| Donosilac | Narodna skupština Republike Srbije |
Napomene izvornog teksta
| Total cost of the project scheme | Information to be provided to the Bank |
| > EUR 50 million | Schemes with a total cost of more than EUR 50 million will be subject to a specific due diligence by the Bank’s services. The Implementing Entity will provide the documents requested by the Bank allowing this instruction. |
| > EUR 5 million | Schemes will be selected by the Borrower (through the Implementing Entity and the Promoter) on the basis of their compliance with the eligibility criteria defined in the technical description (see A.1.1). The allocation of the Bank’s funds shall be subject to the ex -ante approval of the Bank’s services on the basis of the summary information to be provided by the Borrower (through the Implementing Entity or the Promoter), namely a copy of the completed application form for the allocation under a framework loan annex A.5 below, including the relevant supporting documents for each scheme. The information will include the following elements: a description of the scheme, location, the beneficiary and the operator; a technical description of the investment concerned (objectives, main technical characteristics, costs, capacity, situation, expected benefits, timetable for implementation of the main components); Evidence that the environmental and social assessment procedures have been undertaken in line with the applicable legislation and the EIB's Environmental and Social Standards, and that relevant environmental documents are provided. an analysis of the vulnerability to climate change of the scheme concerned based on findings of the CRVA and presentation of adaptation measures; |
| < EUR 5 million | Schemes will be selected by the Borrower (through the Implementing Entity or the Promoter) on the basis of their compliance with the eligibility criteria set out in the Technical Description (see A.1.1). The list of schemes allocated is subject to ex- ante verification by the Bank’s services in the form of annex A.6 below. |
| Financial Contact | Technical Contact | MoCTI | |
| Company | Public Enterprise Roads of Serbia | Public Enterprise Roads of Serbia | |
| Contact person | to be provided at the Bank’s request (including by email) | to be provided at the Bank’s request (including by email) | |
| Title | Executive director | Executive director | |
| Function / Department financial and technical | Financial departments | Department for investments | |
| Address | Bulevar kralja Aleksandra 282 | Vlajkovićeva 19 a | |
| Phone | |||
| Document / information | Deadline |
| Project Fiche (templates below in A.4, A.5 or A.6) duly filled to the Bank’s satisfaction. | As part of to each allocation request. |
| Updated procurement plan | Yearly (as part of the Progress report) or with each allocation request, or within 1 month following any material modification. |
| Updated indicative list of project schemes | Yearly or within 1 month following the suspension or cancellation of an allocated scheme. |
| All documents (including bidding documents, evaluation reports, copy of all exchanges with candidates) related to the procurement procedure of three contracts randomly selected by the EIB, for a sample review purpose | In case of delegated procurement monitoring, yearly (within 15 days following EIB’s request with the list of selected contracts) |
| Document / information | Deadline | Frequency of reporting |
| Project Progress Report - A brief update on the Technical Description, explaining the reasons for significant changes vs. initial scope; - Update on the date of completion of each of the project’s components, explaining reasons for any possible delay; - Update on the cost of the project, explaining reasons for any possible cost variations vs. initial budgeted cost; - Updated list of allocated schemes including for each scheme the following information: o Related works contracts (if more than one); o Updated cost (including any variation) and corresponding eligible cost; o Expenditures to date. - Consolidation of actual project’s expenditures to date; - A description of any major issue with impact on the environment and/or social impact; - Update of the procurement plan; - Update on the project’s demand or usage and comments; - Update on progress related to gender equality (including the percentage of female employees and turnover rates of women and men across all job categories). - Any significant issue that has occurred and any significant risk that may affect the project’s operation; - Statistics on the number of work-related accidents (including traffic accidents and health and safety issues) on project sites. - Any legal action concerning the project that may be on-going; - Non-confidential project-related pictures, if available. - Any update in the development and implementation of the Borrower’s/Implementing Entity’s climate resilience plan since contract signature. | 1 year after signature of Finance Contract | Yearly |
| Document / information | Date of delivery to the Bank |
| Project Partial Completion Report and Project Completion Report, including: - A final Technical Description of the project as completed, explaining the reasons for any significant change compared to the Technical Description in A.1; - The date of completion of each of the main project’s components, explaining reasons for any possible delay; - The final cost of the project, explaining reasons for any possible cost variations vs. initial budgeted cost; - Employment effects of the project: person-days required during implementation as well as permanent new jobs created disaggregated by sex; - A description of any major issue with impact on the environment or social impacts; - A summary of progress related to gender equality (including the percentage of female employees and turnover rates of women and men across all job categories) over the project period; - A summary of the number of work-related accidents (including traffic accidents and health and safety issues) on all project sites over the project period. - Update on procurement procedures and explanation of deviations from the procurement plan; - Update on the project’s demand or usage and comments; - Any significant issue that has occurred and any significant risk that may affect the project’s operation; - Any legal action concerning the project that may be on going. - Any update in the Borrower or Head of Group’s decarbonisation plan (including targets) or climate resilience plan since contract signature. - Non-confidential project-related pictures, if available. - An update on the following monitoring indicators: o Measured quality of pavement roughness of sections covered by the programme within the three-measurement wavelength bands o Total length of motorways rehabilitated under the programme, in length of carriageway (one direction) and km lane o Number of roads fatalities on sections rehabilitated under the programme o Trafic volumes on the respective road sections (AADT) - An update on the additional monitoring indicators agreed in the Steering Committee report | Project Completion Report: 15 months after project completion |
| Document / information | Date of delivery to the Bank |
| Update on the Monitoring Indicators listed in the table above. | 3 years after the project completion report |
| Language of reports | English |
| Name of EIB Operation: | SUSTAINABLE IMPROVEMENT OF ROAD NETWORK | |||||
| Number of EIB Operation: | 20190805 | |||||
| Summary of Allocations | ||||||
| Previous allocations: | ||||||
| Allocation number | Name of sub-project | Road ID | Total Investment cost (EUR) | EIB Eligible cost (EUR) | ||
| Total requested amounts | ||||||
| Curent allocation request | ||||||
| Allocation number | Name of sub-project | Road ID | Total Investment cost (EUR) | EIB Eligible cost (EUR) | ||
| Total requested amounts | ||||||
| Total amount to be allocated: |
| Name of the concerned section | |||
| Managing institution | |||
| Road ID | Date of last investment | ||
| Start PK – Fin PK (intervention zone) | - | Length of the sub-project in (km) |
| Renewal or rehabilitation of existing asset (pavement, drainage system, retention walls, etc.) reaching the end of their useful life. | |
| Reduction of operating and maintenance costs. | |
| Bringing existing infrastructure and facilities into compliance with current regulations. | |
| Improvement of the resilience of existing infrastructure and facilities to climate change. | |
| Improving road safety. |
| Has a Climate Risk and Vulnerability Assessment (CRVA) of the sub-project been completed performed in line with Technical screening criteria as outlined for Substantial Contribution to CC-A as outlined in the EU Taxonomy Delegated Regulation 2021/2139 - Annex 26? (yes/no) | |||
| If yes, which key climate hazards/ risks have been considered in the risk assessment? | |||
| Risks (e.g.) | Risk rating* | Adaptation measures proposed (infrastructural or operational) | |
| Extreme temperatures (incl. heat waves) | |||
| Cold spells | |||
| Freeze-thaw damage | |||
| Extreme precipitation | |||
| Flooding | |||
| Ground instability/ landslides/ erosion | |||
| Extreme winds |
| Wildfires | ||
| Fog | ||
| Other (please specify) |
| Current Year – 5 years | Current Year | Year of Opening to Traffic | Year of Opening to Traffic + 5 years | |
| 2019 | 2024 | 2026 | 2031 | |
| Trafic in AADT | ||||
| % HGV |
| Investment Cost, excluding VAT (RSD) | Investment Cost, excluding VAT (EUR) | |
| Earthworks | ||
| Major bridge structures (>100m) | ||
| Major tunnels (>100m) | ||
| Structures general, including walls | ||
| Drainage, incl. culverts | ||
| Retaining structures | ||
| Road works and Pavement - reconstruction | ||
| Road works and Pavement - resurfacing | ||
| Safety measures (signage, guard railing) | ||
| Installations (mechanical and electrical) | ||
| Environment (e.g. noise, animal protection) | ||
| Other | ||
| Land aquisition | ||
| Technical contingencies | ||
| Financial Contingencies | ||
| Total cost | ||
| EIB eligible cost |
| Contract | Procurement procedure | Total value of contract | Amount allocated to the sub-project | Estimated publication date |
| Description of works/services | International, open, restricted… | EUR | EUR | |
| Is an Environmental Impact Assessment (EIA) required? | Yes / No |
| If the sub-project has been screened out by the competent authority, has the decision not to require an EIA been issued by the authority? | Yes / No / N/A |
| If Yes, please provide the decision (along with | |
| the information submitted to the relevant | |
| authority as a basis of their determination). | |
| Has the environmental authorization/consent been granted by the competent authority? | Yes / No / N/A |
| If Yes, please provide the authorization/consent | |
| granted by the competent authority. | |
| Are other studies concerning the environmental aspects of the sub-project required and/or conducted? | Yes (please specify) / No / N/A |
| If Yes, please specify the studies required or | |
| conducted | |
| Is the sub-project located near protected sites (or having protected sites within its influence zone), | Yes / No |
| Is the project likely to have significant impacts on nearby nature conservation areas? | Yes / No |
| If Yes, please include where relevant a reference | |
| to the studies where these risks and impacts are | |
| assessed. Please provide the statement of the | |
| competent environmental authority. | |
| If No, please provide the statement of the | |
| competent environmental authority regarding the | |
| absence of significant impacts on the sites | |
| Has a public consultation been conducted / will be conducted on a document related to the project? (Planning documents, ESMF, EIA, or any other such as E&S Screening exercise, full | Yes / No / N/A |
| If Yes, please describe the public consultation |
| ESMP or ESMP checklist, RAP/LRP) | process to be conducted / conducted and the |
| participation of local communities and the most | |
| vulnerable groups including indigenous | |
| groups/minority ethics groups where applicable. | |
| And provide any relevant stakeholder | |
| engagement and consultation related | |
| documents* (including FPIC** related | |
| documents) | |
| Is the project compliant with all environmental requirements? (local and national) | Yes / No |
| Please provide a list of the environmental | |
| requirements the sub-project is subject to. | |
| Does the project have any particular social issues (involuntary economic and/or physical displacement, impacts on vulnerable groups, labor standards, health, safety, and security at work)? | Yes / No |
| If Yes, please include where relevant a reference | |
| to the studies where these risks and impacts are | |
| assessed. | |
| How does the the Implementing Entity intend to monitor E&S and Health and Safety performance on-site of the sub-project? | Please include where relevant a reference to the |
| documents where the the Implementing Entity | |
| indicates the main E&S and Health and Safety | |
| indicators that will be / are monitored and | |
| reported on as well as explains the roles and | |
| responsibilities for monitoring and reporting. | |
| Does the project address a known road safety black spot | Yes/No. |
| If Yes, please provide a brief description |
| (1) | Order |
| (2) | Road ID |
| (3) | Sub-project name (section name) |
| (4),(5) | Intervention area where the work will take place (start km and end km, in ascending order of km) |
| (6) | Length of the lane intervention area.km (length multiplied by the number of lanes concerned) |
| (7), (8) | Average annual daily traffic (AADT) of the section corresponding to the area of intervention, as well as the % of heavy goods vehicles (HGVs). Make the weighted average if the work is spread over two different homogeneous sections |
| (9),(10) | Estimation of the annual average daily traffic (AADT) of the section corresponding to the area of intervention, as well as the % of heavy goods vehicles (HGVs) five years after the end of the works. Make the weighted average if the work is spread over two different homogeneous sections |
| (11) | Briefly describe the work carried to be out on the roadway, structures, drainage network, embankments, equipment, etc. |
| (12) | Estimated start and end date of the works |
| (13)-(14) | Estimate of the total cost of the investment in RSD and EUR |
| (15)-(17) | Estimate of the total cost of the investment EUR, less the ineligible cost |
| (18) | Please indicate the tender procedure — ‘I’ International tender, ‘N’ National procedure, ‘Ne’ Negotiating procedure, ‘D’ Direct award, ‘Em’ Urgency procedure and, ‘C’ Consultation (where only a few companies are invited to tender). |
| (19) | Indicate whether the sub-project intervention area has been subject to a Climate Risk Vulnerability Analysis (CRVA) performed in line with Technical screening criteria as outlined for Substantial Contribution to CC-A as outlined in the EU Taxonomy Delegated Regulation 2021/2139 - Annex 2 , and confirm the explicit reference of the project documentation to the CRVA (indicate the reference) |
| (20) | List the main vulnerabilities of the sub-project section with the infrastructure vulnerability level (low/medium/strong) |
| (21) | Describe the technical solutions chosen and how they reduce key infrastructure vulnerabilities |
| (22) | Indicate whether the work includes addressing road safety black spots (yes/no) |
| (23) | Describe interventions to improve road safety, and interventions on road safety equipment |
| (24) | Estimate the % of the cost of the work on the interventions described in (23) |
| (25) | Please indicate the environmental screening procedure and/or the environmental impact assessment procedure to be followed ("N/A" if not applicable). Please indicate if there are other studies concerning the environmental and social aspects of the sub-project required and/or conducted? If Yes, please specify the studies required or conducted. If available, please provide the environmental authorization/consent to be granted by the competent authority or, if screened out, the decision not to require an EIA issued by the competent authority where applicable (along with the information submitted to the relevant authoritiy as a basis of their determination). Has a public consultation been conducted / will be conducted on a document related to the project? (Master Plan, ESMF, EIA, or any other such as E&S screening checklist, ESMP checklist, RAP/LRP). If Yes, please describe the public consultation process to be conducted / conducted. |
| Concerning the impact of the project on protected habitat areas of international or national importance. Please indicate: (A) No significant impact, potential or probable, on a conservation site. In this case, please provide the statement issued from the competent environmental authority regarding the absence or no significant impacts on the sites. (B) A significant impact, potential or probable, on a conservation site. In this case, please provide the appropriate studies planned to be carried out / carried out and authorisations required. (C) Not applicable | |
| (27) | Please indicate: A) Resettlement* of more than 200 people affected by the project (PAP). B) Reinstallation of less than 200 PAP. C) No resettlement. In both case A or B, provide the Livelihood Restoration Plan or Resettlement Action Plan prepared based on the approved general approach in case of resettlement. *Resettlement refers to displacement that occurs as a direct result of project-related land acquisition or restriction on land use. It includes: (a) physical displacement (i.e. physical relocation, loss of residence or loss of shelter); and/or (b) economic displacement (i.e. loss of assets, or access to assets, that leads to the loss of income sources or means of livelihood). Resettlement is involuntary when affected individuals or communities do not have the right to refuse such displacement. |
| (28) | Please indicate: A) Acquisition of land*. In this case, provide the Livelihood Restoration Plan or Resettlement Action Plan based on the approved general approach in case of land acquisition. B) No land acquisition. *Land acquisition refers to all methods of obtaining land for project purposes, which may include outright purchase, expropriation of land and assets and acquisition of temporary or permanent access rights, such as easements, rights of way, and establishment of restrictions of access to protected and other areas. |
| (29) | Please indicate: (A) Vulnerable groups potentially affected. In this case, please provide a description of the vulnerable groups as well as the planned stakeholder engagement and consultation procedure including related documents*. (A) Indigenous groups/minority ethics groups that are potentially affected. In this case, please provide a description of the indigenous groups/minority ethics groups as well as the planned stakeholder engagement and consultation procedure including related FPIC** related documents (C) No vulnerable groups nor indigenous groups/minority ethics groups are affected. * Documents to demonstrate that stakeholder engagement and consultations will be / have been undertaken as per Standard 7 of EIB standards. ** FPIC: Free, Prior and Informed Consent. Refers to the documents that demonstrate the iterative process whereby the affected community of Indigenous Peoples arrives at an agreement reached within sufficient time and in accordance with their cultural traditions and practices. |
| (30) | Please indicate how does the promoter intend to monitor E&S and Health and Safety performance ? Please provide as relevant a reference to the studies where E&S and Health and Safety risks and impacts are assessed as well as the main E&S and Health and Safety indicators that are / will be monitored and reported on and the roles and responsibilities for monitoring and reporting. |
| Ukupni troškovi projektne šeme | Informacije koje treba dostaviti Banci |
| > 50 miliona EUR | Šeme sa ukupnim troškovima većim od 50 miliona evra biće predmet posebne provere od strane službi Banke. Izvršilac projekta će obezbediti dokumenta koja zahteva Banka, omogućavajući davanje ovog uputstva. |
| > 5 miliona EUR | Šeme će odabrati Zajmoprimac (preko Izvršioca projekta i Promotera) na osnovu njihove ispunjenosti kriterijuma podobnosti definisanih u tehničkom opisu (videti A.1.1). Dodela sredstava Banke podleže prethodnom odobrenju službi Banke na osnovu rezimiranih informacija koje treba da dostavi Zajmoprimac (preko Izvršioca projekta ili Promotera), naime kopiju popunjenog obrasca za prijavu za dodelu u skladu sa okvirnim zajmom, aneks A.5 ispod, uključujući relevantnu prateću dokumentaciju za svaku šemu. Informacije će sadržati sledeće elemente: opis šeme, lokacije, korisnika i operatera; tehnički opis predmetne investicije (ciljevi, glavne tehničke karakteristike, troškovi, kapacitet, situacija, očekivane koristi, vremenski okvir za implementaciju glavnih komponenti); Dokaz da su postupci procene uticaja na životnu sredinu i socijalne aspekte sprovedeni u skladu sa važećim zakonodavstvom i EIB-ovim standardima zaštite životne sredine i socijalne aspekte, kao i da su dostavljeni relevantni dokumenti o zaštiti životne sredine. analiza ranjivosti predmetnog sistema na klimatske promene na osnovu nalaza CRVA i prezentacija mera adaptacije; |
| < 5 miliona EUR | Šeme će odabrati Zajmoprimac (preko Izvršioca projekta ili Promotera) na osnovu njihove ispunjenosti kriterijuma podobnosti definisanih u tehničkom opisu (videti A.1.1). Spisak dodeljenih šema podleže prethodnoj verifikaciji od strane službi Banke u obliku aneksa A.6 ispod. |
| Kontakt za finansijske poslove | Kontakt za tehničke poslove | MGSI | |
| Kompanija | Javno preduzeće „Putevi Srbije” | Javno preduzeće „Putevi Srbije” | |
| Kontakt osoba | dostavlja se na zahtev Banke (uključujući i putem e-pošte) | dostavlja se na zahtev Banke (uključujući i putem e-pošte) | |
| Zvanje | Izvršni direktor | Izvršni direktor | |
| Funkcija / Odeljenje finansijsko i tehničko | Finansijska odeljenja | Odeljenje za investicije | |
| Adresa: | Bulevar kralja Aleksandra br. 282 | Vlajkovićeva br. 19a | |
| Telefon: | |||
| Dokumenti/informacije | Krajnji rok |
| Projektna šema (šabloni ispod u A.4, A.5 ili A.6) uredno popunjena na zadovoljavajući način za Banku. | Kao deo svakog zahteva za alokaciju. |
| Ažurirani plan nabavke | Godišnje (kao deo Izveštaja o napretku) ili sa svakim zahtevom za raspodelu, ili u roku od 1 meseca nakon bilo kakve značajne izmene. |
| Ažurirana indikativna lista projektnih šema | Godišnje ili u roku od 1 meseca nakon suspenzije ili otkazivanja dodeljene šeme. |
| Sva dokumenta (uključujući tendersku dokumentaciju, izveštaje o evaluaciji, kopije svih razgovora sa kandidatima) koja se odnose na postupak javne nabavke za tri ugovora koje je nasumično odabrala EIB, u svrhu pregleda uzorka | U slučaju delegiranog praćenja javnih nabavki, godišnje (u roku od 15 dana nakon zahteva EIB-a sa listom odabranih ugovora) |
| Dokumenti/informacije | Krajnji rok | Učestalost izveštavanja |
| Izveštaj o napretku Projekta - Kratak pregled Tehničkog opisa, uz objašnjenje razloga za značajne promene u odnosu na početni obim; - Ažuriranje datuma završetka svake od glavnih komponenti projekta, uz objašnjenje razloga za svako moguće kašnjenje; - Ažuriranje o troškovima projekta, uz objašnjenje razloga za sve moguće varijacije troškova u odnosu na početno planirane troškove; - Ažurirana lista dodeljenih šema, uključujući za svaku šemu sledeće informacije: o Ugovori o povezanim radovima (ako ih ima više); o Ažurirani troškovi (uključujući sve varijacije) i odgovarajući podobni troškovi; o Dosadašnji rashodi. - Konsolidacija stvarnih troškova projekta do danas; - Opis svakog većeg problema sa uticajem na životnu sredinu i/ili društvenim uticajem; - Ažuriranje plana nabavki; - Ažuriranje o potražnji ili korišćenju projekta i komentari; - Ažuriranje o napretku u vezi sa rodnom ravnopravnošću (uključujući procenat zaposlenih žena i stope fluktuacije zaposlenih žena i muškaraca u svim kategorijama poslova). - Svaki značajan problem koji se pojavio i svaki značajan rizik koji može uticati na rad projekta; - Statistika o broju nesreća na radu (uključujući saobraćajne nesreće i probleme sa zdravljem i bezbednošću) na lokacijama projekta. - Bilo kakva pravna radnja u vezi sa projektom koja je možda u toku; - Nepoverljive slike vezane za projekat, ako su dostupne. - Svaka ažuriranja u razvoju i sprovođenju plana otpornosti na klimatske promene Zajmoprimca/Implementacionog entiteta od potpisivanja ugovora. | 1 godina nakon potpisivanja potpisivanja Finansijskog ugovora | Godišnje |
| Dokumenti/informacije | Datum dostavljanja Banci |
| Izveštaj o delimičnom završetku projekta i Izveštaj o završetku projekta, uključujući: - Konačni tehnički opis projekta kako je završen, sa objašnjenjem razloga za svaku značajnu promenu u poređenju sa Tehničkim opisom u A.1; - Datum završetka svake od glavnih komponenti projekta, uz objašnjenje razloga za svako moguće kašnjenje; - Konačna cena Projekta, uz objašnjenje razloga za sve moguće varijacije troškova u odnosu na početno planirane troškove; - Efekti projekta na zapošljavanje: broj ljudi po danima potreban tokom implementacije, kao i nova stalna radna mesta stvorena razvrstana po polu; - Opis svakog većeg problema sa uticajem na životnu sredinu ili društvenim uticajima; - Rezime napretka u vezi sa rodnom ravnopravnošću (uključujući procenat zaposlenih žena i stope fluktuacije žena i muškaraca u svim kategorijama poslova) tokom perioda projekta; - Rezime broja nesreća na radu (uključujući saobraćajne nesreće i probleme sa zdravljem i bezbednošću) na svim projektnim lokacijama tokom perioda trajanja projekta. - Ažuriranje o postupcima nabavke i objašnjenje odstupanja od plana nabavke; - Ažuriranje o potražnji ili korišćenju projekta i komentari; - Svaki značajan problem koji se pojavio i svaki značajan rizik koji može uticati na rad projekta; - Bilo kakva pravna radnja u vezi sa projektom koja je možda u toku. - Svako ažuriranje plana dekarbonizacije Zajmoprimca ili Rukovodioca grupe (uključujući ciljeve) ili plana otpornosti na klimatske promene od potpisivanja ugovora. - Nepoverljive slike vezane za projekat, ako su dostupne. - Ažuriranje sledećih indikatora praćenja: o Izmereni kvalitet hrapavosti kolovoza na deonicama obuhvaćenim programom u okviru tri opsega talasnih dužina merenja o Ukupna dužina autoputeva rehabilitovanih u okviru programa, u dužini kolovoza (jedan smer) i kilometrima trake o Broj smrtnih slučajeva na putevima na deonicama rehabilitovanim u okviru programa o Intenzitet saobraćaja na odgovarajućim deonicama puta (AADT) - Ažuriranje dodatnih indikatora praćenja dogovorenih u izveštaju Upravnog odbora | Izveštaj o završetku projekta: 15 meseci nakon završetka projekta |
| Dokumenti/informacije | Datum dostavljanja banci |
| Ažuriranje Indikatora praćenja navedenih u gornjoj tabeli. | 3 godine nakon izveštaja o završetku projekta |
| Jezik izveštaja | Engleski |
| Naziv relevantne sekcije | |||
| Upravljajuća institucija | |||
| ID puta | Datum poslednje investicije | ||
| Početni PK – Završni PK (zona intervencije) | - | Dužina Pod-projekta u (km) |
| Obnova ili rehabilitacija postojeće imovine (pločnik, drenažni sistem, potporni zidovi |
| itd.) koja se bliži kraju svog korisnog veka trajanja. | |
| Smanjenje troškova rada i održavanja. | |
| Usklađivanje postojeće infrastrukture i objekata sa važećim propisima. | |
| Poboljšanje otpornosti postojeće infrastrukture i objekata na klimatske promene. | |
| Poboljšanje bezbednosti na putevima. |
| Da li je završena Procena klimatskog rizika i ranjivosti (CRVA) podprojekta, sprovedena u skladu sa tehničkim kriterijumima za proveru kako je navedeno za značajan doprinos CC-A, kako je navedeno u Delegiranoj uredbi EU o taksonomiji 2021/2139 - Aneks 26? (da/ne) | |||
| Ako jeste, koje ključne klimatske opasnosti/rizici su razmatrani u proceni rizika? | |||
| Rizici (npr.) | Ocena rizika * | Predložene mere adaptacije (infrastrukturne ili operativne) | |
| Ekstremne temperature (uklj. toplotne talase) | |||
| Hladni periodi | |||
| Šteta od smrzavanja i odmrzavanja | |||
| Ekstremne padavine | |||
| Poplave | |||
| Nestabilnost tla/klizišta/erozije | |||
| Ekstremni vetrovi | |||
| Šumski požari | |||
| Magla | |||
| Drugo (molimo navedite) |
| Tekuća godina – 5 godina | Tekuća godina | Godina otvaranja za saobraćaj | Godina otvaranja za saobraćaj + 5 godina | |
| 2019. godina | 2024. godina | 2026. godina | 2031. godina | |
| Saobraćaj u AADT | ||||
| % HGV |
| Troškovi investicije, bez PDV-a (RSD) | Troškovi investicije, bez PDV-a (EUR) | |
| Zemljani radovi | ||
| Glavne konstrukcije mostova (>100m) | ||
| Glavni tuneli (>100m) | ||
| Opšte konstrukcije, uključujući zidove | ||
| Odvodnjavanje, uklj. cevovode | ||
| Potporne konstrukcije | ||
| Radovi na putevima i kolovozima - rekonstrukcija | ||
| Radovi na putevima i obnavljanje kolovoza | ||
| Bezbednosne mere (signalizacija, zaštitna ograda) | ||
| Instalacije (mašinske i električne) | ||
| Životna sredina (npr. buka, zaštita životinja) | ||
| Drugo | ||
| Otkup zemljišta | ||
| Tehničke nepredviđene situacije | ||
| Finansijske nepredviđene situacije | ||
| Ukupni troškovi | ||
| Troškovi koji su prihvatljivi za EIB |
| Početak | |
| Kraj |
| Ugovor | Procedura nabavke | Ukupna vrednost ugovora | Iznos dodeljen Pod-projektu | Procenjeni datum objavljivanja |
| Opis radova/usluga | Međunarodno, otvoreno, ograničeno … | EUR | EUR | |
| Da li je potrebna Procena uticaja na životnu sredinu (EIA)? | Da / Ne |
| Ako je nadležni organ odbacio pod-projekat, da li je taj organ doneo odluku da se ne zahteva procena uticaja na životnu sredinu? | Da / Ne / Nije dostupno |
| Ako je odgovor Da, navedite odluku (zajedno | |
| sa informacijama dostavljenim nadležnom | |
| organu kao osnovu za njihovu odluku). | |
| Da li je nadležni organ izdao ekološku dozvolu/saglasnost? | Da / Ne / Nije dostupno |
| Ako je odgovor Da, molimo vas da dostavite | |
| ovlašćenje/saglasnost koju je izdao nadležni | |
| organ. | |
| Da li su potrebne i/ili sprovedene druge studije koje se tiču ekoloških aspekata pod- projekta? | Da (molimo navedite) / Ne / Nije dostupno |
| Ako jeste, navedite potrebne ili sprovedene | |
| studije | |
| Da li se podprojekat nalazi u blizini zaštićenih lokacija (ili ima zaštićene lokacije unutar svoje zone uticaja), | Da / Ne |
| Da li je verovatno da će projekat imati značajan uticaj na obližnja zaštićena prirodna područja? | Da / Ne |
| Ako je odgovor Da, molimo vas da, gde je to | |
| relevantno, navedete referencu na studije u | |
| kojima su procenjeni ovi rizici i uticaji. Molimo | |
| vas da dostavite izjavu nadležnog organa za | |
| zaštitu životne sredine. | |
| Ako je odgovor ne, molimo vas da dostavite | |
| izjavu nadležnog organa zaštite životne | |
| sredine o odsustvu značajnih uticaja na | |
| lokacije | |
| Da li je sprovedena / da li će biti sprovedena javna konsultacija o dokumentu koji se odnosi na projekat? (Planska | Da / Ne / Nije dostupno |
| dokumentacija, ESMF, EIA ili bilo koja druga, kao što je vežba skrininga za životnu sredinu i bezbednost, kompletan ESMP ili ESMP kontrolna lista, RAP/LRP) | Ako je odgovor Da, opišite proces javnih |
| konsultacija koji će se sprovesti/sprovesti i | |
| učešće lokalnih zajednica i najranjivijih grupa, | |
| uključujući starosedelačke grupe/grupe za | |
| etiku manjina, gde je to primenljivo. | |
| I dostaviti sve relevantne dokumente vezane | |
| za angažovanje i konsultacije zainteresovanih | |
| strana* (uključujući dokumente vezane za | |
| FPIC**) | |
| Da li je projekat u skladu sa svim ekološkim zahtevima? (lokalnim i nacionalnim) | Da / Ne |
| Molimo vas da dostavite spisak ekoloških | |
| zahteva kojima podprojekat podleže. | |
| Da li projekat ima neka posebna društvena pitanja (nedobrovoljno ekonomsko i/ili fizičko raseljavanje, uticaji na ranjive grupe, radni standardi, zdravlje, bezbednost i sigurnost na radu)? | Da / Ne |
| Ako je odgovor Da, molimo vas da, gde je to | |
| relevantno, navedete referencu na studije u | |
| kojima su procenjeni ovi rizici i uticaji. | |
| Kako Izvršilac projekta namerava da prati učinke u oblasti životne sredine i bezbednosti, kao i zdravlja i bezbednosti na licu mesta pod-projekta? | Molimo vas da, gde je to relevantno, uključite |
| referencu na dokumenta u kojima | |
| Implementacioni entitet navodi glavne | |
| indikatore zaštite životne sredine i | |
| bezbednosti, kao i zaštite zdravlja i | |
| bezbednosti koji će se pratiti i o kojima će se | |
| izveštavati, kao i da objasni uloge i | |
| odgovornosti za praćenje i izveštavanje. | |
| Da li se projekat bavi poznatim problemom bezbednosti na putevima | Da / Ne. |
| Ako jeste, molimo vas da navedete kratak opis |
| (1) | Red |
| (2) | ID Puta |
| (3) | Naziv Pod-projekta (ime deonice) |
| (4),(5) | Područje intervencije gde će se radovi izvoditi (početni km i krajnji km, po rastućem redosledu km) |
| (6) | Dužina područja intervencije trake, km (dužina pomnožena sa brojem dotičnih traka) |
| (7), (8) | Prosečan godišnji dnevni saobraćaj (AADT) deonice koja odgovara području intervencije, kao i procenat teretnih vozila (HGV). Napravite ponderisani prosek ako je posao raspoređen na dve različite homogene deonice |
| (9),(10) | Procena prosečnog godišnjeg dnevnog saobraćaja (AADT) deonice koja odgovara području intervencije, kao i procenat teretnih vozila (HGV) pet godina nakon završetka radova. Napraviti ponderisani prosek ako je rad raspoređen na dve različite homogene deonice |
| (11) | Ukratko opišite radove koji će se izvoditi na kolovozu, objektima, drenažnoj mreži, nasipima, opremi itd. |
| (12) | Očekivani datum početka i završetka radova |
| (13)-(14) | Procena ukupnih troškova investicije u RSD i EUR |
| (15)-(17) | Procena ukupnih troškova investicije u evrima, umanjenih za neprihvatljive troškove |
| (18) | Molimo navedite postupak tendera — „I” Međunarodni tender, „N” Nacionalni postupak, „Ne” Pregovarački postupak, „D” Direktna dodela, „Em” Hitni postupak i „C” Konsultacije (gde je samo nekoliko kompanija pozvano da dostave ponude). |
| (19) | Navedite da li je područje intervencije potprojekta bilo predmet Analize ranjivosti na klimatske rizike (CRVA) sprovedene u skladu sa tehničkim kriterijumima za proveru kako je navedeno za značajan doprinos CC-A, kako je navedeno u Delegiranoj uredbi EU o taksonomiji 2021/2139 - Aneks 2, i potvrdite eksplicitno pozivanje projektne dokumentacije na CRVA (navedite referencu) |
| (20) | Navedite glavne ranjivosti dela podprojekta sa nivoom ranjivosti infrastrukture (nizak/srednji/jak) |
| (21) | Opišite izabrana tehnička rešenja i kako ona smanjuju ključne ranjivosti infrastrukture |
| (22) | Navedite da li rad uključuje rešavanje problema bezbednosti na putevima (da/ne) |
| (23) | Opišite intervencije za poboljšanje bezbednosti u saobraćaju i intervencije na opremi za bezbednost u saobraćaju |
| (24) | Procenite procenat troškova rada na intervencijama opisanim u (23) |
| (25) | Molimo navedite postupak ekološke provere i/ili postupak procene uticaja na životnu sredinu koji treba pratiti („N/D” ako nije primenljivo). Molimo vas da naznačite da li postoje i/ili su sprovedene druge studije u vezi sa ekološkim i društvenim aspektima podprojekta? Ako jeste, navedite koje su studije potrebne ili sprovedene. Ako je dostupno, molimo vas da dostavite dozvolu/saglasnost za procenu uticaja na životnu sredinu koju izdaje nadležni organ ili, ako je odbijena, odluku da se ne zahteva procena uticaja na životnu sredinu koju izdaje nadležni organ, gde je to primenljivo (zajedno sa informacijama dostavljenim nadležnom organu kao osnova za njihovu odluku). Da li je sprovedena / da li će biti sprovedena javna konsultacija o dokumentu koji se odnosi na projekat? (Glavni plan, ESMF, EIA ili bilo koji drugi, kao što je kontrolna lista za skrining za životnu sredinu i bezbednost, kontrolna lista ESMP, RAP/LRP). Ako jeste, opišite proces javne konsultacije koji će biti sproveden / sproveden. |
| (26) | U vezi sa uticajem projekta na zaštićena staništa od međunarodnog ili nacionalnog značaja. Molimo vas da naznačite: (A) Nema značajnog uticaja, potencijalnog ili verovatnog, na zaštićeno područje. U ovom slučaju, molimo vas da dostavite izjavu nadležnog organa zaštite životne sredine u vezi sa odsustvom ili nepostojanjem značajnih uticaja na područja. (B) Značajan uticaj, potencijalan ili verovatan, na zaštićeno područje. U ovom slučaju, navedite odgovarajuće studije koje se planiraju sprovesti/sprovode i potrebne dozvole. |
| (C) Nije primenljivo | |
| (27) | Molimo vas da naznačite: A) Preseljavanje* više od 200 ljudi pogođenih projektom (PAP). B) Ponovna instalacija manje od 200 PAP. C) Bez preseljenja. U oba slučaja, A ili B, dostavite Plan za obnavljanje sredstava za život ili Akcioni plan za preseljenje pripremljen na osnovu odobrenog opšteg pristupa u slučaju preseljenja. *Preseljavanje se odnosi na raseljavanje koje se dešava kao direktna posledica sticanja zemljišta ili ograničenja korišćenja zemljišta u vezi sa projektom. Ono uključuje: (a) fizičko raseljavanje (tj. fizičko premeštanje, gubitak prebivališta ili gubitak skloništa); i/ili (b) ekonomsko raseljavanje (tj. gubitak imovine ili pristupa imovini, što dovodi do gubitka izvora prihoda ili sredstava za život). Preseljavanje je prisilno kada pogođeni pojedinci ili zajednice nemaju pravo da odbiju takvo raseljavanje. |
| (28) | Molimo vas da naznačite: A) Sticanje zemljišta*. U ovom slučaju, navedite Plan za obnovu sredstava za život ili Akcioni plan preseljenja na osnovu odobrenog opšteg pristupa u slučaju sticanja zemljišta. B) Bez otkupa zemljišta. *Sticanje zemljišta odnosi se na sve metode sticanja zemljišta za projektne svrhe, što može uključivati potpunu kupovinu, eksproprijaciju zemljišta i imovine i sticanje privremenih ili stalnih prava pristupa, kao što su servituti, prava prolaza i uspostavljanje ograničenja pristupa zaštićenim i drugim područjima. |
| (29) | Molimo vas da naznačite: (A) Potencijalno pogođene ranjive grupe. U ovom slučaju, navedite opis ranjivih grupa, kao i planirani postupak angažovanja i konsultacija sa zainteresovanim stranama, uključujući i povezana dokumenta *. (A) Autohtone grupe/manjinske etičke grupe koje su potencijalno pogođene. U ovom slučaju, navedite opis autohtonih grupa/manjinskih etičkih grupa, kao i planirani postupak angažovanja i konsultacija sa zainteresovanim stranama, uključujući i povezana dokumenta vezana za FPIC** (C) Nije pogođena nijedna ranjiva grupa niti autohtone grupe/grupe manjinske etike. * Dokumenti koji dokazuju da će angažovanje zainteresovanih strana i konsultacije biti/su sprovedeni u skladu sa Standardom 7 standarda EIB-a. ** FPIC: Slobodan, prethodni i informisani pristanak. Odnosi se na dokumente koji demonstriraju iterativni proces kojim pogođena zajednica autohtonih naroda postiže dogovor u dovoljnom roku i u skladu sa svojim kulturnim tradicijama i praksama. |
| (30) | Molimo vas da naznačite kako promoter namerava da prati učinak u oblasti zaštite životne sredine i bezbednosti, kao i zdravlja i bezbednosti? Molimo vas da, po potrebi, navedete reference na studije u kojima su procenjeni rizici i uticaji u oblasti životne sredine i bezbednosti, kao i zdravlja i bezbednosti, kao i glavne indikatore životne sredine i bezbednosti, kao i zdravlja i bezbednosti koji se prate/će se pratiti i o kojima se izveštava, kao i uloge i odgovornosti za praćenje i izveštavanje. |