sa Projektom biće usaglašena sa Smernicama o nabavkama.
Odredba5.6

Mere zaštite u oblasti životne sredine i socijalne mere zaštite

Zajmoprimac će, putem TSP, sprovoditi Projekat u skladu sa zahtevima utvrđenim u Politici o merama zaštite u oblasti životne sredine i socijalnim merama zaštite.
Odredba5.7

Ljudska prava

Zajmoprimac će, putem TSP, obezbediti da sprovođenje Projekta ne dovede do kršenja (i) Evropske konvencije o ljudskim pravima; ili (ii) Evropske socijalne povelje.
Odredba5.8

Integritet

Zajmoprimac garantuje da:
(a) će uspostaviti i nakon toga se pridržavati unutrašnjih politika, postupaka i
kontrola, u skladu sa važećim zakonodavstvom i najboljom međunarodnom
praksom, u svrhu sprečavanja da Zajmoprimac postane, u vezi sa
sprovođenjem Projekta ili na drugi način, instrument za pranje novca ili
finansiranje terorizma
← Pomerite tabelu levo/desno za više detalja →
;
b)
ne učini dostupnim sredstva Zajma za ili u korist bilo kog Sankcionisanog lica, direktno ili indirektno;
(c) se neće obavezati i da nijedno lice, uz njegovu saglasnost ili prethodno
znanje, neće počiniti, u vezi sa sprovođenjem Projekta ili bilo kog Potprojekta,
podmićivanje, obmanjivanje, prinudu, tajno dogovaranje ili opstrukciju (u
daljem tekstu, zajedno sa pranjem novca, finansiranjem terorizma i
stavljanjem na raspolaganje sredstava Zajma Sankcionisanim licima koji se
naziva „Zabranjena delovanja“).
← Pomerite tabelu levo/desno za više detalja →
U smislu ovog sporazuma:
i)
„Podmićivanje“ predstavlja svako nuđenje, davanje, primanje ili traženje, bilo direktno ili indirektno, neke vrednosti radi neodgovarajućeg uticaja na postupanje neke druge strane.
ii)
„Obmanjivanje“ predstavlja svako činjenje ili nečinjenje, uključujući pogrešne tvrdnje, kojima se svesno ili nesvesno vrši obmana, ili se čini pokušaj obmanjivanja jedne strane da bi se stekla neka finansijska ili druga korist ili izbegla neka obaveza.
iii)
„Prinuda“ predstavlja svako ugrožavanje ili nanošenje štete ili pretnja ugrožavanjem ili nanošenjem štete, direktno ili indirektno, nekoj strani ili imovini te strane u cilju neprikladnog uticaja na njeno postupanje.
iv)
„Tajno dogovaranje“ predstavlja svaki dogovor između dve ili više strana sa ciljem da se ostvari neki neprikladan cilj, uključujući neprikladno uticanje na postupanje druge strane.
v)
„Opstrukcija“ znači, u vezi sa istragom Prinude, Tajnog dogovaranja, Podmićivanja ili Obmanjivanja, (a) svako delo namernog uništavanja, falsifikovanja, promene ili prikrivanja dokaznog materijala u istrazi; (b) bilo koji čin pretnje, uznemiravanja ili zastrašivanja bilo koje strane kako bi se sprečilo da obelodani svoje znanje o pitanjima relevantnim za istragu ili da nastavi istragu; i/ili (c) bilo koji akt kojim se namerava materijalno ometanje vršenja ugovornih prava revizije ili pristupa informacijama.
Zajmoprimac se obavezuje da obavesti BRSE ako sazna za bilo koju činjenicu ili informaciju koje ukazuju na to da je počinjeno neko od ovih Zabranjenih delovanja. U tu svrhu, saznanje nekog člana TSP smatraće se saznanjem Zajmoprimca.
Zajmoprimac se obavezuje:
i)
da na vreme preduzme one mere koje BRSE bude opravdano zahtevala da istraži i/ili prekine svaki navodni ili stvarni čin Zabranjenog delovanja;
ii)
da omogući svaku istragu koju može da vrši BRSE u vezi sa navodnim ili stvarnim Zabranjenim delovanjem; i
iii)
da obavesti BRSE o merama koje su preduzete da se zatraži odšteta od lica koja su odgovorna za bilo koji gubitak koji proističe iz takvog čina Zabranjenog delovanja.
Vođa TSP će biti odgovoran za kontakte sa BRSE u svrhu ove potklauzule.
Odredba5.9

Transparentnost

Zajmoprimac će naznačiti Krajnjim korisnicima da je Projekat delimično finansiran sredstvima BRSE putem odgovarajućih sredstava komunikacije, uključujući vebsajtove, društvene mreže, izjave za štampu, brošure odnosno bilborde/table na odgovarajućim lokacijama projekata. U svakom slučaju, informacije za Krajnje korisnike prikazivaće BRSE naziv i logo na prikladan način.
6.Čl. 6.1–6.6

PRAĆENjE

Odredba6.1

Izveštavanje

a)
Izveštaj o napretku
Zajmoprimac će, preko TSP, slati BRSE izveštaj o napretku (u daljem tekstu “Izveštaj o napretku”) (i) jednom godišnje, do završetka Projekta; i (ii) pre svakog Zahteva za isplatu, izuzev kod Zahteva za isplatu prve Tranše.
U Prilogu 5 ovog sporazuma, nalazi se primer kojim se utvrđuju minimalne informacije potrebne BRSE. Alternativni formati koji sadrže istu vrstu informacija se takođe mogu koristiti.
b)
Završni izveštaj
Nakon završetka Projekta, Zajmoprimac će kroz TSP predati izveštaj o završetku projekta (u daljem tekstu “Završni izveštaj”) koji sadrži ocenu socijalnih efekata Projekta. Prilog 5 ovog sporazuma sadrži primer kojim se utvrđuju minimalni podaci koje BRSE zahteva. Alternativni formati koji sadrže iste podatke se takođe mogu koristiti.
Strane su ovim izričito saglasne da Zajmoprimac ne mora da podnese Završni izveštaj u skladu sa podklauzulom 6.1 (b) (Izveštaj o završetku projekta) Inicijalnog okvirnog sporazuma o zajmu.
Odredba6.2

Posete

Zajmoprimac se obavezuje da prihvati posete praćenja/tehničke posete/procenjivanje, uključujući olakšavanje pristupa relevantnim lokacijama Projekta/izvođačima, koje vrše zaposleni BRSE ili imenovana treća lica.
Odredba6.3

Revizija

Ako se Zajmoprimac ne usaglasi sa bilo kojom od obaveza u skladu sa Sporazumom, Zajmoprimac se obavezuje da prihvati reviziju na lokaciji, koju vrše zaspoleni BRSE ili imenovana treća lica, što će biti na teret Zajmoprimca.
Odredba6.4

Informacije o projektu

Zajmoprimac će voditi računovodstvenu evidenciju za Projekat u skladu sa međunarodnim standardima, iz koje će se u svakom trenutku videti stanje napredovanja Projekta, i koja će evidentirati sve obavljene poslove, i utvrditi sredstva i usluge koji se delimično finansiraju iz Zajma.
Zajmoprimac će, preko TSP, isporučiti BRSE blagovremeno sve podatke ili dokumenta koja se tiču finansiranja ili sprovođenja (uključujući posebno pitanja zaštite životne sredine/socijalna pitanja i nabavki) Projekta što BRSE može opravdano zahtevati.
Zajmoprimac će odmah kroz TSP obavestiti BRSE o bilo kojem događaju u vezi sa Projektom, uključujući, ali se ne ograničavajući na:
i)
svaki postupak ili protest koji je započet ili prigovor koji je podignut od strane trećeg lica ili bilo koja žalba koju je primio Zajmoprimac ili sudski spor koji je započet ili se njime preti u pogledu nabavke ili socijalnih ili pitanja zaštite životne sredine ili pitanja zdravlja i bezbednosti na radu (npr. gubitak života ili važna nesreća) ili druga pitanja u vezi sa Projektom; ili
ii)
svako donošenje zakona ili izmene i dopune zakona, propisa ili pravila (ili u primeni ili zvaničnom tumačenju bilo kog zakona, propisa ili pravila) u vezi sa Projektom.
Svaki događaj koji može imati Materijalno negativnu promenu po sprovođenje Projekta bi predstavljao događaj u smislu člana 3.3 (h) Propisa o zajmu i može dovesti do prevremene otplate, obustave ili otkaza zajma u skladu sa uslovima članova 3.3 (Prevremena otplata isplaćenih zajmova), 3.5 (Obustava neisplaćenih zajmova od strane Banke) i 3.6 (Otkazivanje od strane Banke isplate neisplaćenih zajmova) Propisa o zajmu.
Odredba6.5

Podaci o Zajmoprimcu

Zajmoprimac će, direktno ili kroz TSP, obavestiti BRSE o svakoj Materijalno negativnoj promeni odmah nakon što postane svestan da se ona desila. Svaka Materijalno negativna promena bi predstavljala događaj u smislu člana 3.3 (h) Propisa o zajmu i može dovesti do prevremene otpate, obustave ili otkaza Zajma u skladu sa uslovima članova 3.3 (Prevremena otplata isplaćenih zajmova), 3.5 (Obustava neisplaćenih zajmova od strane Banke) i 3.6 (Otkazivanje od strane Banke isplate neisplaćenih zajmova) Propisa o zajmu.
Odredba6.6

Finansijske odredbe

a)
Neizvršenje obaveza
Zajmoprimac će obavestiti BRSE ukoliko se desi bilo koji Događaj neizvršenja obaveza. Bilo koji Događaj neizvršenja obaveza će predstavljati događaj u smislu člana 3.3 (h) Propisa o zajmu i može dovesti do obustave, otkaza ili prevremene otplate Zajma u skladu sa uslovima članova 3.3 (Prevremena otplata isplaćenih zajmova), 3.5 (Obustava neisplaćenih zajmova od strane Banke) i 3.6 (Otkazivanje od strane Banke isplate neisplaćenih zajmova) Propisa o zajmu.
U smislu ovog sporazuma, “Događaj neizvršenja obaveza“ označava situaciju u kojoj se, nakon bilo kog neizvršenja obaveza, od Zajmoprimca zahteva ili je moguće zahtevati ili će se, nakon isteka primenljivog ugovornog perioda počeka, zahtevati ili biti u mogućnosti da se zahteva da prevremeno otplati, otplati ili raskine pre dospeća svaki Instrument zaduživanja ili je bilo koja obaveza koja je u vezi sa Instrumentom zaduživanja raskinuta ili obustavljena.
7.Čl. 7.1–7.4

PARI PASSU

UvodUvod
Neuspeh usaglašavanja sa odredbama navedenim pod predstavljao bi događaj u smislu člana 3.3 (h) Propisa o zajmu i može dovesti do prevremene otplate, obustave ili otkaza zajma u skladu sa uslovima iz članova 3.3 (Prevremena otplata isplaćenih zajmova), 3.5 (Obustava neisplaćenih zajmova od strane Banke) i 3.6 (Otkazivanje od strane Banke isplate neisplaćenih zajmova) Propisa o zajmu.
Odredba7.1

Rangiranje

Zajmoprimac će obezbediti da njegove obaveze plaćanja u skladu sa ovim sporazumom jesu i biće najmanje u rangu pari passu u pravu plaćanja sa svim drugim tekućim i budućim neobezbeđenim i nepodređenim obavezama prema bilo kojim njegovim Instrumentima zaduživanja.
Posebno, Zajmoprimac neće izvršiti (ili odobriti) bilo koje plaćanje u vezi sa bilo kojim takvim Instrumentom zaduživanja (bez obzira da li se redovno zakazuje ili ne) ako:
i)
BRSE zatraži prevremenu otplatu u skladu sa članom 3.3 Propisa o zajmu; ili
ii)
je došlo do ili se nastavlja događaj ili potencijalni događaj neizvršenja obaveza u pogledu neobezbeđenih i podređenih Instrumenata zaduženja Zajmoprimca ili neke od njegovih agencija ili državnih organa.
Međutim, isplata u pogledu na navedeni Instrument zaduženja je moguća ako Zajmoprimac:
i)
plaća istovremeno; ili
ii)
odvaja sa strane na namenski račun za plaćanje na sledeći Datum plaćanja kamate
sumu koja je jednaka istom odnosu neizmirene glavnice u skladu sa ovim sporazumom kao što je odnos koji plaćanje pod takvim Instrumentom zaduživanja nosi prema ukupnom neizmirenom dugu prema tom instrumentu.
U tu svrhu, bilo koje plaćanje Instrumenta zaduživanja koje se vrši iz sredstava dobijenih emitovanjem drugog instrumenta, na koja su se prevashodno pretplatila ista lica koja imaju potraživanja po Instrumentu zaduživanja, se zanemaruje.
Odredba7.2

Sredstvo obezbeđenja

Ukoliko se odobri Sredstvo obezbeđenja za izvršenje bilo kog Instrumenta zaduživanja Zajmoprimca, Zajmoprimac će blagovremeno obavestiti BRSE o svojim namerama, i ako to BRSE zahteva, dostaviće BRSE u okviru roka koji je definisan u obaveštenju BRSE, identično ili ekvivalentno Sredstvo obezbeđenja za izvršenje svojih finansijskih obaveza u skladu sa ovim sporazumom.
Ova odredba se neće primenjivati na Sredstvo obezbeđenja:
a)
nastalo na svojini u trenutku kupovine jedino kao zalog za plaćanje kupoprodajne cene ili za otplatu duga nastalog u svrhu finansiranja kupovine navedene svojine; ili
b)
koje obezbeđuje Instrument zaduživanja čije dospeće pada najkasnije jednu
(1)
godinu nakon datuma na koji je prvobitno nastao.
Odredba7.3

Klauzula koja se naknadno unosi

Ako bilo koji od Instrumenata zaduživanja Zajmoprimca uključuje klauzule o gubitku rejtinga, finansijskim pokazateljima ili pari passu odredbama koje nisu sastavni deo Sporazuma ili su strože od bilo koje ekvivalentne odredbe ovog sporazuma, Zajmoprimac o tome obaveštava BRSE i, na njen zahtev u formi pisanog obaveštenja, u roku navedenom u BRSE obaveštenju, izvršava izmenu i dopunu ovog sporazuma kako bi obezbedio ekvivalentnu odredbu u korist BRSE.
Odredba7.4

Prevremena otplata trećim licima

Ako Zajmoprimac dobrovoljno prevremeno otplati (radi izbegavanja sumnje, prevremena otplata uključuje ponovni otkup tamo gde je to primenljivo), u celosti ili delimično, bilo koji Instrument zaduživanja, i takva prevremena otplata:
i)
nije izvršena u okviru revolving kredita koji ostaje otvoren za povlačenje pod istim uslovima nakon takve prevremene otplate; ili
ii)
nije učinjena sredstvima drugog Instrumenta zaduživanja čiji je rok najmanje jednak neisteklom roku prevremeno otplaćenog Instrumenta zaduživanja,
Zajmoprimac će obavestiti BRSE. U tom slučaju, i na zahtev BRSE-a, Zajmoprimac će izvršiti prevremenu otplatu BRSE-u u roku od dva (2) meseca od bilo koje takve prevremene otplate, iznose isplaćene po Zajmu u skladu sa potklauzulom 4.7 u proporciji u kojoj prevremeni iznos otplate nosi u odgovarajućem Instrumentu zaduživanja.
UvodUvod
Zajmoprimac izjavljuje i garantuje:
(a)
obavlja svoje poslovanje u skladu sa zakonima, uredbama, propisima, statutima i drugim dokumentima koji se na njega primenjuju; posebno, poštuje važeće zakone o prevari, korupciji, pranju novca i finansiranju terorizma;
(b)
da nije i da nijedan od njegovih službenika, direktora, agenata ili zaposlenih Sankcionisano lice ili predmet pravosnažne i neopozive sudske presude u vezi sa Zabranjenim delovanjem počinjenim u vršenju svojih profesionalnih dužnosti, a niko od njih nije niti je stupio u poslovne odnose sa Sankcionisanim licima;
(c)
da su ga nadležni organi ovlastili da zaključuje Sporazum i da su potpisniku(cima) dali ovlašćenje za to, u skladu sa zakonima, uredbama, propisima i drugim dokumentima koji se na njih primenjuju;
(d)
da potpisivanjem i njegovim uručivanjem, izvršenjem svojih obaveza prema i u saglasnosti sa ovim sporazumom ne:
(i)
krši niti je u sukobu sa bilo kojim merodavnim zakonom, statutom, pravilom ili propisom, ili bilo kojom presudom, rešenjem ili dozvolom čiji je on predmet;
(ii) ne krši niti je u sukobu sa bilo kojim Instrumentom zaduženja ili drugim sporazumom obavezujućim po njega, za koji se opravdano može očekivati da može dovesti do Materijalno negativne promene;
(e)
da ne postoji nijedan događaj ili okolnost koja je nerešena, a koja predstavlja neizvršenje obaveza iz nekog Instrumenta zaduživanja ili drugog sporazuma, koji je obavezujući za njega ili čiji je predmet njegova imovina, od kojeg bi se opravdano moglo očekivati da izazove Materijalno negativnu promenu;
(f)
da trećem licu nije odobreno nikakvo Sredstvo obezbeđenja zbog kršenja potklauzule 7.2;
(g)
nikakva parnica, arbitraža ili administrativni postupak pred nekim sudom, arbitražnim sudom ili agencijom, a od kog bi se opravdano moglo očekivati da ima za rezultat Materijalno negativnu promenu (po njegovom najboljem saznanju i verovanju) nije započet niti se očekuje protiv njega; i
(h)
da je dobio primerak Propisa o zajmu, Kreditne politike, Politike o zaštiti životne sredine i merama socijalne zaštite, Smernica o nabavkama i Pravilnika o zaštiti ličnih podataka, i da ih je uzeo u obzir.
Gorepomenute izjave i garancije smatraju se ponovljenim na datum potpisivanja svakog Zahteva za isplatu, kao i na datum svake Potvrde. O svakoj promeni u vezi sa gorenavedenim izjavama i garancijama mora se, u kompletnom periodu Zajma, izveštavati i sva propratna dokumentacija mora se odmah dostaviti BRSE-u, nakon što Zajmoprimac postane svestan promene.
Ako je bilo koja od gorenavedenih izjava i garancija netačna ili se ispostavi da je bila netačna ili obmanjujuća u bilo kom pogledu, to bi predstavljalo događaj u smislu člana 3.3 (h) Propisa o zajmu i može da dovede do obustave, poništenja ili prevremene otplate Zajma u skladu sa članom 3.3 (Prevremena otplata isplaćenih kredita), 3.5 (Obustava neisplaćenih kredita od strane Banke) i 3.6 (Otkazivanje od strane Banke isplate neisplaćenih zajmova) Propisa o zajmu.
UvodUvod
Zajmoprimac ne može pokrenuti nijedno pitanje vezano, u okviru korišćenja Zajma, za njegove odnose sa trećim licima kako bi izbegao ispunjavanje, bilo u celini ili delimično, obaveza koje nastaju po osnovu ovog sporazuma.
BRSE se ne može uključivati u sporove koji bi mogli nastati između Zajmoprimca i trećih lica i u troškove, bilo kakve prirode, koje načini BRSE vezano za bilo koja potraživanja, a naročito sve pravne ili sudske troškove koje će snositi Zajmoprimac.
UvodUvod
Ni u kom slučaju, uključujući kašnjenje ili delimično izvršenje, ne sme se pretpostaviti da se BRSE prećutno odrekao bilo kojeg prava koje mu daje Sporazum.
UvodUvod
Zajmoprimac ne može preneti bilo koja od svojih prava i/ili obaveza iz Sporazuma bez prethodne pisane saglasnosti BRSE-a.
Zajmoprimac ovim putem daje saglasnost na svaki prenos od strane BRSE-a svih ili dela svojih prava i/ili obaveza prema Sporazumu.
UvodUvod
Ukoliko jeste ili postane nezakonito za BRSE u bilo kojoj jurisdikciji da daje, održava ili obezbeđuje sredstva za Zajam ili izvršava bilo koju od svojih obaveza prema ovom sporazumu, to bi predstavljalo događaj u smislu člana 3.3 (h) Propisa o zajmu i može da dovede do obustave, poništenja ili prevremene otplate Zajma u skladu sa članom 3.3 (Prevremena otplata isplaćenih kredita), 3.5 (Obustava neisplaćenih kredita od strane Banke) i 3.6 (Otkazivanje od strane Banke isplate neisplaćenih zajmova) Propisa o zajmu.
UvodUvod
Svaka Strana ovim potvrđuje da svaka primenjiva pravna norma prema kojoj Strana može zahtevati od druge Strane da ponovo pregovara o Sporazumu ili može prestati da izvršava svoje obaveze u slučaju promene okolnosti koje se nisu mogle predvideti u vreme zaključenja Sporazuma, što čini izvršenje preterano naporno za Stranu koja se nije složila da preuzme takav rizik, neće se primenjivati na nju u pogledu njenih obaveza ovde navedenih i neće imati pravo na bilo kakvu žalbu prema takvoj pravnoj normi. Kako bi se izbegla sumnja, ova klauzula ne isključuje bilo koje drugo primenjivo pravno ili ugovorno pravo prema Sporazumu za Stranu da prestane da izvršava svoje obaveze, ovde navedene, u pogledu sprovođenja Projekta ili raskida Sporazuma.
UvodUvod
Sporazum se reguliše pravilima BRSE kako je to utvrđeno u odredbama , stav 3, Trećeg Protokola (od 6. marta 1959. godine) uz Opšti Sporazum o povlasticama i imunitetu Saveta Evrope (od 2. septembra 1949. godine) i, drugo, ako je potrebno, francuskim pravom.
UvodUvod
Sporovi između Strana u Sporazumu predmet su arbitraže u skladu sa uslovima utvrđenim u poglavlju 4 Propisa o zajmu.
Strane su saglasne da neće koristiti bilo koju privilegiju, imunitet ili zakon pred sudskim ili nekim drugim organom, bilo domaćem ili inostranom, kako bi stavile prigovor na sprovođenje odluke donesene pod uslovima utvrđenim u poglavlju 4 Propisa o zajmu.
U svakoj pravnoj radnji koja proistekne iz ovog sporazuma, BRSE potvrda što se tiče bilo kog dospelog iznosa ili važeće kamatne stope u skladu sa Sporazumom, u odsustvu očigledne greške, biće prima facie dokaz tog iznosa ili kamatne stope.
UvodUvod
Obradu bilo kakvih ličnih podataka prikupljenih prema Sporazumu vrši BRSE u skladu sa Pravilnikom o zaštiti podataka.
UvodUvod
Svako obaveštenje (uključujući bilo koji dokument ili komunikaciju) koje će se dati ili je sačinjeno prema ili u vezi sa ovim sporazumom BRSE-u ili Zajmoprimcu, mora biti u pisanom obliku i, ukoliko nije drugačije naznačeno, može se uputiti preporučenim pismom, elektronskom poštom ili faksom. Smatraće se da je takvo obaveštenje primila druga Strana:
(i)
u slučaju ručno dostavljenog ili preporučenog pisma, na datum isporuke;
(ii) u slučaju elektronske pošte, samo kada je stvarno primljena u čitljivom obliku i samo ako je naslovljena na način koji će druga Strana odrediti za tu svrhu; i
(iii) u slučaju elektronske pošte, koja sadrži Obaveštenje o isplati, koje je BRSE poslala Zajmoprimcu, kada je elektronska pošta poslata.
Svako obaveštenje koje Zajmoprimac dostavlja BRSE-u elektronskom poštom:
(i)
u predmetu će navesti referencu LD; i
(ii) biće u obliku elektronske slike obaveštenja koja se ne može uređivati (pdf, tif ili bilo koji drugi uobičajeni format dokumenta koji se ne može uređivati o kojem su se Strane dogovorile) potpisano od strane lica koja su valjano ovlašćena za potpisivanje takvog obaveštenja u ime Zajmoprimca, priloženo uz elektronsku poštu.
Bez uticaja na validnost obaveštenja putem elektronske pošte ili faksa u skladu sa ovom klauzulom, sledeća obaveštenja takođe će se preporučenim pismom poslati drugoj Strani najkasnije odmah sledećeg Radnog dana:
(i)
Zahtevi za isplatu;
(ii) bilo koju komunikaciju u vezi sa suspenzijom, otkazivanjem i/ili prevremenom otplatom, Zajma ili u vezi sa Obaveštenjem o prevremenoj otplati; i
(iii) bilo koju drugu komunikaciju koju zahteva BRSE.
Strane su saglasne da je svako obaveštenje iznad (uključujući i elektronsku poštu) prihvaćeni oblik komunikacije, predstavljaće prihvatljiv dokaz na sudu i imaće istu dokaznu vrednost kao i predmetni sporazum.
Poštanska adresa i adresa elektronske pošte (i odeljenje ili službenik, ako postoji, na koga treba nasloviti komunikaciju) svake Strane za bilo koju komunikaciju koja se čini ili vrši prema ili u vezi sa ovim sporazumom je:
Za Zajmoprimca:
Ministarstvo finansija Republike Srbije
Kneza Miloša 20
11000 Beograd
Srbija
Na pažnju: Ministar finansija
Email: kabinet@mfin.gov.rs/uprava@javnidug.gov.rs
Za BRSE: Council of Europe Development Bank 55 Avenue Kléber 75116 Paris France
Na pažnju: Šef Odeljenja za projekte
Email: projects@coebank.org
BRSE i Zajmoprimac će odmah pisanim putem obavestiti drugu Stranu o svakoj promeni u njihovim detaljima za komunikaciju.
Sva obaveštenja koja se dostavljaju ili su sačinjena prema ili u vezi sa Sporazumom biće na engleskom ili francuskom jeziku ili na drugom jeziku, u kom slučaju će biti dostavljena uz overeni prevod na engleski ili francuski jezik, u slučaju kada to BRSE zahteva.
Sva obaveštenja koja se dostavljaju ili su sačinjena prema ili u vezi sa ovim sporazumom će, kada to BRSE zahteva, biti dostavljena BRSE-u zajedno sa zadovoljavajućim dokazom o ovlašćenju lica ili više njih ovlašćenih za potpisivanje takvog obaveštenja u ime Zajmoprimca, kao i karton deponovanih potpisa takvog lica ili više njih.
UvodUvod
Zajmoprimac će plaćati, u meri u kojoj je primenljivo, sve poreze, obaveze, takse i ostale namete bilo kakve prirode, uključujući taksene marke i naknade za registraciju, koje nastanu iz potpisivanja, registracije, implementacije, raskida ili sprovođenja Sporazuma i/ili nekog povezanog dokumenta, kao i iz stvaranja, poboljšanja, registracije, izvršenja ili davanja bilo kojeg Sredstva obezbeđenja koji se zahtevaju prema Sporazumu.
Zajmoprimac snosi sve naknade i troškove (uključujući pravne, stručne, bankarske ili menjačke troškove) nastale u vezi sa (i) pripremom, potpisivanjem, poboljšanjem, implementacijom, raskidom ili sprovođenjem ovog sporazuma i/ili nekog povezanog dokumenta; (ii) bilo kojom izmenom, dopunom ili odricanjem u pogledu ovog sporazuma i/ili nekog povezanog dokumenta; i (iii) pripremom, potpisivanjem, poboljšanjem, upravljanjem, sprovođenjem i davanjem bilo kog Sredstva obezbeđenja koje se zahteva u skladu sa Sporazumom.
Bez obzira na gorenavedeno, (Troškovi arbitraže) Propisa o zajmu se primenjuje u vezi sa troškovima arbitraže koji su utvrđeni u (Sporovi).
UvodUvod
Nakon otplate ukupnog iznosa neotplaćene glavnice prema Zajmu, kao i plaćanja svih kamata i drugih troškova koji proističu u skladu sa Sporazumom, uključujući naročito one iznose iz potklauzule 4.9 (Stopa zatezne kamate) i (Porezi i rashodi), Zajmoprimac će biti u potpunosti oslobođen svojih obaveza koje proističu iz ili u vezi sa Sporazumom.
Bez obzira na gore navedeno, Zajmoprimac će se ipak obavezati da, u periodu koji nije duži od šest (6) godina nakon prijema Završnog izveštaja na zadovoljavajući način za BRSE potvrđuje potpunu alokaciju svih iznosa isplaćenih prema Zajmu (i) čuva projektnu dokumentaciju; i (ii) rado prima bilo kakve evaluacione posete, uključujući omogućavanje pristupa relevantnim lokacijama Projekta koje obavljaju zaposleni u BRSE-u ili imenovane treće strane.
UvodUvod
Sporazum stupa na snagu nakon što ga strane potpišu i Narodna skupština Republike Srbije ga ratifikuje uz odgovarajuću pisanu potvrdu koju je BRSE dobila od Zajmoprimca.
PriloziPrilozi
U POTVRDU TOGA, Strane su učinile da Sporazum bude potpisan u četiri (4) primerka, od kojih je svaki jednako važeći. Jedan (1) primerak zadržava BRSE, a tri
(3) Zajmoprimac.
Za Zajmoprimca
Beograd, dana 29. oktobar 2025. godine
__________________________
Ime: Siniša Mali
Titula: Prvi potpredsednik Vlade i ministar finansija
Za BRSE
Pariz, dana 24. oktobar 2025. godine
___________________________ ___________________________
Ime: g-din Rainer LOVATO Ime: Andrea BUCCOMINO
Titula: OiR, Šef Odeljenja za projekte Titula: Zamenik generalnog savetnika
PRILOG 1
Opis projekta
LD2009 ADD 1 (2025)
ZajmoprimacRepublika Srbija
Tip zajmaProjektni zajam
Ukupan iznos
zajma
EUR 104.000.000 koji se sastoji od:
Početnog zajma u ukupnom maksimalnom iznosu od 54.000.000 evra
Zajam u ukupnom maksimalnom iznosu od 50.000.000 evra
Odobrenje
Administrativno

g saveta BRSE
1. oktobar 2025. godine
← Pomerite tabelu levo/desno za više detalja →
I.
Sektor(i)
delovanja
Zdravstvo i socijalna zaštita
Planirani radovi
/ Pod-projekti
Izgradnja novog objekta Univerzitetske dečje klinike Tiršova („Tiršova
2“) zbog:
- povećanja prostora u operacionim salama i sobama za pacijente;
- poboljšanja smeštaja za pacijente i njihove porodice;
- efikasnijeg grejanja, ventilacije i klimatizacije, uključujući unapređenje
funkcionalnosti bolnice;
- unapređenja pristupačnosti, protivpožarne zaštite i sistema za
evakuaciju
LokacijaBeograd
Krajnji korisniciZdravstveni radnici i pacijenti
Ukupni troškovi
projekta
EUR 190.000.000
Plan
finansiranja
IzvoriUpotreba
U mil.
EUR
%U mil.
EUR
%
BRSE Zajam,
uključujući:

Inicijalni zajam LD 2009

Predloženi dodatni

zajam, LD 2009/ADD 1
104,0
54,0

50,0
54,74Izgradnja i
opremanje

nove

Univerzitetsk

e dečje

klinike -

Tiršova 2 u

Beogradu
190,0100,0
TRUST fondovi kojima
rukovodi BRSE
0,320,17
WBIF35,018,42
Budžet50,6826,67
Ukupno190,0100,0Ukupno190,0100,0
Period
sprovođenja

projekta
1. mart 2020. godine – 31. decembar 2028. godine
Datum
završetka
31. decembar 2028. godine
← Pomerite tabelu levo/desno za više detalja →
II.
Kriterijum
kvalifikovanosti
BRSE finansira projekte koji se tiču zdravstvene i socijalne zaštite i
srodne infrastrukture kako bi se negovao zdrav život i blagostanje
obezbeđivanjem pristupa visokokvalitetnoj i pristupačnoj
← Pomerite tabelu levo/desno za više detalja →
III.
zdravstvenoj zaštiti za sve.
Da bi ispunjavali uslove za finansiranje od strane BRSE, privatne
ustanove i infrastruktura moraju biti odobrene od strane organa za
javno zdravlje i u skladu sa kriterijumima utvrđenim za ovu vrstu
ustanova.
BRSE može finansirati projekte iz oblasti zdravstva, socijalne
zaštite i srodne infrastrukture i usluge kao što su:
1. Izgradnja i/ili rekonstrukcija:
i. državnih bolnica;
ii. infrastrukture javnih zdravstvenih službi;
iii. specijalizovane centre za pružanje pomoći ranjivim i
zavisnim grupama stanovništva;
iv. domova za brigu o starim licima i centara za socijalnu
pomoć, uključujući smeštaj za stara lica koja su i dalje
nezavisna u svom funkcionisanju;
v. objekte za istraživanje i razvoj u oblasti zdravstva.
2. Adaptacija navedenih objekata kako bi se olakšala
pristupačnost osobama sa smanjenom pokretljivošću;
3. Programi obuke i podrške u korist osoba sa invaliditetom;
4. Obuka medicinskog i sociomedicinskog stručnog osoblja;
5. U okviru projekata u oblasti zdravstva, finansiranje može takođe
biti odobreno i za osnovnu infrastrukturu kao što su sistemi i
objekti za vodosnabdevanje i odvodnjavanje otpadnih voda,
objekti za sakupljanje i prerada čvrstog otpada, uključujući
opasni otpad, kao i za sisteme snabdevanja električnom
energijom i gasom, IT infrastrukturu i komunikacione objekte
(kao što su telefon, internet, kablovska televizija itd.).
Kvalifikovani
troškovi
Troškovi ulaganja prihvatljivi za finansiranje BRSE uključuju:
• Pripremna istraživanja ili studije (tehničke, ekonomske ili
komercijalne, inženjerske, procene uticaja na životnu sredinu i
društveni uticaj i planovi upravljanja), tehnički nadzor projekta i
druge stručne usluge u vezi sa Projektom. Ovi troškovi ne bi
trebalo da prekorače 5% ukupnih troškova Projekta, osim ako je
prekoračenje opravdano.
• Kupovina ili priprema zemljišta za koje Zajmoprimac može da
dokaže da je direktno vezano za realizaciju Projekta, po
kupoprodajnoj ceni, osim ako je zemljište donirano ili
poklonjeno.
• Izgradnju/ renoviranje/ modernizaciju ili kupovinu objekata
direktno povezanih sa Projektom. Kupovina objekata mora
odgovarati podobnim sektorima aktivnosti definisanim u NACE
nomenklaturi Evropske unije.
• Instalaciju osnovne infrastrukture, kao što su kanalizacija,
vodosnabdevanje, gasovod, električne i telekomunikacione
mreže, odlaganje otpada i prečišćavanje otpadnih voda, putevi,
itd.
• Kupovinu materijala, opreme i mašina, uključujući IT opremu i
softver, kao i povezanih troškova vezanih za obuku zaposlenih.
• Tehnička pomoć za podršku u implementaciji Projekta.
← Pomerite tabelu levo/desno za više detalja →
• BRSE može da finansira nepredviđene troškove (tehnički i/ili
troškovi povećanja cena). Oni predstavljaju finansijsko pokriće
za nepredviđene promene u obimu potrebnih radova, ili u
jediničnim cenama, u vrsti i količini opreme koja treba da se kupi
ili u načinu sprovođenja Projekta. Ovi nepredviđeni troškovi
mogu predstavljati do 10% ukupnih troškova Projekta. Procenat
nepredviđenih troškova može biti veći ako je to opravdano
tokom procene.
• Troškovi koji se odnose na profesionalne/stručne obuke i
kampanje za podizanje svesti javnosti mogu biti kvalifikovani za
finansiranje od strane BRSE uzimajući u obzir njihove ciljeve u
okviru projekta.
• Zajam ne mogu da pokrivaju troškove za zaposlene (nadnice i
plate i druga srodna plaćanja kao što je uplata penzijskog
osiguranja), finansijske troškove i negotovinske stavke kao što
je amortizacija. Takvi troškovi se mogu smatrati kvalifikovanim
kada se odnose na upravljanje projektom ili tehničku pomoć
potrebnu za pripremu projekta i sprovođenje projekta.
• Finansijski troškovi (plaćanje i/ili refinansiranje dugova, troškovi
kamate, preuzimanje udela u kapitalu preduzeća, itd) ili
finansijske investicije ne mogu biti uklljučeni u procenjene
troškove Projekta i ne može ih finansirati BRSE.
• Troškovi koji ne podležu odbitku ili povraćaju PDV-a i drugi
troškovi bez mogućnosti odbitka ili povraćaja poreza mogu se
smatrati prihvatljivim troškovima.
Posebni usloviUslov pre poslednje isplate: Zajmoprimac informiše BRSE da su
definisane potrebe za radnicima u svim bolničkim službama i da je
napravljena strategija ljudskih resursa.
← Pomerite tabelu levo/desno za više detalja →
Socijalni uticajProjekat će doprineti unapređenju uslova za pacijente i zdravstvene
radnike kao i kvalitetu usluga koje se pružaju. Očekuje se da će
unapređen pristup modernoj opremi doprineti boljoj dijagnostici i
delotvornijem lečenju pacijenata, što će dovesti do smanjenja broja
pacijenata koji moraju da odlaze iz zemlje radi lečenja. Uopšteno
gledano, unapređenje kvaliteta smeštaja, higijene, radnih i terapijskih
uslova za pacijente i njihove negovatelje trebalo bi da dovede do veće
udobnosti i dostojanstva pacijenata tokom lečenja i poveća stopu
oporavka i ponovne socijalizacije u skladu sa relevantnim standardima
EU i Svetske zdravstvene organizacije (SZO).
← Pomerite tabelu levo/desno za više detalja →
IV.
PRILOG 2
Obrazac pravnog mišljenja (Okvirni sporazum o zajmu)
[UBACITI MEMORANDUM]
Banka za razvoj Saveta Evrope
55, avenue Kléber
75116 Pariz, Francuska
Za: Odeljenje za projekte
Kopija:Kancelarija generalnog saveta
[UNETI DATUM]
Predmet: Okvirni sporazum o zajmu između Banke za razvoj Saveta Evrope i
Republike Srbije (Ref: LD [•])
Poštovani,
U svojstvu ministra pravde dajem ovo pravno mišljenje u skladu sa odredbama Okvirnog sporazuma o zajmu LD 2009 ADD 1 (2025) između Banke za razvoj Saveta Evrope i Republike Srbije, na iznos od 50.000.000 evra, potpisanog _____________, i koji je stupio na snagu ___________ (u daljem tekstu: „Sporazum o zajmuˮ). Svi termini koji se ovde koriste i nisu definisani na drugačiji način imaju isto značenje kao u Sporazumu o zajmu.
Pregledao sam primerak Sporazuma o zajmu i odredbe Ustava Republike Srbije („Službeni glasnik RS”, br. 98/2006 i 115/2021), kao i zakonske dokumente i druge propise, i sproveo druge radnje koje sam smatrao potrebnim u cilju davanja ovog mišljenja.
Na osnovu napred navedenog, izjavljujem sledeće:
(a)
odredbom člana 123. Ustava Republike Srbije propisano je da Vlada utvrđuje i vodi politiku, a odredbom člana 2. stav 1. i člana 43. stav 3. Zakona o Vladi („Službeni glasnik RS”, br. 55/05, 71/05 - ispr., 101/07, 65/08, 16/11, 68/12-US, 72/12, 7/14-US, 44/14 i 30/18-dr. zakon) propisano je da Vlada utvrđuje i vodi politiku Republike Srbije, i kad ne donosi druge akte donosi zaključke. U skladu sa navedenim odredbama, Vlada je na sednici održanoj _________ donela Zaključak 05 Broj: ________, kojim je usvojila Nacrt sporazuma o zajmu i ovlastila ______________________, da u ime Vlade, kao zastupnika Republike Srbije potpiše Sporazum o zajmu;
(b)
odredbom člana 99. stav 1. Ustava Republike Srbije propisano je da Narodna skupština Republike Srbije potvrđuje međunarodne ugovore kada je zakonom predviđena obaveza njihovog potvrđivanja, a odredbom člana 2. stav 1. Zakona o zaključivanju i izvršavanju međunarodnih ugovora („Službeni glasnik Republike Srbije”, broj 32/13) propisano je da se međunarodnim ugovorom smatra ugovor koji Republika Srbija zaključi u pisanom obliku sa jednom ili više država ili sa jednom ili više međunarodnih organizacija, koji je regulisan međunarodnim pravom. Zatim, odredbom člana 5. stav 2. Zakona o javnom dugu („Službeni glasnik RS”, br. 61/05, 107/09, 78/11, 68/15, 95/18, 91/19 i 149/20) propisano je da Narodna skupština Republike Srbije odlučuje o zaduživanju Republike Srbije putem uzimanja dugoročnih kredita, zaduživanju za finansiranje investicionih i programskih projekata putem uzimanja dugoročnih kredita, o davanju garancija, kao i o neposrednom preuzimanju obaveze u svojstvu dužnika po osnovu date garancije. U skladu sa navedenim odredbama, Narodna skupština Republike Srbije donela je Zakon o potvrđivanju Okvirnog sporazuma o zajmu LD 2009 ADD 1 (2025) između Banke za razvoj Saveta Evrope i Republike Srbije, Projektni zajam („Službeni glasnik RS - Međunarodni ugovori”, broj _________);
(c)
ne postoji nijedna druga odredba u skladu sa kojom bi bilo neophodno da se Sporazum o zajmu dostavi, evidentira ili registruje kod bilo kog suda ili državnog organa ili organizacije da bi se obezbedila njegova zakonitost, punovažnost ili izvršivost;
(d)
izbor prava u skladu sa Sporazuma o zajmu je punovažan i obavezujući za Zajmoprimca prema zakonima Republike Srbije;
(e)
u skladu sa Sporazuma o zajmu, odredbe o arbitraži navedene u poglavlju 4. Propisa za zajmove Banke za razvoj Saveta Evrope će se primenjivati u vezi sa bilo kakvim potraživanjem ili sporom između Republike Srbije i Banke za razvoj Saveta Evrope koji može nastati u vezi sa Sporazumom o zajmu i bilo koja odluka arbitražnog suda koja se odnosi na Sporazum o zajmu može se izvršiti u Republici Srbiji bez ponovnog ispitivanja ili suđenja već presuđene stvari. S tim u vezi, odricanje od imuniteta u skladu sa odredbom Sporazuma o zajmu je punovažno i obavezujuće;
(f)
nikakvi porezi, carine, takse ili drugi nameti, uključujući bez ograničenja poreze, takse, ili druge dažbine za registraciju ili transfere koji su propisani u Republici Srbiji, ili bilo kojoj drugoj jedinici teritorijalne autonomije ili lokalne samouprave, nisu plativi u vezi sa zaključenjem ili izvršavanjem Sporazuma o zajmu, ili sa plaćanjem koje Republika Srbija treba da izvrši Banci za razvoj Saveta Evrope u skladu sa Sporazumom o zajmu;
(g)
ne postoje ograničenja kontrole razmene deviza ili da nisu potrebne saglasnosti da bi se dozvolilo primanje svih iznosa koji će biti isplaćeni shodno Sporazumu o zajmu, niti da se dozvoli otplata zajma i isplata kamata i drugih iznosa dospelih na osnovu Sporazuma o zajmu;
(h)
zaključenjem Sporazuma o zajmu i njegovim izvršavanjem nisu prekršene odredbe zakona na snazi u Republici Srbiji ili učinjene povrede odredbi ugovora ili obaveza na koje se Republika Srbija obavezala.
Na osnovu gore navedenog, mišljenja sam da su ispunjeni svi uslovi koji su propisani Ustavom, zakonima i drugim propisima Republike Srbije, a koji se mogu primeniti na Sporazum o zajmu i da su odredbe navedenog sporazuma na snazi i obavezujuće, odnosno, da je Sporazum o zajmu punovažan i izvršiv u Republici Srbiji u skladu sa njegovim odredbama.
S poštovanjem,
MINISTAR
[●]
[UNETI IME(NA)/FUNKCIJU(E)]
PRILOG 3
ZAHTEV ZA ISPLATU (PRIMER)
LD [•] – [•]Tranša
U odnosu na Okvirni sporazum o zajmu od [●] (u daljem tekstu “Sporazum”) između Banke za razvoj Saveta Evrope (u daljem tekstu “BRSE”) i [ZAJMOPRIMAC] (u daljem tekstu “Zajmoprimac”), Zajmoprimac ovim obaveštava BRSE, u skladu sa potklauzulom 4.3 (a) Sporazuma, da nastavi sa isplatom Tranše u skladu sa uslovima utvrđenim u tekstu ispod.
Pojmovi definisani u Sporazumu imaju isto značenje u ovom dokumentu, ukoliko to nije drugačije naznačeno.
Valuta/Iznos1[●]
Datum isplate[●]
Period otplate glavnice[●] godina [uključujući period počeka od [●] godina]
Datum(i) otplate glavnice[●]
Datum dospeća[●]
Kamatna stopafiksnamaksimum [●] godišnje
varijabilnaReferentna
stopa:
[[●]-mesečni
EURIBOR/UNET

I BILO KOJU

DRUGU REF.

KAMATNU

STOPU] godišnje
RasponMaksimum[●]
baznih poena
Kamatni period[Kvartalno] [šestomesečno] unazad
Datumi plaćanja kamatePlaćanje kamate će se izvršiti [●] svake godine, a
prvi put [●]
Konvencija za utvrđivanje broja danaKonvencija o modifikovanom narednom radnom
danu
Radni dan[●]
Račun ZajmoprimcaNaziv korisnika
Banka korisnika

Korespondenska

banka (po potrebi)
[●]
Naziv[●]
Grad[●]
SWIFT[●]
IBAN[●]
Ref.[●]
Naziv[●]
Grad[●]
SWIFT[●]
IBAN[●]
← Pomerite tabelu levo/desno za više detalja →
Za zajmoprimca [UNETI IME(NA)/FUNKCIJU(E)] Datum:____________
OBAVEŠTENjE O ISPLATI (PRIMER)
LD [•] – [•] Tranša
1 [U slučaju Pod-tranši, posebna tabela će navesti iznos, period otplate glavnice, datum(e) otplate glavnice, kamatnu stopu, kamatni period, datume plaćanja kamate za svaku Pod-tranšu.] U odgovoru na vaš Zahtev za isplatu od [●] u vezi sa Okvirnim sporazumom o zajmu od [●] (u daljem tekstu “Sporazum”) između Banke za razvoj Saveta Evrope (u daljem tekstu BRSE) i [ZAJMOPRIMAC] (u daljem tekstu “Zajmoprimac”), BRSE ovim obaveštava Zajmoprimca, u skladu sa potklauzulom 4.3 (b) Sporazuma, o uslovima isplate relevantne Tranše.
Pojmovi definisani u Sporazumu imaju isto značenje u ovom dokumentu, ukoliko to nije drugačije naznačeno.
Valuta/Iznos2[●]
Datum isplate[●]
Period otplate glavnice[●]godina [uključujući period počeka od [●] godina]
Datum(i) otplate glavnice[●]
Datum dospeća[●]
Kamatna stopaFiksna[●] godišnje
VarijabilnaReferenta
stopa:
[[●]-mesečni
EURIBOR/UNETI BILO

KOJU DRUGU REF.

KAMATNU STOPU]

godišnje
Raspon[●] baznih poena
Kamatni period[Kvartalno] [šestomesečno] unazad
Datumi plaćanja kamatePlaćanje kamate će se izvršiti [●] svake godine, a prvi put [●]
Konvencija za utvrđivanje broja
dana
Konvencija o modifikovanom narednom radnom danu
Radni dan[●]
Račun zajmoprimcaNaziv korisnika[●]
Banka korisnikaNaziv[●]
Grad[●]
SWIFT[●]
IBAN[●]
Ref.[●]
Naziv[●]
Grad[●]
SWIFT[●]
Račun BRSENaziv korisnikaBanka za razvoj Saveta Evrope
SWIFT korisnikaCEFPFRPP
Banka korisnikaNazivDeutsche Bank
GradFrankfurt (Nemačka)
SWIFTDEUTDEFF
IBANDE44 5007 0010 0928 7384
00
← Pomerite tabelu levo/desno za više detalja →
Korespondenska banka (po potrebi)
IBAN [●]
Za BRSE [UNETI IME(NA)/FUNKCIJU(E)] Datum:___________
2 [U slučaju Pod-tranši, posebna tabela će navesti iznos, period otplate glavnice, datum(e) otplate glavnice, kamatnu stopu, kamatni period, datume plaćanja kamate za svaku Pod-tranšu.]
PRILOG 4
Obrazac potvrde
(STAVITI MEMORANDUM)
Za: Banka za razvoj Saveta Evrope
Od: [ZAJMOPRIMAC]
Datum: [NE RANIJE OD PET (5) RADNIH DANA PRE ZAHTEVA ZA ISPLATU]
Predmet: Okvirni sporazum o zajmu između Banke za razvoj Saveta Evrope i [ZAJMOPRIMAC] od [●] (u daljem tekstu „Sporazum“).
Poštovani,
Izrazi definisani u Sporazumu imaju isto značenje kada se koriste u ovoj Potvrdi. U svrhu potklauzule 4.5 Sporazuma, ovim vam potvrđujemo kako sledi:
(a)
Nije došlo do Materijalno štetne promene u poređenju sa situacijom na datum potpisivanja sporazuma;
(b)
Nije se desio Događaj neispunjenja obaveza;
(c)
Nijedan od Instrumenata zaduživanja Zajmoprimca ne uključuje klauzule o gubitku rejtinga, finansijskih pokazatelja ili pari passu odredbe koje su strože od bilo koje ekvivalentne odredbe Sporazuma;
(d)
Izjave i garancije koje ćemo dati ili ponoviti prema Sporazuma su istinite u svakom pogledu; posebno, nijedno Sredstvo obezbeđenja nije dato trećoj strani koja krši potklauzulu 7.2 Sporazuma; i
(e)
Nijedan događaj ili okolnost koja bi mogla da dovede do prevremene otplate, obustave ili poništenja Zajma pod uslovima iz člana 3.3 (Prevremena otplata isplaćenih zajmova), 3.5 (Obustava neisplaćenih zajmova od strane Banke) i 3.6 (Otkazivanje od strane Banke isplate neisplaćenih zajmova) Propisa o zajmu nije se desio niti se opravdano može očekivati da će se dogoditi / malo verovatno će se dogoditi.
Za [ZAJMOPRIMAC]
[UNETI IME(NA)/FUNKCIJU(E)]
PRILOG 5
Izveštaj o napretku/završetku
1. Narativni deo
Izgradnja nove zgrade za Univerzitetsku dečju kliniku Tiršova (Tiršova 2)
(Period izveštavanja ________ – _________)
I. UVOD
II. RADNjE U VEZI JAVNIH NABAVKI
III. NAPREDAK POSLOVA
Pripremni radovi
Tekući radovi
IV. FINANSIJSKE AKTIVNOSTI
V. PREDSTOJEĆE AKTIVNOSTI
VI. RADNjE KOMUNIKACIJE I DOSTUPNOSTI
VII. ODSTUPANjA OD PLANA I POTEŠKOĆE
2.
Tabela 1: PLAN REALIZACIJE
Tabele
Zemlja: Srbija, Univerzitetska dečja klinika u
Beogradu
Projekat: LD 2009 ADD 1 (2025)
Datum izveštaja: 25. januar 2025. godine
za
Naziv Projekta: UDK Tiršova
Aktivnosti
(Indikativan spisak, podložan izmenama)
201920202021202220232024202520262027% realizacije
Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4
1.Studija izvodljivosti i šematski
projekat (izrada i odobrenje)
Početno stanje*
Trenutno stanje**100%
2.Tender za Projekat građevinske
dozvole „PGD“ (izrada tenderskog

dosijea, sprovođenje tendera, ocena

i potpisivanje ugovora)
Početno stanje*Izvedeno sa UNPD. Završenost: 100%
Početna faza je produžena kako bi se

omogućila opsežna diskusija sa budućim

korisnicima.
Trenutno stanje**
3.Izrada Projekta građevinske
dozvole „PGD“, njegovo odobrenje i

dobijanje građevinske dozvole
Početno stanje
Trenutno stanje
4.Preseljenje stanaraPočetno stanje
Trenutno stanje100%
5.Tender za Projekat za izgradnju
„PZI“ i izgradnja (izrada tenderskog

dosijea, sprovođenje tendera, ocena

i potpisivanje ugovora)
Početno stanje100%
Trenutno stanje
6.Izgrada Projekta za izgradnju „PZI“
(izrada i odobrenje)
Početno stanje100%
Trenutno stanje
7.Izgradnja klinikePočetno stanje0%
Trenutno stanje0%
8.Instalacija medicinske opreme i
obuka zaposlenih
Početno stanje0%
Trenutno stanje0%
9.Stavljanje klinike u radPočetno stanje0%
Trenutno stanje0%
10.Zapošljavanje osobljaPočetno stanje0%
Trenutno stanje0%
11.Akreditovanje i otvaranje klinikePočetno stanje0%
Trenutno stanje0%
*početni plan realizacije = plan iz OSZ
← Pomerite tabelu levo/desno za više detalja →
praćenje
Indikatori uspeha
TABELA 2: INDIKATIVNI POKAZATELjI UČINKA/ISHODA
Zemlja: Srbija, Univerzitetska dečja klinika u Beogradu
Projekat: LD 2009 ADD 1 (2025)
Naziv projekta: _________ Datum izveštaja: _____________
IndikatoriJedinicePočetno
stanje*
ProjekcijaOstvareno na kraju
projekta
Troškovi projektne investicije (ukupno)miliona €75110
Kontrola vremenskog okvira projekta:
početak/završetak radova
Mesec/godina03/2020 -
06/2023
jun 2024. godine
Planirani broj bolničkih krevetaBr.218
Unapređenje učinka odnosa prosečne
dužine boravka (-) i prosečnog broja

zauzetih kreveta (+)
Dani i %
Nabavka medicinske opreme da bi se
smanjila zagušenja i liste čekanja i

vreme čekanja
MEUR i br.34 MEUR
Nastavak planiranih ostvarenih
povećanja produktivnosti ambulantnog,

dnevnog i kratkog boravka
br.
Smanjenje liste čekanja i vremena za
čekanje na neurgentne hirurške
br.
nedelje
Smanjenje liste čekanja i vremena za
čekanje na ambulantna i dijagnostička

ispitivanja
br.
nedelje
Smanjenje oboljenja i mortaliteta koji se
mogu izbeći, naročito u odnosu na stopu

infekcija uzrokovanih pružanjem

zdravstvene zaštite
%
Ukupno
pacijenata
Bruto površina za izgradnjum²33297
Zdravstveni radnici ekvivalentno punom
radnom vremenu (Full Time Equivalent, FTE)
br.900
Svi zaposleni ekvivalentno punom
radnom vremenu (Full Time Equivalent, FTE)
br.1050
Odnos zaposlenih muškaraca/žena prema
kategorijama zdravstvenih radnika,

negovatelja i nemedicinskog osoblja
%
Broj kreveta po sobi%1. februar
Udeo pacijenata pokrivenih državnim
osiguranjem
%
Smanjenje jediničnih troškova po
tretiranom slučaju
EUR/clučaj
Udeo godišnjih operativnih troškova
potrošenih na PPM adekvatan za održanje

kvaliteta infrastrukture
%
Smanjenje emisije gasova sa efektom
staklene bašte ili potrošnje, ako je

dostupno
%, ekv.t CO2
ili

kWh/m2/godi

šnje
Ciljani nivo sertifikata o energetskim
svojstvima (A, B, C), ako je dostupno
Nivo
← Pomerite tabelu levo/desno za više detalja →
Finansijski
izveštaj
Tabela iz priloga — strana 81
Tabela iz priloga — strana 81 — izvorna tabela; sadržaj slike nije obuhvaćen tekstualnom pretragom.
Tabela iz priloga — strana 82
Tabela iz priloga — strana 82 — izvorna tabela; sadržaj slike nije obuhvaćen tekstualnom pretragom.
TABELA 4 – PLAN JAVNIH NABAVKI (bez PDV-a)
Datum plana jav
Datum izmenjenog plana ja
nih nabavki
vnih nabavki
← Pomerite tabelu levo/desno za više detalja →
DRŽAVA: SRBIJA
PROJEKAT: LD 2009 (2025) Add 1 Nova univerzitetska dečja bolnica Tiršova
ZAJMOPRIMAC:
Ref. br.Opis ugovoraUgovorena vrednost u evrimaProcenjeni troškovi u
evrima
FinansiraBr. partijaMetod nabavkePrednost
domaćih

izvođača
Pregled
banke

(pre/posle)
Očekivani
datum objave

ponude za

uži izbor
Očekivani
datum otvaranja

ponuda
Očekivani
datum

evaluacije

ponuda
Očekivani
datum

potpisivanj

a ugovora
Datum
okončanja
Procenjeni
datum

končanja
Vrsta
(radovi,

usluge,

dobra)
Filter
← Pomerite tabelu levo/desno za više detalja →
Tabela iz priloga — strana 84
Tabela iz priloga — strana 84 — izvorna tabela; sadržaj slike nije obuhvaćen tekstualnom pretragom.
Član3.
Ovaj zakon stupa na snagu osmog dana od dana objavljivanja u „Službenom glasniku Republike Srbije – Međunarodni ugovori”.